Skip to content
PlanIndex Get alerts
Menu

Planning application

Development Site At Former Brook Shed New Road Earby Lancashire

Granted Pendle 26/0318/CND Discharge Condition

Relates to 24/0213/VAR

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Approval of Details Reserved by Condition: Discharge Condition 8 (Remediation Measures) of Planning Permission 24/0213/VAR.

As published by the council, reference 26/0318/CND

Application record

Reference
26/0318/CND
Type
Discharge Condition
Status
Decided
Decision
Granted As published: Conditions Discharged
Received
14 May 2026
Validated
14 May 2026
Decided
16 Jun 2026
Ward
Earby & Coates
Parish
Earby Town Council
Decision by
Delegated Decision

Site history

Applications at this address on the Pendle register

This site has had 5 applications since 2024: 5 approved, 0 refused.

  • 26/0233/NMA Granted

    Development Site At Former Brook Shed New Road Earby Lancashire

    Non- Material Amendment: Demolition of existing electricity substation, erection of a replacement substation and the provision of landscaped open space in place of existing substation of Planning Permission 24/0213/VAR.

    Decided 6 May 2026 Amendments
  • 25/0032/NMA Granted

    Development Site At Former Brook Shed New Road Earby Lancashire

    Non-Material Amendment: Inclusion of a 2m footpath link from adoptable highway to development boundary, replacement of 403 house types with 404 house types and the replacement of a 0.6 high post and wire plot divisional fence with a 1.8m high feather edged board timber fence of Planning Permission 24/0213/VAR.

    Decided 4 Jun 2025 Amendments
  • 24/0576/CND Granted

    Development Site At Former Brook Shed New Road Earby Lancashire

    Approval of Details Reserved by Condition: Discharge Condition 8 (Remediation Measures) of Planning Permission 24/0213/VAR.

    Decided 12 Nov 2024 Conditions
  • 24/0213/VAR Granted

    Development Site At Former Brook Shed New Road Earby Lancashire

    Variation of Condition: Regularise Condition 1 (Implementation of timescales), Vary Condition 2 (Plans), Condition 3 (Materials), Condition 4 (Materials), Condition 5 (Materials), Condition 7 (Landscaping Scheme); Compliance of Conditions: Condition 8 (Management and Maintenance), Condition 9 (Construction Method Statement), Condition 10 (Ecological Mitigation Scheme), Condition 12 (Flood Risk Assessment), Condition 13 (Maintenance Scheme), Condition 14 (Site Specific Flood Risk Assessment), Condition 15 (Sustainable Drainage Strategy), Condition 16 (Construction Surface Water Management Plan), Condition 17 (Site-Specific Operation Manual), Condition 20 (Construction of Site Access and Off-site works), Condition 21 (Full Engineering, Drainage, Street Lighting and Constructional Details of roads and footways), Condition 22 (Management and Maintenance of estate roads and footways); Removal of Conditions: Condition 19 (Flood Resilience Measure), Condition 25 (Highway boundary wall), Condition 29 (Archaeological Recording) and Condition 30 (Historic Record) of Planning Permission 22/0577/FUL.

    Decided 8 Aug 2024 Amendments

Timeline

Dates from the published record

  1. 14 May 2026

    Received by Pendle

  2. 16 Jun 2026

    Decision issued: Conditions Discharged

  3. 27 Aug 2026

    Added to PlanIndex

Cases linked to this one on the register

  • 24/0213/VAR Granted

    Development Site At Former Brook Shed New Road Earby Lancashire

    Variation of Condition: Regularise Condition 1 (Implementation of timescales), Vary Condition 2 (Plans), Condition 3 (Materials), Condition 4 (Materials), Condition 5 (Materials), Condition 7 (Landscaping Scheme); Compliance of Conditions: Condition 8 (Management and Maintenance), Condition 9 (Construction Method Statement), Condition 10 (Ecological Mitigation Scheme), Condition 12 (Flood Risk Assessment), Condition 13 (Maintenance Scheme), Condition 14 (Site Specific Flood Risk Assessment), Condition 15 (Sustainable Drainage Strategy), Condition 16 (Construction Surface Water Management Plan), Condition 17 (Site-Specific Operation Manual), Condition 20 (Construction of Site Access and Off-site works), Condition 21 (Full Engineering, Drainage, Street Lighting and Constructional Details of roads and footways), Condition 22 (Management and Maintenance of estate roads and footways); Removal of Conditions: Condition 19 (Flood Resilience Measure), Condition 25 (Highway boundary wall), Condition 29 (Archaeological Recording) and Condition 30 (Historic Record) of Planning Permission 22/0577/FUL.

    Decided 8 Aug 2024 Amendments

Who's behind it

Company information only, from the register and Companies House

Pegasus Group Ltd Agent

1,231 applications on PlanIndex · across 171 councils · 91% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

15 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Pendle granted permission on 16 June 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Development Site At Former Brook Shed New Road Earby Lancashire

    24/0576/CND Submitted 27 Aug 2024 50 yards away

    Approval of Details Reserved by Condition: Discharge Condition 8 (Remediation Measures) of Planning Permission 24/0213/VAR.

    Granted Conditions 8 docs
  • Site Of Former Brook Shed New Road Earby Lancashire

    23/0711/CND Submitted 24 Oct 2023 50 yards away

    Approval of Details Reserved by Condition: Discharge Condition 3 (Materials of Walls and Roof), Condition 4 (Details of Windows and Doors), Condition 5 (Materials and finishes of plots), Condition 6 (Window Openings), Condition 8 (Landscaping), Condition 9 (Construction Method Statement), Condition 10 (Scheme of Ecological Mitigation), Condition 11 (Contamination), Condition 12 (Flood Risk Mitigation Measures), Condition 13 (Maintenance Scheme), Condition 15 (Surface Water Sustainable Drainage Strategy), Condition 16 (Construction Surface Water Management Plan), Condition 17 (Operation and Maintenance Manual), Condition 19 (Flood Resilience Measures), Condition 20 (Construction of Site Access and Off-Site works), Condition 21 (Full Engineering, Drainage, Street Lighting and Constructional Details), Condition 22 (Management and Maintenance of Estate Road and Footways), Condition 24 (Visibility Splays), Condition 25 (Highway Boundary Wall) and Condition 29 (Archaeological Recording) of Planning Permission 22/0577/FUL.

    Withdrawn Conditions Windows or glazing 91 docs
    Small domestic
  • Development Site At Former Brook Shed New Road Earby Lancashire

    25/0032/NMA Submitted 20 Jan 2025 50 yards away

    Non-Material Amendment: Inclusion of a 2m footpath link from adoptable highway to development boundary, replacement of 403 house types with 404 house types and the replacement of a 0.6 high post and wire plot divisional fence with a 1.8m high feather edged board timber fence of Planning Permission 24/0213/VAR.

    Granted Amendments 11 docs
    Major scheme
  • Development Site At Former Brook Shed New Road Earby Lancashire

    26/0233/NMA Submitted 8 Apr 2026 50 yards away

    Non- Material Amendment: Demolition of existing electricity substation, erection of a replacement substation and the provision of landscaped open space in place of existing substation of Planning Permission 24/0213/VAR.

    Granted Amendments Demolition 9 docs
  • Development Site At Former Brook Shed New Road Earby Lancashire

    24/0213/VAR Submitted 25 Mar 2024 50 yards away

    Variation of Condition: Regularise Condition 1 (Implementation of timescales), Vary Condition 2 (Plans), Condition 3 (Materials), Condition 4 (Materials), Condition 5 (Materials), Condition 7 (Landscaping Scheme); Compliance of Conditions: Condition 8 (Management and Maintenance), Condition 9 (Construction Method Statement), Condition 10 (Ecological Mitigation Scheme), Condition 12 (Flood Risk Assessment), Condition 13 (Maintenance Scheme), Condition 14 (Site Specific Flood Risk Assessment), Condition 15 (Sustainable Drainage Strategy), Condition 16 (Construction Surface Water Management Plan), Condition 17 (Site-Specific Operation Manual), Condition 20 (Construction of Site Access and Off-site works), Condition 21 (Full Engineering, Drainage, Street Lighting and Constructional Details of roads and footways), Condition 22 (Management and Maintenance of estate roads and footways); Removal of Conditions: Condition 19 (Flood Resilience Measure), Condition 25 (Highway boundary wall), Condition 29 (Archaeological Recording) and Condition 30 (Historic Record) of Planning Permission 22/0577/FUL.

    Granted Amendments 148 docs
    Small domestic
  • Site Of Former Brook Shed New Road Earby Lancashire

    22/0577/FUL Submitted 24 Aug 2022 50 yards away

    Full: Major: Erection of 50 dwellings with associated access and landscaping, demolition of Brook Shed engine house, chimney stack, and remaining sections of north elevation of the former weaving shed, boiler house and water tank.

    Granted Full applications Demolition 165 docs
    Major scheme

In Pendle

  • 26/0680/CND Awaiting decision

    Land To The West Of St Philips School Oakland Street Nelson Lancashire

    Approval of Details Reserved by Condition: Discharge Condition 6 (Construction Method Statement) and Condition 7 (Off-site highway works) of Planning Permission 26/0251/FUL.

    Received 30 Sep, published by the council 6 Oct 2026 Conditions
  • 26/0669/CND Awaiting decision

    Moorlands Skipton Old Road Foulridge Lancashire BB8 7QG

    Approval of Details Reserved by Condition: Discharge Condition 5 (Landscaping Scheme) and Biodiversity Net Gain Condition (Biodiversity Gain Plan) of Planning Permission 25/0654/FUL.

    Received 24 Sep, published by the council 1 Oct 2026 Conditions
  • 26/0662/CND Awaiting decision

    Unit 4 Silk Way Business Park Whitewalls Drive Colne Lancashire BB8 9FJ

    Approval of Details Reserved by Condition: Discharge Condition 16 (Surface Water Sustainable Drainage Strategy) and Condition 23 (Tree Protection Measures including protective fencing) of Planning Permission 26/0185/FUL.

    Received 21 Sep, published by the council 23 Sep 2026 Conditions
  • 26/0650/CND Awaiting decision

    Pendleside Hospice Colne Road Brierfield Lancashire BB10 2LW

    Approval of Details Reserved by Condition: Discharge Condition 3 (Materials) and Condition 4 (Construction Method Statement) of Planning Permission 25/0728/FUL.

    Received 16 Sep, published by the council 21 Sep 2026 Conditions
  • 26/0486/CND Granted

    Doughty Farm Back Lane Southfield Lancashire BB10 3RG

    Approval of Details Reserved by Condition: Discharge Condition 9 (Aviation lighting scheme) and Condition 10 (Height details and turbine location) of Planning Permission 26/0308/VAR.

    Received 23 Jul, published by the council 30 Jul 2026 Conditions