Planning application
Development Site At Former Brook Shed New Road Earby Lancashire
Relates to 24/0213/VAR
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Approval of Details Reserved by Condition: Discharge Condition 8 (Remediation Measures) of Planning Permission 24/0213/VAR.
As published by the council, reference 24/0576/CND
Application record
- Reference
- 24/0576/CND
- Type
- Discharge Condition
- Status
- Decided
- Decision
- Conditions Partially Discharged
- Received
- 27 Aug 2024
- Validated
- 27 Aug 2024
- Decided
- 12 Nov 2024
- Ward
- Earby & Coates
- Parish
- Earby Town Council
- Decision by
- Delegated Decision
Site history
Applications at this address on the Pendle register
This site has had 5 applications since 2024: 5 approved, 0 refused.
-
26/0318/CND Granted
Development Site At Former Brook Shed New Road Earby Lancashire
Approval of Details Reserved by Condition: Discharge Condition 8 (Remediation Measures) of Planning Permission 24/0213/VAR.
-
26/0233/NMA Granted
Development Site At Former Brook Shed New Road Earby Lancashire
Non- Material Amendment: Demolition of existing electricity substation, erection of a replacement substation and the provision of landscaped open space in place of existing substation of Planning Permission 24/0213/VAR.
-
25/0032/NMA Granted
Development Site At Former Brook Shed New Road Earby Lancashire
Non-Material Amendment: Inclusion of a 2m footpath link from adoptable highway to development boundary, replacement of 403 house types with 404 house types and the replacement of a 0.6 high post and wire plot divisional fence with a 1.8m high feather edged board timber fence of Planning Permission 24/0213/VAR.
-
24/0213/VAR Granted
Development Site At Former Brook Shed New Road Earby Lancashire
Variation of Condition: Regularise Condition 1 (Implementation of timescales), Vary Condition 2 (Plans), Condition 3 (Materials), Condition 4 (Materials), Condition 5 (Materials), Condition 7 (Landscaping Scheme); Compliance of Conditions: Condition 8 (Management and Maintenance), Condition 9 (Construction Method Statement), Condition 10 (Ecological Mitigation Scheme), Condition 12 (Flood Risk Assessment), Condition 13 (Maintenance Scheme), Condition 14 (Site Specific Flood Risk Assessment), Condition 15 (Sustainable Drainage Strategy), Condition 16 (Construction Surface Water Management Plan), Condition 17 (Site-Specific Operation Manual), Condition 20 (Construction of Site Access and Off-site works), Condition 21 (Full Engineering, Drainage, Street Lighting and Constructional Details of roads and footways), Condition 22 (Management and Maintenance of estate roads and footways); Removal of Conditions: Condition 19 (Flood Resilience Measure), Condition 25 (Highway boundary wall), Condition 29 (Archaeological Recording) and Condition 30 (Historic Record) of Planning Permission 22/0577/FUL.
Timeline
Dates from the published record
-
27 Aug 2024
Received by Pendle
-
12 Nov 2024
Decision issued: Conditions Partially Discharged
-
30 Jul 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
-
24/0213/VAR Granted
Development Site At Former Brook Shed New Road Earby Lancashire
Variation of Condition: Regularise Condition 1 (Implementation of timescales), Vary Condition 2 (Plans), Condition 3 (Materials), Condition 4 (Materials), Condition 5 (Materials), Condition 7 (Landscaping Scheme); Compliance of Conditions: Condition 8 (Management and Maintenance), Condition 9 (Construction Method Statement), Condition 10 (Ecological Mitigation Scheme), Condition 12 (Flood Risk Assessment), Condition 13 (Maintenance Scheme), Condition 14 (Site Specific Flood Risk Assessment), Condition 15 (Sustainable Drainage Strategy), Condition 16 (Construction Surface Water Management Plan), Condition 17 (Site-Specific Operation Manual), Condition 20 (Construction of Site Access and Off-site works), Condition 21 (Full Engineering, Drainage, Street Lighting and Constructional Details of roads and footways), Condition 22 (Management and Maintenance of estate roads and footways); Removal of Conditions: Condition 19 (Flood Resilience Measure), Condition 25 (Highway boundary wall), Condition 29 (Archaeological Recording) and Condition 30 (Historic Record) of Planning Permission 22/0577/FUL.
Who's behind it
Company information only, from the register and Companies House
Pegasus Group Ltd Agent
981 applications on PlanIndex · across 162 councils · 89% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
8 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Pendle granted permission on 12 November 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Site Of Former Brook Shed New Road Earby Lancashire
Approval of Details Reserved by Condition: Discharge Condition 3 (Materials of Walls and Roof), Condition 4 (Details of Windows and Doors), Condition 5 (Materials and finishes of plots), Condition 6 (Window Openings), Condition 8 (Landscaping), Condition 9 (Construction Method Statement), Condition 10 (Scheme of Ecological Mitigation), Condition 11 (Contamination), Condition 12 (Flood Risk Mitigation Measures), Condition 13 (Maintenance Scheme), Condition 15 (Surface Water Sustainable Drainage Strategy), Condition 16 (Construction Surface Water Management Plan), Condition 17 (Operation and Maintenance Manual), Condition 19 (Flood Resilience Measures), Condition 20 (Construction of Site Access and Off-Site works), Condition 21 (Full Engineering, Drainage, Street Lighting and Constructional Details), Condition 22 (Management and Maintenance of Estate Road and Footways), Condition 24 (Visibility Splays), Condition 25 (Highway Boundary Wall) and Condition 29 (Archaeological Recording) of Planning Permission 22/0577/FUL.
Withdrawn Conditions Windows or glazing 91 docsSmall domestic -
Development Site At Former Brook Shed New Road Earby Lancashire
Approval of Details Reserved by Condition: Discharge Condition 8 (Remediation Measures) of Planning Permission 24/0213/VAR.
Granted Conditions 15 docs -
Development Site At Former Brook Shed New Road Earby Lancashire
Non-Material Amendment: Inclusion of a 2m footpath link from adoptable highway to development boundary, replacement of 403 house types with 404 house types and the replacement of a 0.6 high post and wire plot divisional fence with a 1.8m high feather edged board timber fence of Planning Permission 24/0213/VAR.
Granted Amendments 11 docsMajor scheme -
Development Site At Former Brook Shed New Road Earby Lancashire
Non- Material Amendment: Demolition of existing electricity substation, erection of a replacement substation and the provision of landscaped open space in place of existing substation of Planning Permission 24/0213/VAR.
Granted Amendments Demolition 9 docs -
Development Site At Former Brook Shed New Road Earby Lancashire
Variation of Condition: Regularise Condition 1 (Implementation of timescales), Vary Condition 2 (Plans), Condition 3 (Materials), Condition 4 (Materials), Condition 5 (Materials), Condition 7 (Landscaping Scheme); Compliance of Conditions: Condition 8 (Management and Maintenance), Condition 9 (Construction Method Statement), Condition 10 (Ecological Mitigation Scheme), Condition 12 (Flood Risk Assessment), Condition 13 (Maintenance Scheme), Condition 14 (Site Specific Flood Risk Assessment), Condition 15 (Sustainable Drainage Strategy), Condition 16 (Construction Surface Water Management Plan), Condition 17 (Site-Specific Operation Manual), Condition 20 (Construction of Site Access and Off-site works), Condition 21 (Full Engineering, Drainage, Street Lighting and Constructional Details of roads and footways), Condition 22 (Management and Maintenance of estate roads and footways); Removal of Conditions: Condition 19 (Flood Resilience Measure), Condition 25 (Highway boundary wall), Condition 29 (Archaeological Recording) and Condition 30 (Historic Record) of Planning Permission 22/0577/FUL.
Granted Amendments 148 docsSmall domestic -
Site Of Former Brook Shed New Road Earby Lancashire
Full: Major: Erection of 50 dwellings with associated access and landscaping, demolition of Brook Shed engine house, chimney stack, and remaining sections of north elevation of the former weaving shed, boiler house and water tank.
Granted Full applications Demolition 165 docsMajor scheme
Other condition discharge and variation applications
In Pendle
-
26/0511/CND Granted
Craven Lea Noggarth Road Fence Lancashire BB12 9PP
Approval of Details Reserved by Condition: Discharge Condition 6 (Management details and disposal of manure) of Planning Permission 24/0370/FUL.
-
26/0441/CND Granted
Seg Hole Farm Hollin Hall Trawden Lancashire BB8 8PU
Approval of Details Reserved by Condition: Discharge Condition 3 (Material and Finishes), Condition 4 (Method Statement) and Condition 6 (Preliminary Habitat Survey) of Planning Permission 26/0167/FUL.
-
26/0459/CND Granted
38 Skipton Old Road Colne Lancashire BB8 7AD
Approval of Details Reserved by Condition: Discharge Condition 4 (Sample and colour of K-Render) of Planning Permission 23/0125/HHO.
-
26/0484/CND Granted
Barn Cottage 32 Colne Road Trawden Lancashire BB8 8NX
Approval of Details Reserved by Condition: Discharge Condition 3 (External Materials) of Planning Permission 23/0278/HHO.
-
26/0315/CND Granted
Remains Of Dotcliffe Mill Dotcliffe Road Kelbrook Lancashire
Approval of Details Reserved by Condition: Discharge Condition 3 (Materials), Condition 4 (Construction Method Statement), Condition 11 (Scheme for disposal of Foul and Surface Water), Condition 15 (Method Statement), Condition 16 (Dust control) and Condition 17 (Scheme for protecting residential and business neighbours from noise and vibration) of Planning Permission 26/0078/FUL.