Skip to content
PlanIndex Get alerts
Menu

Planning application

The Gasworks Sudbury School Lane Sudbury Derbyshire DE6 5HZ

Granted Peak District National Park 26/00380/LBALT Listed Building Consent (Alts/Ext)

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Works to floor within retort house

As published by the council, reference 26/00380/LBALT

Application record

Reference
26/00380/LBALT
Type
Listed Building Consent (Alts/Ext)
Status
Permitted with Conditions
Decision
Granted with Conditions
Received
2 Apr 2026
Validated
22 Apr 2026
Decided
28 Jul 2026
Ward
Doveridge And Sudbury
Parish
Sudbury
Decision by
Delegated
Postcode
DE6 5HZ

Site history

Applications at this address on the Peak District National Park register

This site has had 2 applications since 2025: 1 approved, 1 refused.

  • 25/00468/LBALT Refused

    The Gasworks Sudbury School Lane Sudbury Derbyshire DE6 5HZ

    Removal of existing floor within retort and replacement with new insulated and breathable limecrete floor with UFH

    Decided 30 Sep 2025 Heritage and listed buildings

Timeline

Dates from the published record

  1. 2 Apr 2026

    Received by Peak District National Park

  2. 22 Apr 2026

    Validated

    Checked as complete and ready for consideration.

  3. 21 Jul 2026

    Added to PlanIndex

  4. 28 Jul 2026

    Decision issued: Granted with Conditions

Cases linked to this one on the register

  • Application: 23/00053/FUL (Permitted with Conditions)

Who's behind it

Company information only, from the register and Companies House

James Boon Architects Agent, an architecture practice registered in Matlock

Active · incorporated 2018 · Matlock

101 applications on PlanIndex · across 5 councils · 98% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

Documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Peak District National Park granted permission on 28 July 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Peak District National Park

  • 26/00588/LBALT Granted

    Bank House 1 Compton Ashbourne Derbyshire DE6 1DY

    External works to include re-pointing of damaged brickwork. Re-decorating of wooden doors and windows and removal of air-conditioning units/pipework and cabling.

    22 May 2026 Heritage and listed buildings
  • 26/00737/LBALT Granted

    1A Buxton Road Ashbourne Derbyshire DE6 1EX

    Replacement of eight existing timber windows to the west and south elevations of the Grade II listed building.

    6 Jul 2026 Heritage and listed buildings
  • 26/00399/LBALT Granted

    Masson Mills 41 Derby Road Matlock Bath Derbyshire

    Alterations to door hardware on four doors on Level 1 of Arkwright Mill

    9 Apr 2026 Heritage and listed buildings
  • 26/00754/LBALT Granted

    Garden House Main Street Carsington Derbyshire DE4 4DE

    Replacement windows and front door to existing Grade 2 listed dwelling.

    8 Jul 2026 Heritage and listed buildings
  • 26/00522/LBALT Granted

    Sudbury Hall Main Road Sudbury Derbyshire DE6 5HT

    Proposed internal works including the repair of flooring, removal and replacement of ceilings, providing fire compartmentation through floors and walls, infill wall voids, intumescent grilles and firestopping as required

    8 May 2026 Heritage and listed buildings