Skip to content
PlanIndex Get alerts
Menu

Planning application

Hopton Hall Main Street Hopton Derbyshire DE4 4DF

Granted Peak District National Park 24/00942/FUL Full Planning Permission

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Replacement porch

As published by the council, reference 24/00942/FUL

Application record

Reference
24/00942/FUL
Type
Full Planning Permission
Status
Permitted with Conditions
Decision
Granted As published: Granted with Conditions
Received
24 Oct 2024
Validated
24 Oct 2024
Decided
10 Dec 2024
Ward
Wirksworth
Parish
Hopton
Decision by
Delegated
Postcode
DE4 4DF

Site history

Applications at this address on the Peak District National Park register

This site has had 10 applications since 2020: 9 approved, 1 refused.

  • Hopton Hall Main Street Hopton Derbyshire DE4 4DF

    Disccharge of Conditions 3, 4 and 5 of application 24/00753/LBALT - Internal alterations and refurbishment including replacing glazing to existing windows and new windows and doors

    Decided 17 Jul 2026 Conditions
  • T/26/00073/TCA Granted

    Hopton Hall Main Street Hopton Derbyshire DE4 4DF

    1no. horse chestnut - removal of top crown to leave approx 10m high stump due to cancer disease

    Decided 13 May 2026 Trees
  • 26/00111/LBALT Granted

    Hopton Hall Main Street Hopton Derbyshire DE4 4DF

    Replace existing swimming pool with new pool, internal alterations to form WC and plant room, new heating and ventilation system and replace existing windows with new windows.

    Decided 24 Mar 2026 Heritage and listed buildings
  • 25/00381/LBALT Refused

    Hopton Hall Main Street Hopton Derbyshire DE4 4DF

    Internal alterations to existing holiday accommodation

    Decided 30 Sep 2025 Heritage and listed buildings
  • 24/00754/LBALT Granted

    Hopton Hall Main Street Hopton Derbyshire DE4 4DF

    Replacement porch and internal alterations to existing holiday accommodation

    Decided 26 Nov 2024 Heritage and listed buildings
  • 24/00753/LBALT Granted

    Hopton Hall Main Street Hopton Derbyshire DE4 4DF

    Internal alterations and refurbishment including replacing glazing to existing windows and new windows and doors.

    Decided 23 Dec 2025 Heritage and listed buildings
  • T/23/00178/TCA Granted

    Hopton Hall Main Street Hopton Derbyshire DE4 4DF

    T1 Horse Chestnut remove 3 lowest limbs T9 Norway spruce Fell to as close to ground level as possible T10 Horse chestnut dismantle using mewp to a monolith at approx. 5m T11 Ash monolith to approx. 5m using a mewp

    Decided 26 Oct 2023 Trees
  • 23/00921/FUL Granted

    Hopton Hall Main Street Hopton Derbyshire DE4 4DF

    Conversion and extension of garages to cafe (Use Class E). Demolition of stables and erection of ticket office and toilet building

    Decided 20 Oct 2023 Full applications
  • T/20/00151/TCA Granted

    Hopton Hall Main Street Hopton Derbyshire DE4 4DF

    Works to 1no. Mature Beech tree (T1) - Reduce back to suitable growth points by approx. 7m

    Decided 23 Oct 2020 Trees

Timeline

Dates from the published record

  1. 24 Oct 2024

    Received by Peak District National Park

  2. 10 Dec 2024

    Decision issued: Granted with Conditions

  3. 28 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Channel Design ltd. Agent, a design practice registered in Ashbourne

Active · incorporated 2009 · Ashbourne

351 applications on PlanIndex · across 6 councils · 96% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

Documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Peak District National Park granted permission on 10 December 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In Peak District National Park

  • 26/00979/FUL Awaiting decision

    Beechview Post Office Lane Brailsford Derbyshire DE6 3BT

    Extension to dwelling and replacement garage

    Received 11 Sep, published by the council 15 Sep 2026 Full applications
  • 26/00507/FUL Refused

    Round Oak Farm Slade Lane Mercaston Derbyshire DE6 3DZ

    Erection of a rural workers' dwelling to replace temporary caravan

    Received 6 May, published by the council 21 Jul 2026 Full applications
  • 26/00807/FUL Granted

    2 Hurds Hollow Matlock Derbyshire DE4 3JZ

    Erection of 3m by 3.5m wooden gazebo to front elevation

    Received 23 Jul, published by the council 3 Aug 2026 Full applications
  • 26/00974/FUL Awaiting decision

    196 Dale Road Matlock Bath Derbyshire DE4 3PT

    Retention of raised decking (retrospective) with the addition of metal balustrading to front lower terrace and erection of garden room to upper front terrace

    Received 10 Sep, published by the council 15 Sep 2026 Full applications
  • 26/00976/FUL Awaiting decision

    Jasmine Cottage Longford Lane Sutton On The Hill Derbyshire DE6 5JB

    Proposed erection of a conservatory

    Received 10 Sep, published by the council 15 Sep 2026 Full applications