Planning application
24/00788/FUL
8 Rockside View Matlock Derbyshire DE4 3GP
Proposal
Installation of air source heat pump
As published by the council, reference 24/00788/FUL
Timeline
Dates from the published record
-
6 Sep 2024
Received by Peak District National Park
-
11 Sep 2024
Validated
Checked as complete and ready for consideration.
-
4 Nov 2024
Decision issued: Granted with Conditions
-
3 Aug 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
24/00788/FUL Granted
8 Rockside View Matlock Derbyshire DE4 3GP
Installation of air source heat pump
-
T/22/00087/TPO Granted
18 Rockside View Matlock Derbyshire DE4 3GP
Works to TPO/194 - Crown lift to 6m, prune to 4m clearence of house and remove lowest limbs of 1No. T1 Sycamore tree, remove 1No. limb of 1No. T2 Hawthorn
-
T/22/00087/TPO Granted
18 Rockside View Matlock Derbyshire DE4 3GP
Works to TPO/194 - Crown lift to 6m, prune to 4m clearence of house and remove lowest limbs of 1No. T1 Sycamore tree, remove 1No. limb of 1No. T2 Hawthorn
-
T/26/00044/TCA Granted
71 Cavendish Road Matlock Derbyshire DE4 3HD
Fell 1no. silver birch tree
-
T/22/00160/TPO Granted
3 Bidston Close Matlock Derbyshire DE4 3PZ
Crown reduction of 2no. sycamore trees by up to 5 metres to previous reduction points and crown reduction of 4no. sycamore trees by up to 4 metres to previous reduction points.
-
T/22/00160/TPO Granted
3 Bidston Close Matlock Derbyshire DE4 3PZ
Crown reduction of 2no. sycamore trees by up to 5 metres to previous reduction points and crown reduction of 4no. sycamore trees by up to 4 metres to previous reduction points.
Other full applications applications
In Peak District National Park
-
26/00832/FUL Awaiting decision
Anacre Hill Farm Virginsalley Lane Snelston Derbyshire DE6 2DN
Dismantle and replace an existing, modern steel-frame shelter shed with a traditionally constructed detached garage building.
-
26/00835/FUL Awaiting decision
Cherry Hinton Pump Lane Doveridge Derbyshire DE6 5LX
Render to the existing brickwork of the house and garage. Changes to dormer windows and erection of new open canopy porch.
-
26/00828/FUL Awaiting decision
36 Belle Vue Road Ashbourne Derbyshire DE6 1AT
Creation of parking area and associated works
-
26/00829/FUL Awaiting decision
The Pump House Blundestone Lane Longway Bank Whatstandwell Derbyshire DE4 5HU
Proposed extension and alterations
-
26/00019/FUL Refused
Jacks Croft Ashbourne Road Carsington Derbyshire
The siting of 7 touring caravans, 2 shepherds huts, and the erection of a 5m x 5m tractor / plant shed.