Planning application

Carsington And Hopton (Voluntary Aided) Church Of England Primary School School Lane Carsington Derbyshire DE4 4JN

Granted Peak District National Park 24/00653/LBALT Listed Building Consent (Alts/Ext)

Works: Extension

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Installation of air-conditioning units to the rear extension

As published by the council, reference 24/00653/LBALT

Application record

Reference
24/00653/LBALT
Type
Listed Building Consent (Alts/Ext)
Status
Permitted with Conditions
Decision
Granted with Conditions
Received
29 Jul 2024
Validated
29 Jul 2024
Decided
6 Dec 2024
Ward
Wirksworth
Parish
Carsington
Decision by
Delegated
Postcode
DE4 4JN

Site history

Applications at this address on the Peak District National Park register

This site has had 2 applications since 2023: 2 approved, 0 refused.

  • 23/01330/FUL Granted

    Carsington And Hopton (Voluntary Aided) Church Of England Primary School School Lane Carsington Derbyshire DE4 4JN

    Installation of air conditioning system

    Decided 11 Oct 2024 Full applications

Timeline

Dates from the published record

  1. 29 Jul 2024

    Received by Peak District National Park

  2. 6 Dec 2024

    Decision issued: Granted with Conditions

  3. 16 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, registered in Market Harborough

79 applications on PlanIndex · across 18 councils · 95% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

Documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Peak District National Park granted permission on 6 December 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Peak District National Park

  • 26/00399/LBALT Granted

    Masson Mills 41 Derby Road Matlock Bath Derbyshire

    Alterations to door hardware on four doors on Level 1 of Arkwright Mill

    9 Apr 2026 Heritage and listed buildings
  • 26/00754/LBALT Granted

    Garden House Main Street Carsington Derbyshire DE4 4DE

    Replacement windows and front door to existing Grade 2 listed dwelling.

    8 Jul 2026 Heritage and listed buildings
  • 26/00522/LBALT Granted

    Sudbury Hall Main Road Sudbury Derbyshire DE6 5HT

    Proposed internal works including the repair of flooring, removal and replacement of ceilings, providing fire compartmentation through floors and walls, infill wall voids, intumescent grilles and firestopping as required

    8 May 2026 Heritage and listed buildings
  • 26/00939/LBALT Awaiting decision

    6 St John Street Wirksworth Derbyshire DE4 4DR

    Internal works: conversion of store room to wc, installation of vent and flue

    26 Aug 2026 Heritage and listed buildings
  • 26/00619/LBALT Withdrawn

    Hopton Manor Main Street Hopton Derbyshire DE4 4DF

    Removal of existing, modern, single-glazed, painted timber window frames and replacement with new painted timber double-glazed window frames.

    2 Jun 2026 Heritage and listed buildings