Skip to content
PlanIndex Get alerts
Menu

Planning application

Woodhead Farm (Short) Agnes Meadow Lane Kniveton Derbyshire DE6 1JR

Granted Peak District National Park 24/00465/LBALT Listed Building Consent (Alts/Ext)

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Proposed removal of render on front and east elevation and repointing of stone with lime mortar mix

As published by the council, reference 24/00465/LBALT

Application record

Reference
24/00465/LBALT
Type
Listed Building Consent (Alts/Ext)
Status
Permitted with Conditions
Decision
Granted with Conditions
Received
29 May 2024
Validated
27 Jun 2024
Decided
16 Aug 2024
Ward
Dovedale, Parwich And Brassington
Parish
Kniveton
Decision by
Delegated
Postcode
DE6 1JR

Site history

Applications at this address on the Peak District National Park register

This site has had 3 applications since 2024: 3 approved, 0 refused.

  • 24/00775/HEDG Granted

    Woodhead Farm (Short) Agnes Meadow Lane Kniveton Derbyshire DE6 1JR

    Proposed removal of hawthorn hedgerow to create a gateway access to the field to the West of the hedge

    Decided 27 Sep 2024 Trees
  • 24/00776/AGR Granted

    Woodhead Farm (Short) Agnes Meadow Lane Kniveton Derbyshire DE6 1JR

    Agricultural Prior Notification - Formation of a new access gateway from Agnes Meadow Lane to the field to the West to allow agricultural machinery access

    Decided 4 Oct 2024 Other

Timeline

Dates from the published record

  1. 29 May 2024

    Received by Peak District National Park

  2. 27 Jun 2024

    Validated

    Checked as complete and ready for consideration.

  3. 16 Aug 2024

    Decision issued: Granted with Conditions

  4. 10 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

Documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Peak District National Park granted permission on 16 August 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Peak District National Park

  • 26/00522/LBALT Granted

    Sudbury Hall Main Road Sudbury Derbyshire DE6 5HT

    Proposed internal works including the repair of flooring, removal and replacement of ceilings, providing fire compartmentation through floors and walls, infill wall voids, intumescent grilles and firestopping as required

    8 May 2026 Heritage and listed buildings
  • 26/00939/LBALT Awaiting decision

    6 St John Street Wirksworth Derbyshire DE4 4DR

    Internal works: conversion of store room to wc, installation of vent and flue

    26 Aug 2026 Heritage and listed buildings
  • 26/00619/LBALT Withdrawn

    Hopton Manor Main Street Hopton Derbyshire DE4 4DF

    Removal of existing, modern, single-glazed, painted timber window frames and replacement with new painted timber double-glazed window frames.

    2 Jun 2026 Heritage and listed buildings
  • 26/00392/LBALT Granted

    The Cavendish Arms Derby Road Doveridge Derbyshire DE6 5JR

    Proposed replacement of various existing First Floor timber sliding sash windows, existing First Floor timber casement windows and one timber doorset and glazed side screens at Ground Floor Level with new timber windows and doors, all fitted with slimline double glazed units.

    8 Apr 2026 Heritage and listed buildings
  • 26/00902/LBALT Awaiting decision

    The Cottage Park Lane Two Dales Derbyshire DE4 2FB

    Proposed removal of non-original infill to sitting room fireplace to allow for a multi-fuel stove to be fitted

    17 Aug 2026 Heritage and listed buildings