Planning application
22/00241/FUL
9 Collingwood Crescent Matlock Derbyshire DE4 3TB
Proposal
First floor rear extension
As published by the council, reference 22/00241/FUL
Timeline
Dates from the published record
-
3 Mar 2022
Received by Peak District National Park
-
11 Mar 2022
Validated
Checked as complete and ready for consideration.
-
6 May 2022
Decision issued: Granted with Conditions
-
3 Aug 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
22/00241/FUL Granted
9 Collingwood Crescent Matlock Derbyshire DE4 3TB
First floor rear extension
-
22/00798/FUL Granted
7 Collingwood Crescent Matlock Derbyshire DE4 3TB
Erection of two storey rear extension
-
22/00798/FUL Granted
7 Collingwood Crescent Matlock Derbyshire DE4 3TB
Erection of two storey rear extension
-
T/26/00024/TPO Awaiting decision
86 Bakewell Road Matlock Derbyshire DE4 3AZ
Fell 1No. Hawthorn due to being heavily ivy clad, Crown reduce 2No. Hawthorns by 1-1.5metres in height and 1metre in lateral spread to lower risk of failure.
-
21/00009/CLPUD Granted
48 Megdale Matlock Derbyshire DE4 3JW
Certificate of lawful proposed development- single storey rear extension
-
25/01075/FUL Refused
19 Paxton Close Matlock Derbyshire DE4 3TD
Proposed demolition of existing detached garage and erection of two storey side extension with single storey rear extension
Other full applications applications
In Peak District National Park
-
26/00832/FUL Awaiting decision
Anacre Hill Farm Virginsalley Lane Snelston Derbyshire DE6 2DN
Dismantle and replace an existing, modern steel-frame shelter shed with a traditionally constructed detached garage building.
-
26/00835/FUL Awaiting decision
Cherry Hinton Pump Lane Doveridge Derbyshire DE6 5LX
Render to the existing brickwork of the house and garage. Changes to dormer windows and erection of new open canopy porch.
-
26/00828/FUL Awaiting decision
36 Belle Vue Road Ashbourne Derbyshire DE6 1AT
Creation of parking area and associated works
-
26/00829/FUL Awaiting decision
The Pump House Blundestone Lane Longway Bank Whatstandwell Derbyshire DE4 5HU
Proposed extension and alterations
-
26/00019/FUL Refused
Jacks Croft Ashbourne Road Carsington Derbyshire
The siting of 7 touring caravans, 2 shepherds huts, and the erection of a 5m x 5m tractor / plant shed.