Skip to content
PlanIndex Get alerts
Menu

Planning application

The Pines 12 Eversleigh Rise Darley Bridge Derbyshire DE4 2JW

Granted Peak District National Park 21/00139/FUL Full Planning Permission

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of shed

As published by the council, reference 21/00139/FUL

Application record

Reference
21/00139/FUL
Type
Full Planning Permission
Status
Permitted
Decision
Granted
Received
4 Feb 2021
Validated
25 Feb 2021
Decided
19 Apr 2021
Ward
Winster And South Darley
Parish
South Darley
Decision by
Delegated
Postcode
DE4 2JW

Site history

Applications at this address on the Peak District National Park register

This site has had 2 applications since 2021: 2 approved, 0 refused.

  • 21/00139/AMD Granted

    The Pines 12 Eversleigh Rise Darley Bridge Derbyshire DE4 2JW

    Modifications to application 21/00139/FUL comprising change of roof ridge line direction from front-to-back (short dimension) to side-to-side (long dimension)

    Decided 2 Jun 2021 Amendments

Timeline

Dates from the published record

  1. 4 Feb 2021

    Received by Peak District National Park

  2. 25 Feb 2021

    Validated

    Checked as complete and ready for consideration.

  3. 19 Apr 2021

    Decision issued: Granted

  4. 3 Aug 2026

    Added to PlanIndex

Cases linked to this one on the register

1 later application on the register refers to this one:

  • 21/00139/AMD Granted

    The Pines 12 Eversleigh Rise Darley Bridge Derbyshire DE4 2JW

    Modifications to application 21/00139/FUL comprising change of roof ridge line direction from front-to-back (short dimension) to side-to-side (long dimension)

    Decided 2 Jun 2021 Amendments

Documents

Plans, drawings, consultee responses and the officer's report

18 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Peak District National Park granted permission on 19 April 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Peak District National Park

  • 26/00979/FUL Awaiting decision

    Beechview Post Office Lane Brailsford Derbyshire DE6 3BT

    Extension to dwelling and replacement garage

    11 Sep 2026 Full applications
  • 26/00507/FUL Refused

    Round Oak Farm Slade Lane Mercaston Derbyshire DE6 3DZ

    Erection of a rural workers' dwelling to replace temporary caravan

    6 May 2026 Full applications
  • 26/00807/FUL Granted

    2 Hurds Hollow Matlock Derbyshire DE4 3JZ

    Erection of 3m by 3.5m wooden gazebo to front elevation

    23 Jul 2026 Full applications
  • 26/00974/FUL Awaiting decision

    196 Dale Road Matlock Bath Derbyshire DE4 3PT

    Retention of raised decking (retrospective) with the addition of metal balustrading to front lower terrace and erection of garden room to upper front terrace

    10 Sep 2026 Full applications
  • 26/00976/FUL Awaiting decision

    Jasmine Cottage Longford Lane Sutton On The Hill Derbyshire DE6 5JB

    Proposed erection of a conservatory

    10 Sep 2026 Full applications