Skip to content
PlanIndex Get alerts
Menu

Planning application

16 Kirk Close Oxford Oxfordshire OX2 8JN

Awaiting decision Oxford 25/02933/FUL Full Application

Works: Extension Demolition Small domestic

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Demolition of existing rear conservatory and erection of single storey rear extension.

As published by the council, reference 25/02933/FUL

Application record

Reference
25/02933/FUL
Type
Full Application
Status
Registered
Received
5 Nov 2025
Validated
20 Nov 2025
Ward
Wolvercote Ward
Decision by
Delegated decision
Postcode
OX2 8JN

Timeline

Dates from the published record

  1. 5 Nov 2025

    Received by Oxford

  2. 20 Nov 2025

    Validated

    Checked as complete and ready for consideration.

  3. 9 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 15 January 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Oxford took a median of 37 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

18 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Oxford for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 16 Kirk Close Oxford Oxfordshire OX2 8JN

    24/01472/FUL Submitted 18 Jun 2024 1m away

    Alterations to roof ridge., formation of 1no. rear dormer to rear roofslope and insertion of 2no. rooflights to front elevation in association with loft conversion. Installation of PV panels to side elevations.

    Granted Full applications Loft or dormer 16 docs
  • 26 Sunderland Avenue Oxford Oxfordshire OX2 8DX

    25/01203/CND Submitted 4 Mar 2026 73m away

    Details submitted in compliance with conditions 1 (Development begun within time limit), 2 (Develop in accordance with approved plans), 6 (Obscure - first floor study windows), 7 (Bin store- acceptable), 8 (Bicycle store - further information), 10 (Energy Efficiency), 11 (Water Efficiency), 12 (Drainage Strategy), 13 (Time limit - ecological surveys), 18 (AMS) and 19 (TPP) of planning permission 25/01203/FUL.

    Granted Conditions Windows or glazing 14 docs
  • 30 Sunderland Avenue Oxford OX2 8DX

    21/00619/FUL Submitted 5 Mar 2021 90m away

    Erection of a front porch. Demolition of existing rear extensions and first floor balcony and erection of a two storey rear extension. Alterations to windows and doors to rear elevation, insertion of 2no. windows to west elevation and removal of 1no. ground floor window to east elevation and insertion of 1no. first floor window to east elevation.

    Granted Full applications Extension Demolition +1 12 docs
    Small domestic
  • 36 Sunderland Avenue Oxford Oxfordshire OX2 8DX

    21/02178/CND Submitted 18 Nov 2022 99m away

    Details submitted in compliance with condition 9 (Drainage) and 11 (Ecology) of planning permission 21/02178/FUL

    Granted Conditions 6 docs
  • 36 Sunderland Avenue Oxford Oxfordshire OX2 8DX

    21/02179/CND Submitted 17 Nov 2022 99m away

    Details submitted in compliance with condition 9 (Drainage) and 11 (Ecology) of planning permission 21/02179/FUL

    Granted Conditions 6 docs
  • 3 Rothafield Road Oxford Oxfordshire OX2 8JJ

    25/03074/FUL Submitted 19 Nov 2025 133m away

    84% historically approved · decision due ~14 Jan

    Demolition of existing garage and conservatory. Erection of a part two, part single side and rear extension. Formation of a Juliet balcony to rear elevation Formation of a front porch. Insertion of 1no. roof light. Alterations to fenestrations. Associated landscaping works.

    Awaiting decision Full applications Extension Loft or dormer +1 15 docs
    Small domestic

In Oxford

  • 26/02081/FUL Awaiting decision

    36 Kennett Road Oxford Oxfordshire OX3 7BJ

    Demolition of rear conservatory and erection of a single storey rear extension.

    27 Aug 2026 Full applications
  • 26/02069/FUL Awaiting decision

    28 Rymers Lane Oxford Oxfordshire OX4 3LB

    Change of use of dwellinghouse (Use Class C3) to a House in Multiple Occupation (Use Class C4). Provision of bin and bike stores.

    26 Aug 2026 Full applications
  • 26/02065/FUL Awaiting decision

    16 Norham Road Oxford Oxfordshire OX2 6SF

    Installation of front gates (Retrospective).

    26 Aug 2026 Full applications
  • 26/02071/FUL Awaiting decision

    The William R Miller Building Dawson Street Oxford Oxfordshire OX4 1GF

    Installation of 38no. of PV panels to existing roof and associated works.

    26 Aug 2026 Full applications
  • 26/02075/FUL Awaiting decision

    Oxford University Press Great Clarendon Street Oxford Oxfordshire OX2 6DP

    Installation of air conditioning units and associated works.

    26 Aug 2026 Full applications