Skip to content
PlanIndex Get alerts
Menu

Planning application

Department Of Physiology Parks Road Oxford Oxfordshire OX1 3PT

Awaiting decision Oxford 24/01821/CND Discharge Condition - 1st app

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Details submitted in compliance with condition 17 (Thames Water Upgrades) of planning permission 24/01821/FUL.

As published by the council, reference 24/01821/CND

Application record

Reference
24/01821/CND
Type
Discharge Condition - 1st app
Status
Registered
Received
14 Jul 2026
Validated
14 Jul 2026
Ward
Holywell Ward
Decision by
Delegated decision
Postcode
OX1 3PT

Site history

Applications at this address on the Oxford register

This site has had 7 applications since 2024: 5 approved, 0 refused.

  • 26/02628/VAR Awaiting decision

    Department Of Physiology Parks Road Oxford Oxfordshire OX1 3PT

    Variation of condition 2 (Develop in accordance with approved plans) of planning permission 24/01821/FUL (Demolition of part of the third floor and construction of new rooftop extensions. The refurbishment and reconfiguration of the third floor to allow for the creation a new academic hub with flexible seminar and innovation space, flexible open laboratories, support space and research offices. The creation of an external terrace and new plant room enclosures, flues and risers. The insertion of new third floor windows in the north elevation of the building.) to allow the addition of handrails to perimeter of new roof, addition of ventilation louvres to some existing windows on the north elevation, alterations to proportions of proposed new third floor windows to south, east and west elevation and replacement of four proposed new windows on new third floor south elevation with GRC panels.

    Submitted 20 Oct 2026 Amendments
  • 24/01821/CND5 Granted

    Department Of Physiology Parks Road Oxford Oxfordshire OX1 3PT

    Details submitted in compliance with condition 8 (Construction Traffic Management Plan) of planning permission 24/01821/FUL.

    Decided 15 Sep 2026
  • 24/01821/CND4 Granted

    Department Of Physiology Parks Road Oxford Oxfordshire OX1 3PT

    Details submitted in compliance with condition 11 (Air Quality - Flue Emissions) of planning permission 24/01821/FUL.

    Decided 21 Aug 2026 Conditions
  • 24/01821/CND2 Granted

    Department Of Physiology Parks Road Oxford Oxfordshire OX1 3PT

    Details submitted in compliance with condition 10 (Air Quality) of planning permission 24/01821/FUL.

    Decided 15 Sep 2026
  • 24/01821/CND3 Granted

    Department Of Physiology Parks Road Oxford Oxfordshire OX1 3PT

    Details submitted in compliance with condition 13 (CEMP) of planning permission 24/01821/FUL.

    Decided 21 Aug 2026 Conditions
  • 24/01821/FUL Granted

    Department Of Physiology Parks Road Oxford Oxfordshire OX1 3PT

    Demolition of part of the third floor and construction of new rooftop extensions. The refurbishment and reconfiguration of the third floor to allow for the creation a new academic hub with flexible seminar and innovation space, flexible open laboratories, support space and research offices. The creation of an external terrace and new plant room enclosures, flues and risers. The insertion of new third floor windows in the north elevation of the building.

    Decided 19 Dec 2024 Full applications

Timeline

Dates from the published record

  1. 14 Jul 2026

    Received by Oxford

  2. 2 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 8 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Oxford took a median of 47 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

4 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Oxford for determination, against a statutory target of eight weeks. Over the last year Oxford decided condition discharge and variation applications in a median of 46 days. More in our guide to how long planning decisions take.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Department Of Physiology Parks Road Oxford Oxfordshire OX1 3PT

    24/01821/FUL Submitted 25 Jul 2024 50 yards away

    Demolition of part of the third floor and construction of new rooftop extensions. The refurbishment and reconfiguration of the third floor to allow for the creation a new academic hub with flexible seminar and innovation space, flexible open laboratories, support space and research offices. The creation of an external terrace and new plant room enclosures, flues and risers. The insertion of new third floor windows in the north elevation of the building.

    Granted Full applications Extension Demolition +1 58 docs
  • Department Of Physiology Parks Road Oxford Oxfordshire OX1 3PT

    24/01821/CND4 Submitted 16 Jul 2026 50 yards away

    Details submitted in compliance with condition 11 (Air Quality - Flue Emissions) of planning permission 24/01821/FUL.

    Granted Conditions 4 docs
  • The Sherrington Building Parks Road Oxford Oxfordshire OX1 3PT

    21/00165/FUL Submitted 22 Jan 2021 50 yards away

    Replacement of windows to the North elevation with new double glazed (part retrospective). Demolition of rooftop extension to South elevation.

    Granted Full applications Extension Demolition +1 18 docs
  • Department Of Physiology Parks Road Oxford Oxfordshire OX1 3PT

    24/01821/CND3 Submitted 14 Jul 2026 50 yards away

    Details submitted in compliance with condition 13 (CEMP) of planning permission 24/01821/FUL.

    Granted Conditions 4 docs
  • Department Of Physiology Parks Road Oxford Oxfordshire OX1 3PT

    24/01821/CND5 Submitted 21 Jul 2026 50 yards away

    Details submitted in compliance with condition 8 (Construction Traffic Management Plan) of planning permission 24/01821/FUL.

    Granted 3 docs
  • Department Of Physiology Parks Road Oxford Oxfordshire OX1 3PT

    26/02628/VAR Submitted 20 Oct 2026 50 yards away

    92% historically approved · decision due ~15 Dec

    Variation of condition 2 (Develop in accordance with approved plans) of planning permission 24/01821/FUL (Demolition of part of the third floor and construction of new rooftop extensions. The refurbishment and reconfiguration of the third floor to allow for the creation a new academic hub with flexible seminar and innovation space, flexible open laboratories, support space and research offices. The creation of an external terrace and new plant room enclosures, flues and risers. The insertion of new third floor windows in the north elevation of the building.) to allow the addition of handrails to perimeter of new roof, addition of ventilation louvres to some existing windows on the north elevation, alterations to proportions of proposed new third floor windows to south, east and west elevation and replacement of four proposed new windows on new third floor south elevation with GRC panels.

    Awaiting decision Amendments Extension Roofing +2

In Oxford

  • 24/02614/CND Awaiting decision

    27 Norham Road Oxford Oxfordshire OX2 6SQ

    Details submitted in compliance with condition 1 (Development begun within time limit), 2 (Develop in accordance with approved plans), 3 (Materials), 4 (Drainage Strategy), 5 (Parking Permits), 6 (Ecology - Biodiversity Method Statement), 7 (No extension of balcony), 8 (Cycle Storage), 9 (Bin storage), 10 (PD Rights - Means of Access), 11 (Details of railings and balcony balustrade), 12 (Landscape Proposals - Implementation), 13 (Landscape Proposals - Reinstatement), 14 (Tree Protection Methods), 15 (All works completed prior to occupation), 16 (Noise), 17 (Vibration), 18 (Exclusion - Front door), 20 (Fenestration details), 22 (Front step - details), 23 (Repointing work), 24 (Boundary Walls - Sample), 25 (Roofing material), 26 (Stonework repairs and cleaning - sample), 27 (External Materials - Sample) and 28 (Piling Method Statement) of planning permission 24/02614/FUL.

    Received 1 Oct, published by the council 11 Oct 2026 Conditions
  • 25/02894/CND Awaiting decision

    Said Business School Park End Street Oxford Oxfordshire OX1 1HP

    Details submitted in compliance with condition 4 (Noise and Mitigation Monitoring) of planning permission 25/02894/FUL.

    Received 23 Sep, published by the council 11 Oct 2026 Conditions
  • 26/00752/CND Awaiting decision

    1 Holywell Street Oxford Oxfordshire OX1 3SA

    Details submitted in compliance with condition 3 (Archaeological investigation) of listed building consent 26/00752/LBC.

    Received 23 Sep, published by the council 30 Sep 2026 Conditions
  • 22/03051/CND3 Awaiting decision

    St Edward's School Woodstock Road Oxford Oxfordshire OX2 7NN

    Details submitted in compliance with condition 4 (Archaeology) of planning permission 22/03051/FUL.

    Received 17 Sep, published by the council 28 Sep 2026 Conditions
  • 26/00468/CND Awaiting decision

    Grandpont House Abingdon Road Oxford Oxfordshire OX1 4LD

    Details submitted in compliance with conditions 1 (commencement of works - LB Consent), 2 (LBConsent - approved plans), 3 (works as approved only), 4 (Archaeology - building recording), 5 (Details - thermal upgrading), 6 (Materials including samples), 7 (Protection of fabric to be preserved), 8 (Structural details), 9 (Details m and e and drainage works), 10 (Fire Protection), 11 (Details) of planning permission 26/00468/VAR

    Received 17 Sep, published by the council 28 Sep 2026 Conditions