Skip to content
PlanIndex Get alerts
Menu

Planning application

22 High Street, Kirkwall Orkney KW15 1AZ

Awaiting decision Orkney Islands 26/244/LB Listed Building

Works: Windows or glazing

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Remove existing garage door and replace with window and composite boards and replace existing window and door to the rear of garage

As published by the council, reference 26/244/LB

Application record

Reference
26/244/LB
Type
Listed Building
Status
Awaiting decision
Received
19 Aug 2026
Validated
19 Aug 2026
Ward
Kirkwall West & Orphir
Parish
Kirkwall & St Ola Community Council
Postcode
KW15 1AZ

Site history

Applications at this address on the Orkney Islands register

This site has had 2 applications since 2024: 1 approved, 0 refused.

  • 24/362/LB Granted

    22 High Street, Kirkwall, Orkney, KW15 1AZ

    Install two replacement windows

    Decided 11 Dec 2024 Heritage and listed buildings

Timeline

Dates from the published record

  1. 19 Aug 2026

    Received by Orkney Islands

  2. 28 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 14 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Orkney Islands took a median of 103 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

R. Clouston Ltd Agent, registered in Kirkwall

Active · incorporated 2000 · Kirkwall

24 applications on PlanIndex · 100% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

10 documents on file for this application

  • Listed Building Consent Site Notice · 28 Aug 2026
  • Site Plan Drawing · 19 Aug 2026
  • Existing Floor & Elevation Plan Drawing · 19 Aug 2026
  • Proposed Floor & Elevation Plan Drawing · 19 Aug 2026
  • Door Detail Drawing · 19 Aug 2026
  • Listed Building Application Form · 19 Aug 2026
  • Location Plan Drawing · 19 Aug 2026
  • Wall panel details Specification · 19 Aug 2026
  • Window Detail Drawing · 19 Aug 2026

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Orkney Islands for determination, against a statutory target of eight weeks. Over the last year Orkney Islands decided heritage and listed building applications in a median of 97 days. More in our guide to how long planning decisions take.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In Orkney Islands

  • 26/220/LB Decided

    23 St Catherine's Place, Kirkwall, Orkney KW15 1HX

    Remove boundary wall

    Received 23 Jul, published by the council 28 Aug 2026 Heritage and listed buildings
  • 26/113/LB Decided

    2 South End, Stromness, Orkney KW16 3DJ

    Restore hand crane

    Received 17 Apr, published by the council 28 Jul 2026 Heritage and listed buildings
  • 26/159/LB Decided

    Ness House, Ness Road, Stromness Orkney KW16 3DL

    Replace bathroom interior, install electric underfloor heating and install extraction fan

    Received 26 May, published by the council 28 Jul 2026 Heritage and listed buildings
  • 26/272/LB Awaiting decision

    Watergate House, Watergate, Kirkwall, Orkney KW15 1PD

    Replace roof covering, lead work and vent (retrospective)

    Received 14 Sep, published by the council 12 Oct 2026 Heritage and listed buildings
  • 26/185/LB Granted

    Sule Skerry Lighthouse, Orkney

    Internal strip out (including watchroom immediately beneath the lantern), structural repairs to cracks, roof and drainage repairs, re-waterproof, external redecoration (including historic metalwork repairs and replacements), replacement batteries, engine and fuel system, water system, lighting and rewiring, and full internal alterations including replacement bathroom, kitchen and accommodation areas

    Received 11 Jun, published by the council 28 Jul 2026 Heritage and listed buildings