Planning application

Land Near Greentoft/Neven Point, Eday, Orkney

Awaiting decision Orkney Islands 25/203/TPPMAJ Turbine Planning Permission MAJ

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Erect five wind turbines (maximum height of 180 metres), and battery energy storage system (maximum combined capacity 49.9 MW), a substation, external transformers, and associated infrastructure including access tracks, crane hardstandings, temporary laydown areas, underground cabling, and borrow pit

As published by the council, reference 25/203/TPPMAJ

Application record

Reference
25/203/TPPMAJ
Type
Turbine Planning Permission MAJ
Status
Awaiting decision
Received
6 Jun 2025
Validated
23 Jun 2025
Ward
North Isles
Parish
Eday Community Council

Timeline

Dates from the published record

  1. 6 Jun 2025

    Received by Orkney Islands

  2. 23 Jun 2025

    Validated

    Checked as complete and ready for consideration.

  3. 5 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 18 August 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Orkney Islands took a median of 99 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Agent on file, a planning consultancy registered in Edinburgh

52 applications on PlanIndex · across 6 councils · 100% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Applicant on file, registered in Alloa

3 applications on PlanIndex

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

368 documents on file for this application

  • Further Comment - W Cormack Representation · 08 Jul 2026
  • HIAL (Highlands & Islands Airports Ltd) Consultation Response · 18 May 2026
  • Officer to Agent - Further Information Request Correspondence · 05 Mar 2026
  • Further Comment - C Stevens Representation · 24 Nov 2025
  • Late Representation - F Hay Representation · 30 Oct 2025
  • Environmental Health Consultation Response · 13 Oct 2025
  • Islands archaeologist Consultation Response · 29 Sep 2025
  • NatureScot Consultation Response · 15 Sep 2025
  • Policy Officer - Access Consultation Response · 01 Sep 2025
  • Engineering Services Consultation Response · 27 Aug 2025
  • Historic Environment Scotland Consultation Response · 27 Aug 2025
  • Late Representation - M Sykrs Representation · 21 Aug 2025
  • Late Representation - K Simpson Representation · 19 Aug 2025
  • Late Representation - C Davies Representation · 19 Aug 2025
  • Late Representation - C Davies Representation · 19 Aug 2025
  • Late Representation - N Spinks Representation · 19 Aug 2025
  • Further Comment - N Skelton Representation · 18 Aug 2025
  • Late Representation - C Tait Representation · 18 Aug 2025
  • Late Representation - C Bell Representation · 18 Aug 2025
  • Late Representation - S Harris Representation · 18 Aug 2025
  • Late Representation - Lesley Yoneda Representation · 18 Aug 2025
  • Objection - C Webster Representation · 17 Aug 2025
  • Objection -R Joy Representation · 17 Aug 2025
  • Objection -P Brough Representation · 17 Aug 2025
  • Objection - N Bremner Representation · 17 Aug 2025
  • Objection - J Pratt Representation · 17 Aug 2025
  • Objection - M Raw Representation · 17 Aug 2025
  • Objection - E Milligan Representation · 17 Aug 2025
  • Objection - S Graham Representation · 17 Aug 2025
  • Objection - L Morrison Representation · 17 Aug 2025
  • Objection - M Sinclair Representation · 17 Aug 2025
  • Further Comment - D Baker Representation · 17 Aug 2025
  • Objection - S MacLennan Representation · 17 Aug 2025
  • Objection - Mr & Mrs W Jackson Representation · 17 Aug 2025
  • Objection - J Carson Representation · 17 Aug 2025
  • Objection - A Hockenhull Representation · 17 Aug 2025
  • Further Comment - E Brodie Representation · 17 Aug 2025
  • Objection - J Warren Representation · 17 Aug 2025
  • Objection - M Eastty Representation · 17 Aug 2025
  • Objection - B Shepherd Representation · 17 Aug 2025
  • Objection - S Billing Representation · 17 Aug 2025
  • Objection - S Billing Representation · 17 Aug 2025
  • Objection - F L'estrange Representation · 17 Aug 2025
  • Further Comment - R Bremner Representation · 17 Aug 2025
  • Objection - -S Shercliff Representation · 16 Aug 2025
  • Objection - J Campbell Representation · 16 Aug 2025
  • Objection - J Harcus Representation · 16 Aug 2025
  • Objection - A & P Jones Representation · 15 Aug 2025
  • Objection - E Wallitt Representation · 15 Aug 2025
  • Objection - J & M Leitch Representation · 15 Aug 2025
  • Objection - L Sinclair Representation · 14 Aug 2025
  • Objection - P Biltcliffe Representation · 14 Aug 2025
  • Objection - D Macdonald, S Murray & A Young Representation · 14 Aug 2025
  • Objection - L Kinsey Representation · 13 Aug 2025
  • Further Comment - W Cormack Representation · 13 Aug 2025
  • Objection - J Watson Representation · 13 Aug 2025
  • Objection - C Shearer Representation · 13 Aug 2025
  • Objection - N Woolfenden Representation · 12 Aug 2025
  • Objection - G Bremner Representation · 12 Aug 2025
  • Objection - C Sylvester Representation · 12 Aug 2025
  • Further Comment - D Lord Representation · 12 Aug 2025
  • Objection - G Richards Representation · 12 Aug 2025
  • Objection - Mr Neil Representation · 12 Aug 2025
  • Objection - L Davies Representation · 12 Aug 2025
  • Further Comment - M Dixon Representation · 12 Aug 2025
  • Invalid Representation - N Woolfenden Representation · 12 Aug 2025
  • Further Comment - P Booth Representation · 11 Aug 2025
  • Objection - R Reynolds Representation · 11 Aug 2025
  • Further Comment - B Reynolds Representation · 11 Aug 2025
  • Objection - Helen Representation · 11 Aug 2025
  • Objection - L Webster Representation · 11 Aug 2025
  • Objection - S Appleby Representation · 11 Aug 2025
  • Objection - E Webster Representation · 11 Aug 2025
  • Objection - C Bromley Representation · 11 Aug 2025
  • Objection - A Murphy Representation · 09 Aug 2025
  • Objection - C Bell Representation · 09 Aug 2025
  • Objection - J Bently Representation · 09 Aug 2025
  • Objection - C-A Rose Representation · 09 Aug 2025
  • Objection - A Cant Representation · 08 Aug 2025
  • Further Comment - D Townsend Representation · 08 Aug 2025
  • Objection - B Bell Representation · 08 Aug 2025
  • Objection - L Booth Representation · 08 Aug 2025
  • Objection - Mr and Mrs Louis de Jel & Roos Fokkema Representation · 07 Aug 2025
  • Neutral- C Townsend Representation · 06 Aug 2025
  • Eday Community Council Consultation Response · 05 Aug 2025
  • Objection - C Shearer Representation · 04 Aug 2025
  • Further Comment- F Haldane Representation · 04 Aug 2025
  • Objection - R Welshman Representation · 04 Aug 2025
  • Objection - L Garson Representation · 04 Aug 2025
  • Objection - N Lyde Representation · 03 Aug 2025
  • Supports D Gowland Representation · 03 Aug 2025
  • Further Comment - S-M Harris Representation · 03 Aug 2025
  • Objection - N Smith Representation · 02 Aug 2025
  • Objection - F Woods Representation · 02 Aug 2025
  • Objection - D Haldane Site Notice · 02 Aug 2025
  • Objection - A Hewison Representation · 01 Aug 2025
  • Objection - A Hewison Representation · 01 Aug 2025
  • Supports - J McCabe Representation · 01 Aug 2025
  • Objection - R M Archer Representation · 01 Aug 2025
  • Supports - M Lee Representation · 01 Aug 2025
  • Objection - F Shepherd Representation · 01 Aug 2025
  • Objection - A Leckenby Representation · 01 Aug 2025
  • Supports-M Graham Representation · 31 Jul 2025
  • RSPB (Royal Society for the Protection of Birds) Consultation Response · 31 Jul 2025
  • Further Comment - L Dyson Representation · 31 Jul 2025
  • Objection - N Harcus Representation · 31 Jul 2025
  • Objection - C Despard Representation · 31 Jul 2025
  • Objection - A Wiseman Representation · 31 Jul 2025
  • Further Comment - C Graham Representation · 31 Jul 2025
  • Objection - P Garrod Representation · 31 Jul 2025
  • Objection - S Friend Representation · 31 Jul 2025
  • Objection - A Ball Representation · 31 Jul 2025
  • Objection - G MacLeod Representation · 31 Jul 2025
  • Supports - T McCabe Representation · 31 Jul 2025
  • Further Comment - Neutral- I Ford Representation · 31 Jul 2025
  • Supports-G Sparks Representation · 31 Jul 2025
  • Objection - G Low Representation · 31 Jul 2025
  • Objection - R Allen Representation · 31 Jul 2025
  • Further Comment - S-M Harris Representation · 31 Jul 2025
  • Objection - C Bristow Representation · 31 Jul 2025
  • Objection - E Putnam Representation · 31 Jul 2025
  • Supports- J Gowland Representation · 30 Jul 2025
  • Objection - M Young Representation · 30 Jul 2025
  • Objection - D Baker Representation · 30 Jul 2025
  • Objection - A Hayton Representation · 30 Jul 2025
  • Objection - M Mouse Representation · 30 Jul 2025
  • Supports-Mr & Mrs Macfarlane Representation · 30 Jul 2025
  • Objection -W Alford Representation · 30 Jul 2025
  • Objection - A Armstrong Representation · 30 Jul 2025
  • Objection - F J Newton Representation · 30 Jul 2025
  • Objection - B MacDonald Representation · 30 Jul 2025
  • Objection - D E Carter Representation · 30 Jul 2025
  • Objection - Mr & Mrs Chisholm Representation · 30 Jul 2025
  • Objection - J Ritchie Representation · 30 Jul 2025
  • Objection - R Pullen Representation · 30 Jul 2025
  • Objection - C Whittles Representation · 30 Jul 2025
  • Objection - J Wallis Representation · 30 Jul 2025
  • Objection - J Hedley Representation · 30 Jul 2025
  • Objection - L Ward Representation · 30 Jul 2025
  • Objection - J Randalls Representation · 30 Jul 2025
  • Further Comment - N Ward Representation · 30 Jul 2025
  • Objection - P Baxter Representation · 30 Jul 2025
  • Objection - K Thomas Representation · 30 Jul 2025
  • Further Comment -A Barratt Representation · 30 Jul 2025
  • Further Comment - A Barratt Representation · 30 Jul 2025
  • Neutral- D Ford Representation · 30 Jul 2025
  • Objection - A Hasset Representation · 30 Jul 2025
  • Objection - Mr & Mrs Sylvester Representation · 29 Jul 2025
  • Objection - S Cox Representation · 29 Jul 2025
  • Further Comment - P Joy Representation · 29 Jul 2025
  • Objection - N Skelton Representation · 29 Jul 2025
  • Objection - A Alexander Representation · 29 Jul 2025
  • Objection - L Brewer Representation · 29 Jul 2025
  • Objection - S Wright Representation · 29 Jul 2025
  • Objection - M Auchterlonie Representation · 29 Jul 2025
  • Objection - T Brooks Representation · 29 Jul 2025
  • Objection - P Benson Representation · 29 Jul 2025
  • Further Comment - P Benson Representation · 29 Jul 2025
  • Objection - D Graham Representation · 29 Jul 2025
  • Objection - I Suri Representation · 29 Jul 2025
  • Objection - S Kelly Representation · 29 Jul 2025
  • Objection - T Procter Representation · 29 Jul 2025
  • Objection - D Brooks Representation · 29 Jul 2025
  • Objection - S Miller Representation · 29 Jul 2025
  • Objection - I King Representation · 29 Jul 2025
  • Objection - J Baldock Representation · 29 Jul 2025
  • Objection - D Stewart Representation · 29 Jul 2025
  • Objection - A Johnston Representation · 29 Jul 2025
  • Objection - L Dyson Representation · 29 Jul 2025
  • Objection - W Cormack Representation · 29 Jul 2025
  • Objection -A Bignall Representation · 28 Jul 2025
  • Objection - E Wallington and M Cant Representation · 28 Jul 2025
  • Objection - D Bowden Representation · 28 Jul 2025
  • Objection - S Boardman Representation · 28 Jul 2025
  • Objection - M Rennie Representation · 28 Jul 2025
  • Further Comment - J Rennie Representation · 28 Jul 2025
  • Objection - R Cormack Representation · 27 Jul 2025
  • Objection - H Wallington Representation · 25 Jul 2025
  • Objection - J Brough Representation · 25 Jul 2025
  • Objection - J Morgan Representation · 25 Jul 2025
  • MoD (Ministry of Defence) Consultation Response · 25 Jul 2025
  • Supports - S Lind Representation · 24 Jul 2025
  • Further Comment - S Lind Representation · 24 Jul 2025
  • Objection - C L Boardman Representation · 24 Jul 2025
  • Supports- C Brookes Representation · 23 Jul 2025
  • Objection - M Bremner Representation · 23 Jul 2025
  • Objection - C Stevens Representation · 21 Jul 2025
  • Objection -V Irving Representation · 20 Jul 2025
  • Objection - V Irving Representation · 20 Jul 2025
  • Objection - R Archer Representation · 20 Jul 2025
  • Supports- N Joy Representation · 18 Jul 2025
  • Supports- N Rymer Representation · 17 Jul 2025
  • Supports-W Inglis Representation · 16 Jul 2025
  • Objection - A Kelly Representation · 16 Jul 2025
  • EIAR Volume 1 Chapter 14 Socio-Economics, Tourism and Recreation Supporting Document · 16 Jul 2025
  • MoD (Ministry of Defence) Consultation Response · 15 Jul 2025
  • Objection - P Trevelyan Representation · 11 Jul 2025
  • Neutral - E Wallington Representation · 10 Jul 2025
  • HIAL (Highlands & Islands Airports Ltd) Consultation Response · 09 Jul 2025
  • Scottish Water Consultation Response · 07 Jul 2025
  • NATS (National Air Traffic Services) Consultation Response · 02 Jul 2025
  • SEPA (Scottish Environment Protection Agency) Consultation Response · 02 Jul 2025
  • Airfield Superintendant Consultation Response · 01 Jul 2025
  • NATS (National Air Traffic Services) Consultation Response · 01 Jul 2025
  • JRC (Joint Radio Company) Consultation Response · 30 Jun 2025
  • EIAR Volume 4 Appendix 12_2 Private Water Risk Assessment... Supporting Document · 30 Jun 2025
  • Proposal Description Clarification Supporting Document · 30 Jun 2025
  • Arqiva Services Ltd Consultation Response · 30 Jun 2025
  • Turbine Co-ordinates Supporting Document · 23 Jun 2025
  • Invalid Email Correspondence · 18 Jun 2025
  • Design and Access Statement Supporting Document · 06 Jun 2025
  • EIAR Abbreviations List Supporting Document · 06 Jun 2025
  • EIAR Non-Technical Summary Supporting Document · 06 Jun 2025
  • EIAR Volume 1 Chapter 1 Introduction Supporting Document · 06 Jun 2025
  • EIAR Volume 1 Chapter 10 Noise Supporting Document · 06 Jun 2025
  • EIAR Volume 1 Chapter 11 Access Traffic and Transport Supporting Document · 06 Jun 2025
  • EIAR Volume 1 Chapter 12 Geology Hydrology Hydrogeology and Peat Supporting Document · 06 Jun 2025
  • EIAR Volume 1 Chapter 13 Aviation Supporting Document · 06 Jun 2025
  • EIAR Volume 1 Chapter 15 Air Quality Supporting Document · 06 Jun 2025
  • EIAR Volume 1 Chapter 16 Other Issues Supporting Document · 06 Jun 2025
  • EIAR Volume 1 Chapter 18 Summary of Residual Effects Supporting Document · 06 Jun 2025
  • EIAR Volume 1 Chapter 2 Site Selection and Design Supporting Document · 06 Jun 2025
  • EIAR Volume 1 Chapter 3 Proposed Development Supporting Document · 06 Jun 2025
  • EIAR Volume 1 Chapter 4 Approach to EIA Supporting Document · 06 Jun 2025
  • EIAR Volume 1 Chapter 5 Planning and Energy Policy Framework Supporting Document · 06 Jun 2025
  • EIAR Volume 1 Chapter 6 Landscape and Visual Supporting Document · 06 Jun 2025
  • EIAR Volume 1 Chapter 7 Ecology Supporting Document · 06 Jun 2025
  • EIAR Volume 1 Chapter 8 Ornithology Supporting Document · 06 Jun 2025
  • EIAR Volume 1 Chapter 9 Cultural Heritage Supporting Document · 06 Jun 2025
  • EIAR Volume 2 Figure 1_1 Site Location Supporting Document · 06 Jun 2025
  • EIAR Volume 2 Figure 1_2 Proposed Development Layout Supporting Document · 06 Jun 2025
  • EIAR Volume 2 Figure 10_1 Predicted Operational Noise Levels Supporting Document · 06 Jun 2025
  • EIAR Volume 2 Figure 12_1 Study Area Supporting Document · 06 Jun 2025
  • EIAR Volume 2 Figure 12_2 Hydrological Features Supporting Document · 06 Jun 2025
  • EIAR Volume 2 Figure 12_3 Superficial Geology Supporting Document · 06 Jun 2025
  • EIAR Volume 2 Figure 12_4 Peat Classification Supporting Document · 06 Jun 2025
  • EIAR Volume 2 Figure 12_5 Peat Depth Supporting Document · 06 Jun 2025
  • EIAR Volume 2 Figure 12_6 Bedrock Geology Supporting Document · 06 Jun 2025
  • EIAR Volume 2 Figure 12_7 Watercourse Crossings Supporting Document · 06 Jun 2025
  • EIAR Volume 2 Figure 12_8 Private Water Supplies Supporting Document · 06 Jun 2025
  • EIAR Volume 2 Figure 12_9 Groundwater Dependent Terrestrial Ecosystems Supporting Document · 06 Jun 2025
  • EIAR Volume 2 Figure 15_1 Location of Site Boundary and Proposed Works Supporting Document · 06 Jun 2025
  • EIAR Volume 2 Figure 15_2 Receptors and Study Area Supporting Document · 06 Jun 2025
  • EIAR Volume 2 Figure 16_1 Shadow Flicker Study Area Supporting Document · 06 Jun 2025
  • EIAR Volume 2 Figure 16_2 Shadow Flicker Results Realistic Scenario Supporting Document · 06 Jun 2025
  • EIAR Volume 2 Figure 2_1 Onsite Constraints Supporting Document · 06 Jun 2025
  • EIAR Volume 2 Figure 2_2 Turbine Layout A and B Supporting Document · 06 Jun 2025
  • EIAR Volume 2 Figure 2_3 Turbine Layout C and D Supporting Document · 06 Jun 2025
  • EIAR Volume 2 Figure 2_4 Infrastructure Layout 1 Supporting Document · 06 Jun 2025
  • EIAR Volume 2 Figure 2_5 Infrastructure Layout 2 Supporting Document · 06 Jun 2025
  • EIAR Volume 2 Figure 2_6 Infrastructure Layout 3 Supporting Document · 06 Jun 2025
  • EIAR Volume 2 Figure 3_1 Designations within 10km Supporting Document · 06 Jun 2025
  • EIAR Volume 2 Figure 3_12 Indicative Watercourse Crossing Supporting Document · 06 Jun 2025
  • EIAR Volume 2 Figure 6_1 Topography and Landcover Supporting Document · 06 Jun 2025
  • EIAR Volume 2 Figure 6_10 Landscape Designations and Existing Light Environment Supporting Document · 06 Jun 2025
  • EIAR Volume 2 Figure 6_11 Aviation ZTV with Screening A1 Supporting Document · 06 Jun 2025
  • EIAR Volume 2 Figure 6_12 Cumulative ZTV Supporting Document · 06 Jun 2025
  • EIAR Volume 2 Figure 6_2 Cumulative Location Plan Supporting Document · 06 Jun 2025
  • EIAR Volume 2 Figure 6_3 Landscape Character with Cumulative Sites Supporting Document · 06 Jun 2025
  • EIAR Volume 2 Figure 6_4 Coastal Character with Cumulative Sites Supporting Document · 06 Jun 2025
  • EIAR Volume 2 Figure 6_5 ZTV to Blade Tip A1 Supporting Document · 06 Jun 2025
  • EIAR Volume 2 Figure 6_6 ZTV to Hub Height A1 Supporting Document · 06 Jun 2025
  • EIAR Volume 2 Figure 6_7 ZTV to Hub and Tip Height with Screening A1 Supporting Document · 06 Jun 2025
  • EIAR Volume 2 Figure 6_8 Landscape Designations and ZTV Supporting Document · 06 Jun 2025
  • EIAR Volume 2 Figure 6_9 Visual Receptors and ZTV Supporting Document · 06 Jun 2025
  • EIAR Volume 2 Figure 7_1 Statutory Designations Supporting Document · 06 Jun 2025
  • EIAR Volume 2 Figure 7_2 Ecological Desk Study Area Supporting Document · 06 Jun 2025
  • EIAR Volume 2 Figure 7_3 NVC Communities Supporting Document · 06 Jun 2025
  • EIAR Volume 2 Figure 7_4 Otter Signs 2020 2024 Survey Results Supporting Document · 06 Jun 2025
  • EIAR Volume 2 Figure 7_6 Bat Preliminary Roost Assessment Buffer Supporting Document · 06 Jun 2025
  • EIAR Volume 2 Figure 8_1 Project Location Supporting Document · 06 Jun 2025
  • EIAR Volume 2 Figure 8_2 Ornithology Designated Sites Supporting Document · 06 Jun 2025
  • EIAR Volume 2 Figure 8_3 Biodiversity Enhancement Measures Supporting Document · 06 Jun 2025
  • EIAR Volume 2 Figure 9_1 Site Boundary 1km Study Area and Heritage Assets Supporting Document · 06 Jun 2025
  • EIAR Volume 2 Figure 9_10 20 km Study Area ZTV Nationally Important Heritage Ass Supporting Document · 06 Jun 2025
  • EIAR Volume 2 Figure 9_2 Site Boundary 5 km Study Area and Heritage Assets Supporting Document · 06 Jun 2025
  • EIAR Volume 2 Figure 9_3 Site Boundary 20 km Study Area Nationally Important Her Supporting Document · 06 Jun 2025
  • EIAR Volume 2 Figure 9_4 Extract from a map by Hondius 1638 Supporting Document · 06 Jun 2025
  • EIAR Volume 2 Figure 9_5 Extract from a map by Mackenzie Senior1750 Supporting Document · 06 Jun 2025
  • EIAR Volume 2 Figure 9_6 Extracts from Ordnance Survey maps 1872 Supporting Document · 06 Jun 2025
  • EIAR Volume 2 Figure 9_7 Extracts from Ordnance Survey maps 1903 Supporting Document · 06 Jun 2025
  • EIAR Volume 2 Figure 9_8 Site Boundary Infrastructure 1 km Study Area and Herita Supporting Document · 06 Jun 2025
  • EIAR Volume 2 Figure 9_9 Site Boundary 5 km Study Area ZTV and Heritage Assets Supporting Document · 06 Jun 2025
  • EIAR Volume 3 Figure 9_11 Vinquoy Hill chambered cairn Eday from passage Photomo Supporting Document · 06 Jun 2025
  • EIAR Volume 3 Figure 9_12 Burn of Mussetter standing stone on E side of Photomon Supporting Document · 06 Jun 2025
  • EIAR Volume 3 Figure 9_13 Mill Hill chambered cairn Millbounds Photomontage Supporting Document · 06 Jun 2025
  • EIAR Volume 3 Figure 9_14 Stackel Brae castle Maltbarn Eday Wireline Supporting Document · 06 Jun 2025
  • EIAR Volume 3 Figure 9_15 Sandhill chambered cairn 300m W of Eday Photomontage Supporting Document · 06 Jun 2025
  • EIAR Volume 3 Figure 9_16 Greentoft burnt mound 350m SSW of Eday Photomontage Supporting Document · 06 Jun 2025
  • EIAR Volume 3 Figure 9_17 Heart of Neolithic Orkney World Heritage Site Photomon Supporting Document · 06 Jun 2025
  • EIAR Volume 3 Figure 9_18 Kirkwall Westray ferry Wireline Supporting Document · 06 Jun 2025
  • EIAR Volume 3 Figure 9_19 Southside standing stone 130m SW of Wireline Supporting Document · 06 Jun 2025
  • EIAR Volume 3 Figure 9_20 Holm of Huip cairn Wireline Supporting Document · 06 Jun 2025
  • EIAR Volume 3 Figure 9_21 Lochend chambered cairn 450m NW ofStronsay Wireline Supporting Document · 06 Jun 2025
  • EIAR Volume 3 Figure 9_22 Onziebust chambered cairn 440m SSE of Egilsay Wireline Supporting Document · 06 Jun 2025
  • EIAR Volume 3 Figure 9_23 Hillock of Burroughstone broch Wireline Supporting Document · 06 Jun 2025
  • EIAR Volume 3 Viewpoint 1 B9063 Veness Eday Supporting Document · 06 Jun 2025
  • Location Plan Drawing · 06 Jun 2025
  • Cover Letter Correspondence · 06 Jun 2025
  • Turbine Planning Permission MAJ Application Form · 06 Jun 2025
  • Pre-Application Consultation Report Supporting Document · 06 Jun 2025
  • Proposed Battery Container Drawing · 06 Jun 2025
  • Proposed Construction Compound Drawing · 06 Jun 2025
  • Proposed Crane Hardstanding Drawing · 06 Jun 2025
  • Site Plan Drawing · 06 Jun 2025
  • Proposed Substation Compound Layout Drawing · 06 Jun 2025
  • EIAR Volume 3 Viewpoint 2 Stronsay Ferry Supporting Document · 06 Jun 2025
  • EIAR Volume 3 Viewpoint 3 Ness of Ork Shapinsay Supporting Document · 06 Jun 2025
  • EIAR Volume 3 Viewpoint 4 Johns Hill Stronsay Supporting Document · 06 Jun 2025
  • EIAR Volume 3 Viewpoint 5 Vinquoy Hill Eday Supporting Document · 06 Jun 2025
  • EIAR Volume 3 Viewpoint 6 St Magnus Church Egilsay Supporting Document · 06 Jun 2025
  • EIAR Volume 3 Viewpoint 7 Faraclett East Rousay Supporting Document · 06 Jun 2025
  • EIAR Volume 3 Viewpoint 8 Wyre Supporting Document · 06 Jun 2025
  • EIAR Volume 3 Viewpoint 9 Westray Ferry Terminal Supporting Document · 06 Jun 2025
  • EIAR Volume 3 Viewpoint 10 B9070 at Broughtown Sanday Supporting Document · 06 Jun 2025
  • EIAR Volume 3 Viewpoint 11 Pier at Hatston Orkney Mainland Supporting Document · 06 Jun 2025
  • EIAR Volume 3 Viewpoint 12 Mull Head Orkney Mainland Supporting Document · 06 Jun 2025
  • EIAR Volume 3 Viewpoint 13 B9057 above Evie Orkney Mainland Supporting Document · 06 Jun 2025
  • EIAR Volume 3 Viewpoint 14 Wideford Hill Orkney Mainland Supporting Document · 06 Jun 2025
  • EIAR Volume 3 Viewpoint 15 Point of Burrian North Ronaldsay Supporting Document · 06 Jun 2025
  • EIAR Volume 4 Appendix 10_3 Calibration certificates Supporting Document · 06 Jun 2025
  • EIAR Volume 4 Appendix 3_1 Outline Construction Environmental Management Plan Supporting Document · 06 Jun 2025
  • EIAR Volume 4 Appendix 4_1 EIA Scoping Report Supporting Document · 06 Jun 2025
  • EIAR Volume 4 Appendix 4_2 OIC EIA Scoping Opinion Supporting Document · 06 Jun 2025
  • EIAR Volume 4 Appendix 4_3 Proposal of Application Notice Supporting Document · 06 Jun 2025
  • EIAR Volume 4 Appendix 6_1 LVIA Methodology and Criteria Supporting Document · 06 Jun 2025
  • EIAR Volume 4 Appendix 6_2 Visuals Methodology Supporting Document · 06 Jun 2025
  • EIAR Volume 4 Appendix 6_3 Landscape Sensitivity Assessment Supporting Document · 06 Jun 2025
  • EIAR Volume 4 Appendix 6_4 Viewpoint Analysis Supporting Document · 06 Jun 2025
  • EIAR Volume 4 Appendix 6_5 Residential Visual Amenity Assessment Supporting Document · 06 Jun 2025
  • EIAR Volume 4 Appendix 7_2 NVC Survey Report Supporting Document · 06 Jun 2025
  • EIAR Volume 4 Appendix 8_1 Ornithology Technical Report Supporting Document · 06 Jun 2025
  • EIAR Volume 4 Appendix 8_3 Collision Risk Report Supporting Document · 06 Jun 2025
  • EIAR Volume 4 Appendix 8_3 Collision Risk Report Annex 2 Collision Risk Calculat Supporting Document · 06 Jun 2025
  • EIAR Volume 4 Appendix 8_3 Collision Risk Report Annex 2 Flight Line Data Supporting Document · 06 Jun 2025
  • EIAR Volume 4 Appendix 8_3 Collision Risk Report Annex 3 Population Modes Supporting Document · 06 Jun 2025
  • EIAR Volume 4 Appendix 8_4 Information to Inform HRA Supporting Document · 06 Jun 2025
  • EIAR Volume 4 Appendix 9_1 Heritage Asset and Event Gazetteer Supporting Document · 06 Jun 2025
  • EIAR Volume 4 Appendix 9_2 Plate Supporting Document · 06 Jun 2025
  • EIAR Volume 4 Appendix 9_3 Detailed Setting Assessment Supporting Document · 06 Jun 2025
  • EIAR Volume 4 Appendix 9_4 Cumulative Asessment Supporting Document · 06 Jun 2025
  • EIAR Volume 4 Appendix 10_ 5 Noise Prediction Methodology Supporting Document · 06 Jun 2025
  • EIAR Volume 4 Appendix 10_ 6 Operational Mitigation Supporting Document · 06 Jun 2025
  • EIAR Volume 4 Appendix 10_1 Proposed Baseline Noise Measurement Details and Asse Supporting Document · 06 Jun 2025
  • EIAR Volume 4 Appendix 10_4 Derivation of Noise Limits Supporting Document · 06 Jun 2025
  • EIAR Volume 4 Appendix 11_1 Transport Assessment Supporting Document · 06 Jun 2025
  • EIAR Volume 4 Appendix 12_1 Watercourse Crossing Schedule Supporting Document · 06 Jun 2025
  • EIAR Volume 4 Appendix 12_3 Borrow Pit Appraisal Supporting Document · 06 Jun 2025
  • EIAR Volume 4 Appendix 15_1 Air Quality Impact Assessment Supporting Document · 06 Jun 2025
  • EIAR Volume 4 Appendix 16_1 Shadow Flicker Meteorological Data Supporting Document · 06 Jun 2025
  • EIAR Volume 4 Appendix 16_2 Potential Shadow Periods Supporting Document · 06 Jun 2025
  • EIAR Volume 4 Appendix 16_3 Carbon Calculator Supporting Document · 06 Jun 2025
  • EIAR Volumn 4 Appendix 10_2 Baseline Noise Measurement Details and Assessment Me Supporting Document · 06 Jun 2025
  • Planning Statement Supporting Document · 06 Jun 2025
  • EIAR Volume 1 Chapter 17 Schedule of Environmental Commitments Supporting Document · 06 Jun 2025
  • Turbine Kiosk Drawing · 06 Jun 2025
  • Turbine Elevation Drawing · 06 Jun 2025
  • Turbine Foundation Drawing · 06 Jun 2025
  • EIAR Volume 2 Figure 3_2 Typical Turbine Elevation Supporting Document · 06 Jun 2025
  • EIAR Volume 2 Figure 3_3 Typical Turbine Kiosk Supporting Document · 06 Jun 2025
  • EIAR Volume 2 Figure 3_4 Typical Turbine Foundation Supporting Document · 06 Jun 2025
  • EIAR Volume 2 Figure 3_5 Candidate Crane Hardstanding Supporting Document · 06 Jun 2025
  • EIAR Volume 2 Figure 3_6 Typical Track Section Supporting Document · 06 Jun 2025
  • EIAR Volume 2 Figure 3_7 Typical Existing Road Widening Supporting Document · 06 Jun 2025
  • EIAR Volume 2 Figure 3_8 Typical Cable Trench Supporting Document · 06 Jun 2025
  • EIAR Volume 2 Figure 3_9 Proposed Substation Compound Layout Supporting Document · 06 Jun 2025
  • EIAR Volume 2 Figure 3_10 Proposed Battery Container Supporting Document · 06 Jun 2025
  • EIAR Volume 2 Figure 3_11 Proposed Construction Compound Supporting Document · 06 Jun 2025

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Orkney Islands for determination, against a statutory target of eight weeks. Over the last year Orkney Islands decided full applications in a median of 133 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

In Orkney Islands

  • 26/055/PP Granted

    Loth Quarry, Sanday, Orkney

    Temporary change of use from quarry to industrial (Class 5) to construct fish farm pens (two years)

    19 Feb 2026 Full applications
  • 26/062/PP Granted

    Old Papdale Halls Of Residence, Berstane Road, Kirkwall Orkney KW15 1NA

    Demolish former halls of residence and landscape site

    5 Mar 2026 Full applications
  • 26/059/PP Granted

    South Breck, Burness Road, Firth, Orkney KW17 2ET

    Erect a slatted byre

    3 Mar 2026 Full applications
  • 26/112/PP Granted

    John G Corse Funeral Home, Old Scapa Road, Kirkwall Orkney KW15 1BB

    Extend a funeral home

    15 Apr 2026 Full applications
  • 25/380/PP Refused

    Lower Fea (Land Near), Birsay, Orkney, KW17 2NS

    Erect three self-catering pods with communal foul drainage system and associated landscaping

    12 Nov 2025 Full applications