Planning application
Land At Southlink Oldham
Works: New dwelling
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Erection of residential development units with associated access, parking, amenity spaces and landscaping.
As published by the council, reference FUL/355201/25
Application record
- Reference
- FUL/355201/25
- Type
- Full Application
- Status
- Awaiting decision
- Received
- 8 Oct 2025
- Validated
- 10 Oct 2025
- Ward
- Saint Mary's
Site history
Applications at this address on the Oldham register
This site has had 2 applications since 2021: 1 approved, 0 refused.
-
FUL/346374/21 Granted
Land At Southlink Oldham
Construction of new 4th highway arm to the existing signal controlled junction of Oldham Way and Prince Street on the site of the former Mumps tram stop.
Timeline
Dates from the published record
-
8 Oct 2025
Received by Oldham
-
10 Oct 2025
Validated
Checked as complete and ready for consideration.
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 5 December 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Oldham took a median of 65 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
AshtonHale Ltd Agent, registered in Ashton-Under-Lyne
Active · incorporated 2023 · Ashton-Under-Lyne
70 applications on PlanIndex · across 12 councils · 100% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
182 documents on file for this application
- HIGHWAY OFFICER - FINAL COMMENTS
- ARB_AIA_
- ARB_AMS_
- DRAINAGE STRATEGY-SHEET 1
- DRAINAGE STRATEGY-SHEET 2
- SITE LOCATION PLAN
- DRAINAGE CATCHMENT PLAN
- FLOOD EXCEEDANCE PLAN
- NOISE IMPACT ASSESSMENT
- HISTORIC ENVIRONMENT DESK-BASED ASSESSMENT
- AIR QUALITY ASSESSMENT
- ENERGY STATEMENT- SOUTHLINK, OLDHAM - V4
- REVISED ACCESS ARRANGEMENTS
- CRIME IMPACT ASSESSMENT
- SKPMCE15 - SOUTHLINK - MATERIALS LAYOUT F
- SKPMCE15 - SOUTHLINK -PLANNING LAYOUT REV S
- BOUNDARY PLAN - REV H
- SKPMCE15-SOUTHLINK - POS PLAN 2 REV B
- X0374_L_XX_PL_001 [PL11] - LANDSCAPE STRATEGY LAYOUT
- HIGHWAY OFFICER (UPDATED)
- AFFORDABLE HOUSING STATEMENT - REVISED JUNE 2026
- LANDSCAPE STRATEGY LAYOUT
- SKPMCE15 - SOUTHLINK -PLANNING LAYOUT REV Q
- SKPMCE15 - SOUTHLINK -BOUNDARY PLAN REV G
- SKPMCE15 - SOUTHLINK - MATERIALS LAYOUT E
- SKPMCE15 - SOUTHLINK -POS PLAN 2 REV.A
- 20-3271 SOUTHLINK OLDHAM BNG APRIL 26BNGA
- NOISE IMPACT ASSESSMENT
- FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY REPORT
- DRAINAGE STRATEGY-MASTERPLAN
- DRAINAGE STRATEGY-SHEET
- DRAINAGE STRATEGY-SHEET 2
- SITE LOCATION PLAN
- DRAINAGE CATCHMENT PLAN
- FLOOD EXCEEDANCE PLAN
- SITE SECTIONS
- OUTLINE FINISHED LEVELS PLAN-MASTERPLAN
- HERITAGE STATEMENT
- AIR QUALITY ASSESSMENT
- BLOCK 1 - PLANS & ELEVATIONS REV C
- BLOCK 2 - PLANS & ELEVATIONS REV C
- ENERGY STATEMENT- SOUTHLINK
- ITM210336-001B-R TRANSPORT ASSESSMENT
- FRAMEWORK TRAVEL PLAN
- CRIME IMPACT STATEMENT
- SKPMCE15 - SOUTHLINK -PLANNING LAYOUT REV P
- SOUTHLINK - REVISED SUBMISSION SCHEDULE - APRIL 2026
- SOUTHLINK - STREET SCENES REV B
- SOUTHLINK-OLDHAM-CONDITION-ASSESSMENTS-0
- SOUTHLINK-OLDHAM-CONDITION-ASSESSMENTS-1
- SOUTHLINK-OLDHAM-CONDITION-ASSESSMENTS-2
- SOUTHLINK-OLDHAM-METRIC-APRIL 26
- UG_3210_ARB_AIA_01_REV_06_FINAL
- UG_3210_ARB_AMS_01_REV_05_FINAL
- X0374_L_XX_PL_001 [PL9] - LANDSCAPE STRATEGY LAYOUT
- ITM210336-007-TN ADDITIONAL DESIGN INFORMATION
- BIKE STORE DETAIL
- ITM210336-GA-003A HIGHWAY PLAN
- SKPMCE15 - SOUTHLINK -PLANNING LAYOUT REV L
- SOUTHLINK - DEVELOPABLE AREA
- INFILTRATION CALCS
- NETWORK 1 CALCS
- NETWORK 2 CALCS
- NETWORK 2 CALCS 100YR
- AGENT SUPPORTING INFORMATION FAO GMEU AND UNITED UTILITIES
- AIA
- AMS
- ARBORICULTURAL METHOD STATEMENT
- ARBORICULTURAL IMPACT ASSESSMENT
- ARBORICULTURAL METHOD STATEMENT
- BIKE STORE DETAIL APTD-9101
- BIKE STORE DETAIL APTD-9203
- BIODIVERSITY NET GAIN ASSESSMENT REPORT
- COLOURED LAYOUT - SKPMCE15-CPL-01 REV E
- CRIME IMPACT STATEMENT
- 9880 CLOSE BOARDED FENCE WITH TRELLIS DETIAL
- APARTMENT BLOCK 1 - KPMCE15-APT1-01.1 REV C
- DESIGN AND ACCESS STATEMENT
- DEVELOPABLE AREA PLAN - SKPMCE15-DAP-01
- 9880 CLOSE BOARDED FENCE WITH TRELLIS DETAIL
- FRAMEWORK TRAVEL PLAN
- MATERIALS LAYOUT - SKPMCE15-ML-01 REV C
- NOISE IMPACT ASSESSMENT
- PLANNING STATEMENT (DATED NOVEMBER 2025)
- PRELIMINARY ECOLOGICAL APPRAISAL
- PROPOSED SITE PLAN - SKPMCE15.PL.01 REV K
- SKPMCE15 - SOUTHLINK - BOUNDARY PLAN REV D
- SOUTHLINK - REVISED SUBMISSION COVERING LETTER
- STREET SCENES - SKPMCE15-SS-01 REV B
- TRANSPORT ASSESSMENT
- DRAINAGE STRATEGY - MASTERPLAN
- DRAINAGE STRATEGY - SHEET 1
- DRAINAGE STRATEGY -SHEET 2
- FLOOD EXCEEDANCE PLAN
- FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY REPORT
- DRAINAGE CATCHMENT PLAN
- DRAINAGE OPERATION MANAGEMENT & MAINTENANCE REPORT_REV C
- LANDSCAPE STRATEGY LAYOUT
- ITM210336-004-TN RESPONSE TO TFGM
- SWEPT PATH ANALYSIS
- SWEPT PATH ANALYSIS 2
- JUNCTION ASSESSMENT
- JUNCTION ASSESSMENT - FUTURE
- JUNCTION ASSESSMENT
- JUNCTION ASSESSMENT - FUTURE
- PRELIMINARY ECOLOGICAL APPRAISAL - REV 3
- NIGHT-TIME BAT WALKOVER REPORT
- EXTERNAL WORKS PLAN SHEET 2 OF 2
- EXTERNAL WORKS PLAN SHEET 1 OF 2.
- TRANSPORT ASSESSMENT
- APPLICATIONFORMREDACTED
- BOUNDARY PLAN SKPMCE15-SL-01REV B
- CLOSE BOARDED FENCE (1800MM) REF GROUP-VIS-S-EX-D2-A-FC-0213
- EXTERNAL SUBSTATION SHEET 1 OF 2 REF 900350-026-0
- EXTERNAL SUBSTATION SHEET 2 OF 2 REF 900350-027-0
- HOOP TOP RAILING (900MM) REF GROUP-VIS-S-EX-D2-A-FC-0211
- HOUSETYPE 352 CONFIGURATION OPTIONS REF GROUP VIS M352B1 XX D2 A
- HOUSETYPE 352 PLAN AND ELEVATIONS REF GROUP VIS T352BO XX D2 A 0801
- HOUSETYPE 354 PLANS AND ELEVATIONS REF GROUP VIS T354B0 XX D2 A 0801
- HOUSETYPE 356 CONFIGURATION OPTIONS REF GROUP VIS M356B1 XX D2 A
- HOUSETYPE 356 PLAN AND ELEVATIONS REF GROUP VIS T356B1 XX D2 A 0801
- HOUSETYPE 463 PLAN AND ELEVATIONS REF GROUP VIS T463B0 XX D2 A 0801
- HOUSETYPE 464 CONFIGURATION OPTIONS REF GROUP VIS T464B6 XX D2 A
- HOUSETYPE 464 PLAN AND ELEVATIONS REF GROUP VIS T464B6 XX D2 A 0801
- LOCATION PLAN SKPMCE15.LP.01 REV B
- MATERIALS LAYOUT SKPMCE15-ML-01 REV B
- PLANNING LAYOUT SKPMCE15.PL.01 REV H
- POST AND RAIL FENCE (1200MM) REF GROUP-VIS-S-EX-D2-A-FC-0214
- SOUTHLINK APARTMENT BLOCK 3 - SKPMCE15-APT3-01.1 REV A
- SOUTHLINK LANDSCAPE LAYOUT X0374_L_XX_PL_001 PL4
- STANDARD DETAIL 1.8M BRICK SCREEN WALL REF GROUP-VIS-S-EX-D2-A-FC
- STREET SCENES SKPMCE15-SS-01 REV A
- TIMBER KNEE RAIL (450MM) REF GROUP-VIS-S-EX-D2-A-FC-0210)
- TOPOGRAPHICAL SURVEY SHEET 1 OF 3 REF 36539MCLS-01
- TOPOGRAPHICAL SURVEY SHEET 2 OF 3 REF 36539MCLS-02
- TOPOGRAPHICAL SURVEY SHEET 3 OF 3 REF 36539MCLS-03
- COLOURED LAYOUT SKPMCE15-CPL-01 REV D (1)
- SOUTHLINK APARTMENT BLOCK 2 - SKPMCE15-APT2-01.1 REV B
- SOUTHLINK APARTMENT BLOCK 1 - SKPMCE15-APT1-01.1 REV B
- AIR QUALITY ASSESSMENT
- CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN
- CRIME IMPACT STATEMENT
- ENERGY STATEMENT
- FRAMEWORK TRAVEL PLAN
- GEO ENVIRONMENTAL APPRAISAL AND COAL MINING RISK ASSESSMENT PART 1
- GEO ENVIRONMENTAL APPRAISAL AND COAL MINING RISK ASSESSMENT PART 3
- GEO ENVIRONMENTAL APPRAISAL AND COAL MINING RISK ASSESSMENT PART 4
- GEO ENVIRONMENTAL APPRAISAL AND COAL MINING RISK ASSESSMENT PART 5
- GEO ENVIRONMENTAL APPRAISAL AND COAL MINING RISK ASSESSMENT PART 6
- GEO ENVIRONMENTAL APPRAISAL AND COAL MINING RISK ASSESSMENT PART 7
- NOISE IMPACT ASSESSMENT
- WASTE STRATEGY
- 2746 UTILITIES FOUL SEWAGE STATEMENT_REV A
- 2746-SCE-00-00-DR-C-0001-P03 DRAINAGE STRATEGY MASTERPLAN
- 2746-SCE-00-00-DR-C-0002-P03 DRAINAGE STRATEGY SHEET 1 OF 2
- 2746-SCE-00-00-DR-C-0003-P03 DRAINAGE STRATEGY SHEET 2 OF 2
- 2746-SCE-00-00-DR-C-0004-P03 SITE LOCATION PLAN
- 2746-SCE-00-00-DR-C-0020-P03 FLOOD EXCEEDANCE PLAN
- 2746-SCE-00-00-DR-C-0500-P02 EXTERNAL WORKS PLAN SHEET 1
- 2746-SCE-00-00-DR-C-0501-P02 EXTERNAL WORKS PLAN SHEET 2
- UG _3210_ARB_AMS_01_REV_01_FINAL
- UG_3210_ARB_AIA_01_REV_02_FINAL
- HISTORIC ENVIRONMENT DESK-BASED ASSESSMENT-PART 3
- HISTORIC ENVIRONMENT DESK-BASED ASSESSMENT-PART-2 1
- HISTORIC ENVIRONMENT DESK-BASED ASSESSMENT-PART-1
- 2746 FLOOD RISK ASSESSMENT DRAINAGE STRATEGY_REV B-COMPRESSED COPY (1)-PART-1
- 2746 FLOOD RISK ASSESSMENT DRAINAGE STRATEGY_REV B-COMPRESSED COPY (1)-PART-2
- 2746 FLOOD RISK ASSESSMENT DRAINAGE STRATEGY_REV B-COMPRESSED COPY (1)-PART-3
- 2746 FLOOD RISK ASSESSMENT DRAINAGE STRATEGY_REV B-COMPRESSED COPY (1)-PART-4
- 2746 FLOOD RISK ASSESSMENT DRAINAGE STRATEGY_REV B-COMPRESSED COPY (1)-PART-6
- 2746 FLOOD RISK ASSESSMENT DRAINAGE STRATEGY_REV B-COMPRESSED COPY (1)-PART-7
- 2746 FLOOD RISK ASSESSMENT DRAINAGE STRATEGY_REV B-PART-5-1
- 2746 FLOOD RISK ASSESSMENT DRAINAGE STRATEGY_REV B-PART-5--PART-2
- 2746 FLOOD RISK ASSESSMENT DRAINAGE STRATEGY_REV B--PART-5--PART-3
- 20-3271 SOUTHLINK OLDHAM BNG
- 20-3271 SOUTHLINK OLDHAM PEA
- 203271 SOUTHLINK OLDHAM NBW
- METRIC OCT 25
- SOUTHLINK - EMPLOYMENT SKILLS PLAN
- AFFORDABLE HOUSING STATEMENT
- PLANNING STATEMENT
- DESIGN AND ACCESS STATEMENT
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Oldham for determination, against a statutory target of eight weeks. Over the last year Oldham decided full applications in a median of 182 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Unit 7-13 Whitney Court Southlink Business Park Hamilton Street Oldham OL4 1DB
94% historically approved · decision due ~28 Sep
We are a special needs school currently residing in Failsworth under OMBC. The only development to the property would be fencing around the site to enable us to keep the school site secure and to secure and safeguard our students. There will be no building works or modifications to the building or the wider site.
Awaiting decision 2 docs -
Land At Southlink Oldham
Construction of new 4th highway arm to the existing signal controlled junction of Oldham Way and Prince Street on the site of the former Mumps tram stop.
Granted Full applications 9 docs -
Land At Prince's Gate Prince Street Oldham OL1 3TL
94% historically approved · decision due ~13 Oct
Discharge of condition no. 17 (Drainage) - Partial Discharge for Block C only relating to app no. FUL/354326/25.
Awaiting decision Conditions 14 docs -
Old Ymca Building Roscoe Street And Prince Street Oldham OL1 1EL
Conversion of part of building to one self-contained apartment.
Granted Full applications 7 docs -
184 - 188 Union Street Oldham OL1 1EN
Installation of a new passenger lift to the rear of the property in the courtyard area, serving basement to the third floor.
Granted Full applications 32 docs -
92 Greengate Street Oldham OL4 1DH
Single storey rear extensions
Granted Householder Extension 3 docsSmall domestic
Other full applications
In Oldham
-
FUL/356682/26 Awaiting decision
Chadderton A F C Ltd Andrew Street Chadderton Oldham OL9 0JT
Two storey side extension to existing clubhouse with entrance improvements.
-
FUL/355457/25 Granted
St Pauls Conservative Club Hollins Road Oldham OL8 3EA
Detached commercial garage and parking area
-
FUL/356663/26 Awaiting decision
Oaklands House Shaw Road Royton Oldham OL2 6DA
Change of use from care home (Use Class C2) to supported accommodation for adults (Sui generis).
-
FUL/355967/26 Granted
62 Marlborough Drive Failsworth Oldham M35 0LE
Change of use of existing single dwelling in to two self contained flats with a two storey side extension providing access for the first floor flat.
-
FUL/356604/26 Awaiting decision
166 Middleton Road Oldham OL9 6BQ
Installation of an extraction system to the rear of the cafe.