Skip to content
PlanIndex Get alerts
Menu

Planning application

9 & 10 Hanger Lane Ealing London W5 3HH London

Refused Old Oak and Park Royal Development Corporation P/2009/0277 Full Application

Works: New dwelling Demolition

Refused. Only the applicant can appeal, within the statutory time limit, and a revised scheme can be submitted instead.

Proposal

Demolition of hotels and erection of part 3, 4 and 5 storey building containing 27 residential units (1 studio flat, 12 one-bedroom flats, 11 two-bedroom flats and 3 three bedrom maisonettes) of which 8 (5 one-bedroom and 3 two-bedroom) are intermediate units, provision of 2 frontage disabled car parking space with access off Hanger Lane and 2 frontage disabled space with access off Creffield Road, cycle parking storage, refuse/recycling storage, landscaping and garden with play area

As published by the council, reference P/2009/0277

Application record

Reference
P/2009/0277
Type
Full Application
Status
Refused
Decision
Refused
Received
16 Jan 2009
Validated
20 Jan 2009
Decided
3 Jul 2009
Ward
Ealing Common
Decision by
Committee Decision
Postcode
W5 3HH

Timeline

Dates from the published record

  1. 16 Jan 2009

    Received by Old Oak and Park Royal Development Corporation

  2. 20 Jan 2009

    Validated

    Checked as complete and ready for consideration.

  3. 3 Jul 2009

    Decision issued: Refused

  4. 3 Aug 2026

    Added to PlanIndex

What refusal means

The process from here

The council refused this application for the reasons set out on the decision notice, which the council portal holds in full. Only the applicant can appeal a refusal; the time limit runs from the decision date and is shorter for householder schemes.

Refusal does not prevent a fresh attempt. Applicants often address the reasons for refusal and resubmit, so a refused scheme is not necessarily the end of proposals for the site.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 9 & 10 Hanger Lane Ealing London W5 3HH London

    P/2009/0277 Submitted 16 Jan 2009 0m away

    Demolition of hotels and erection of part 3, 4 and 5 storey building containing 27 residential units (1 studio flat, 12 one-bedroom flats, 11 two-bedroom flats and 3 three bedrom maisonettes) of which 8 (5 one-bedroom and 3 two-bedroom) are intermediate units, provision of 2 frontage disabled car parking space with access off Hanger Lane and 2 frontage disabled space with access off Creffield Road, cycle parking storage, refuse/recycling storage, landscaping and garden with play area

    Refused Full applications New dwelling Demolition
  • 1E Freeland Road Ealing W5 3HR

    210107FUL Submitted 11 Jan 2021 9m away

    Single storey outbuilding for ancillary use as office/study. Removal of part of wall to create access.

    Granted Full applications 20 docs
    Small domestic
  • 1E Freeland Road Ealing W5 3HR

    210107FUL Submitted 11 Jan 2021 9m away

    Single storey outbuilding for ancillary use as office/study. Removal of part of wall to create access.

    Granted Full applications 20 docs
    Small domestic
  • Cecilia House 16 - 17 Hanger Lane Ealing W5 3HH

    254825FUL Submitted 23 Dec 2025 41m away

    Single storey rear extension to provide 2 additional units (total of 31 HMO units) to large House in Multiple Occupation (Sui Generis) with existing 29 HMO units

    At appeal Full applications Extension 19 docs
    Small domestic
  • Cecilia House 16 - 17 Hanger Lane Ealing W5 3HH

    254825FUL Submitted 23 Dec 2025 41m away

    Single storey rear extension to provide 2 additional units (total of 31 HMO units) to large House in Multiple Occupation (Sui Generis) with existing 29 HMO units

    At appeal Full applications Extension 19 docs
    Small domestic
  • 1 North Common Lodge Hanger Lane Ealing W5 2EL

    260679PTC Submitted 17 Feb 2026 70m away

    T1 Robinia - Remove limb growing towards clients house back to the main stem approx 5m.

    Granted Trees 2 docs

In Old Oak and Park Royal Development Corporation

  • 26/0129/FULOPDC Status unknown

    6, Standard Road, Ealing, Park Royal, NW10 6EU

    Retrospective change of use of the building from Use Class B8 (storage and distr

    3 Sep 2026 Full applications
  • 262639FUL Refused

    43 Second Avenue Acton W3 7RX

    Conversion of existing dwellinghouse into four self-contained flats

    2 Jul 2026 Full applications
  • 261981FUL Granted

    8 Lyon Way Greenford UB6 0BN

    Use of the site as use Classes E(g)(iii) (industrial process), B2 (Industrial) and B8 (Storage) uses and ancillary floor space

    13 May 2026 Full applications
  • 262368FUL Granted

    43/43A Mill Hill Road Acton W3 8JE

    Deconversion of two self contained flats to single dwellinghouse (Use Class C3) and associated internal alterations

    12 Jun 2026 Full applications
  • 262102FUL Refused

    10 Church Road Acton W3 8PP

    Construction of third floor to provide additional self-contained flat with provision of cycle and waste storage; rear outrigger roof extension and alterations to second floor flat

    21 May 2026 Full applications