Planning application

Park Royal Road East And West Sites

Awaiting decision Old Oak and Park Royal Development Corporation 263302OPDCOB OPDC Consultation by Other Boroughs

Works: Demolition

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Discharge of condition 7 (Construction Logistics Plan) (site-wide) and partial discharge of condition 8 (Construction and Environmental Management Plan) in relation to demolition and enabling works for Building A, pursuant to planning permission reference 23/0014/FUMOPDC dated 27/03/2025 for 'Demolition of all existing buildings and structures and the redevelopment of the sites through construction of a building known as Block A (east site) for student accommodation (sui generis) with ancillary facilities including classrooms, flexible space and two auditoriums, and light industrial use (Class E(g)(iii)); construction of a second building known as Block B (west site) comprising residential units (use class C3) with flexible commercial uses (Class E) at ground and lower ground floor; and, associated works of landscaping, public realm improvements and other works associated with the development. The application is accompanied by an Environmental Statement.' (Out of Borough)

As published by the council, reference 263302OPDCOB

Application record

Reference
263302OPDCOB
Type
OPDC Consultation by Other Boroughs
Status
Pending Consideration
Received
2 Sep 2026
Validated
2 Sep 2026
Ward
Out Of Borough

Site history

Applications at this address on the Old Oak and Park Royal Development Corporation register

This site has had 6 applications since 2025: 3 approved, 0 refused.

  • 26/0138/AODOPDC Status unknown

    Park Royal Road East and West sites

    Discharge of condition 7 (Construction Logistics Plan) (site-wide) and partial d

    Submitted 26 Aug 2026 Conditions
  • 262924OPDCOB Granted

    Park Royal Road East And West Sites

    Details of condition 9 (Fibre Connectivity Plans) for Block A pursuant to planning permission reference 23/0014/FUMOPDC dated 26/03/2025 for Demolition of all existing buildings and structures and the redevelopment of the sites through construction of a building known as Block A (east site) for student accommodation (sui generis) with ancillary facilities including classrooms, flexible space and two auditoriums, and light industrial use (Class E(g)(iii)); construction of a second building known as Block B (west site) comprising residential units (use class C3) with flexible commercial uses (Class E) at ground and lower ground floor; and, associated works of landscaping, public realm improvements and other works associated with the development. The application is accompanied by an Environmental Statement ( out of borough)

    Decided 17 Aug 2026 Outline
  • 26/0124/AODOPDC Status unknown

    Park Royal Road East and West sites

    Details of condition 9 (Fibre Connectivity Plans) for Block A pursuant to planni

    Submitted 21 Jul 2026 Conditions
  • 254745CONS Granted

    Park Royal Road East And West Sites

    Partial discharge of condition 6 (i) ((a) Ground Conditions & (b) Remediation Report) pursuant to planning permission 23/0014/FUMOPDC dated 27/03/2025 for demolition of all existing buildings and structures and the redevelopment of the sites through construction of a building known as Block A (east site) for student accommodation (sui generis) with ancillary facilities including classrooms, flexible space and two auditoriums, and light industrial use (Class E(g)(iii)); construction of a second building known as Block B (west site) comprising residential units (use class C3) with flexible commercial uses (Class E) at ground and lower ground floor; and, associated works of landscaping, public realm improvements and other works associated with the development. The application is accompanied by an Environmental Statement. (Out of borough)

    Decided 19 Dec 2025 Outline
  • 25/0217/AODOPDC Granted

    Park Royal Road East and West sites

    Partial discharge of condition 6 (i) (Contaminated Land) pursuant to planning pe

    Decided 12 Mar 2026 Conditions

Timeline

Dates from the published record

  1. 2 Sep 2026

    Received by Old Oak and Park Royal Development Corporation

  2. 10 Sep 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 28 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Old Oak and Park Royal Development Corporation took a median of 55 days over the applications it decided in the last year.

What happens while it is decided

This application is with Old Oak and Park Royal Development Corporation for determination, against a statutory target of eight weeks. Over the last year Old Oak and Park Royal Development Corporation decided outline applications in a median of 22 days. More in our guide to how long planning decisions take.

About outline applications

An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.

In Old Oak and Park Royal Development Corporation

  • 262400CONS Decided

    Gunnersbury Park, Popes Lane Ealing W3 8LQ

    Temporary change of use of areas of Gunnersbury Park for the staging of temporary events between 01 January 2027 and 31 December 2031. Up to 22 live event days per calendar year, with a total of 115 days including set-up, inactive and removal days. Including the erection of associated temporary structures, fencing, ancillary concessions and facilities. (out of borough)

    12 Jun 2026 Outline
  • 263099CONS Decided

    Gunnersbury Park, Popes Lane Ealing W3 8LQ

    Temporary change of use of areas of Gunnersbury Park for the staging of temporary events between 01 January 2027 and 31 December 2031. Up to 19 live event days per calendar year, with a total of 115 days including set-up, inactive and removal days, and trackway. Including the erection of associated temporary structures, fencing, ancillary concessions and facilities. (Out of Borough from Hounslow)

    12 Aug 2026 Outline
  • 262743PACBSD Refused

    26-30 Ealing Gateway Uxbridge Road Ealing W5 2AU

    Change of use from office floorspace (Use Class E(g)(i)) to residential x 68 flats (Use Class C3) (Class MA, 56 day Prior Approval Process)

    10 Jul 2026 Outline
  • 263151OPDCOB Granted

    Imperial College Office Woodward Buildings 1 Victoria Road Acton W3 6FA

    Installation of two wooden poster-boards to the fence at the intersection of Victoria Road and Chase Road. (Out of Borough Consultation from the OPDC)

    14 Aug 2026 Outline
  • 263070OPDCOB Granted

    Frogmore Industrial Estate Acton Lane Park Royal NW10 7NQ

    Demolition of existing boundary walls and retaining walls, removal of existing hardstanding, removal of redundant drainage infrastructure, diversion of below ground services, soil remediation works, earthworks to regrade site levels, installation of piling mat and construction of piles, installation of hoardings, and installation of demountable site management buildings (Out of Borough from Old Oak and Park Royal Development Corporation)

    7 Aug 2026 Outline