Planning application
10 Montague Road Southall UB2 5PB
Works: Extension Loft or dormer Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Sub-division of site for construction of an additional 2-bedroom dwellinghouse; first floor side extension, part two-storey, part single-storey rear/side extension; rear roof extension and front rooflight to existing dwelling; associated parking, refuse store and amenity space
As published by the council, reference 260934FUL
Application record
- Reference
- 260934FUL
- Type
- Full Application
- Status
- Granted with Conditions
- Decision
- Grant with Conditions
- Received
- 4 Mar 2026
- Validated
- 4 Mar 2026
- Decided
- 25 Jun 2026
- Ward
- Southall Green
- Decision by
- Delegated Decision
- Postcode
- UB2 5PB
Timeline
Dates from the published record
-
4 Mar 2026
Received by Old Oak and Park Royal Development Corporation
-
25 Jun 2026
Decision issued: Grant with Conditions
-
3 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, a design practice registered in Hounslow
100 applications on PlanIndex · across 17 councils · 83% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
13 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
10 Montague Road Southall UB2 5PB
Sub-division of site for construction of an additional 2-bedroom dwellinghouse; first floor side extension, part two-storey, part single-storey rear/side extension; rear roof extension and front rooflight to existing dwelling; associated parking, refuse store and amenity space
Granted Full applications Extension Loft or dormer 13 docsSmall domestic -
14 Montague Road Southall UB2 5PB
Replacement of windows, external doors, fixtures and fittings including front entrance canopy, fascias and rainwater goods; and all other associated internal and external alterations and improvements (Regulation 3 - Application by London Borough of Ealing) (Lawful Development Certificate for a Proposed Development)
Granted Lawful development Windows or glazing 5 docs -
22 Montague Road Southall UB2 5PB
87% historically approved · decision due ~16 Sep
Alteration of roof from hip to gable end; rear roof extension (Lawful Development Certificate for a Proposed Development)
Awaiting decision Lawful development Extension Loft or dormer 4 docs -
22 Montague Road Southall UB2 5PB
87% historically approved · decision due ~16 Sep
Alteration of roof from hip to gable end; rear roof extension (Lawful Development Certificate for a Proposed Development)
Awaiting decision Extension Loft or dormer 4 docs -
11 Montague Road Southall UB2 5PB
Replacement of windows, external doors, fixtures and fittings including front entrance canopy, fascias and rainwater goods; and all other associated internal and external alterations and improvements (Regulation 3 - Application by London Borough of Ealing) (Lawful Development Certificate for a Proposed Development)
Granted Lawful development Windows or glazing 5 docs -
11 Montague Road Southall UB2 5PB
Replacement of windows, external doors, fixtures and fittings including front entrance canopy, fascias and rainwater goods; and all other associated internal and external alterations and improvements (Regulation 3 - Application by London Borough of Ealing) (Lawful Development Certificate for a Proposed Development)
Granted Lawful development Windows or glazing 5 docs
Other full applications applications
In Old Oak and Park Royal Development Corporation
-
26/0129/FULOPDC Status unknown
6, Standard Road, Ealing, Park Royal, NW10 6EU
Retrospective change of use of the building from Use Class B8 (storage and distr
-
262639FUL Refused
43 Second Avenue Acton W3 7RX
Conversion of existing dwellinghouse into four self-contained flats
-
261981FUL Granted
8 Lyon Way Greenford UB6 0BN
Use of the site as use Classes E(g)(iii) (industrial process), B2 (Industrial) and B8 (Storage) uses and ancillary floor space
-
262368FUL Granted
43/43A Mill Hill Road Acton W3 8JE
Deconversion of two self contained flats to single dwellinghouse (Use Class C3) and associated internal alterations
-
262102FUL Refused
10 Church Road Acton W3 8PP
Construction of third floor to provide additional self-contained flat with provision of cycle and waste storage; rear outrigger roof extension and alterations to second floor flat