Planning application
114-116 Boston Road Hanwell W7 2EP
Works: Extension Loft or dormer
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Rear roof extension; rear outrigger roof extension; conversion of roofspace for habitable roofspace to provide one additional self-contained flat; installation of two rooflights to front roofslope; installation of staircase to rear; installation of wooden door; installation of bin storage (Joint application)
As published by the council, reference 253771FUL
Application record
- Reference
- 253771FUL
- Type
- Full Application
- Status
- Granted with Conditions
- Decision
- Grant with Conditions
- Received
- 6 Oct 2025
- Validated
- 6 Oct 2025
- Decided
- 20 Jan 2026
- Ward
- Hanwell Broadway
- Decision by
- Delegated Decision
- Postcode
- W7 2EP
Timeline
Dates from the published record
-
6 Oct 2025
Received by Old Oak and Park Royal Development Corporation
-
20 Jan 2026
Decision issued: Grant with Conditions
-
10 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
20 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
114-116 Boston Road Hanwell W7 2EP
Rear roof extension; rear outrigger roof extension; conversion of roofspace for habitable roofspace to provide one additional self-contained flat; installation of two rooflights to front roofslope; installation of staircase to rear; installation of wooden door; installation of bin storage (Joint application)
Granted Full applications Extension Loft or dormer 20 docs -
Domestic
-
Domestic
-
Domestic
-
Domestic
-
Small domestic
Other full applications applications
In Old Oak and Park Royal Development Corporation
-
26/0129/FULOPDC Status unknown
6, Standard Road, Ealing, Park Royal, NW10 6EU
Retrospective change of use of the building from Use Class B8 (storage and distr
-
262639FUL Refused
43 Second Avenue Acton W3 7RX
Conversion of existing dwellinghouse into four self-contained flats
-
261981FUL Granted
8 Lyon Way Greenford UB6 0BN
Use of the site as use Classes E(g)(iii) (industrial process), B2 (Industrial) and B8 (Storage) uses and ancillary floor space
-
262368FUL Granted
43/43A Mill Hill Road Acton W3 8JE
Deconversion of two self contained flats to single dwellinghouse (Use Class C3) and associated internal alterations
-
262102FUL Refused
10 Church Road Acton W3 8PP
Construction of third floor to provide additional self-contained flat with provision of cycle and waste storage; rear outrigger roof extension and alterations to second floor flat