Skip to content
PlanIndex Get alerts
Menu

Planning application

Southall Gas Works Site The Straight Southall Middlesex UB1 1QX

Granted Old Oak and Park Royal Development Corporation 214007CND Discharge Condition

Works: Demolition Major scheme

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Details of Foundation Design pursuant to Condition 39 of planning permission ref: PP/2015/4682 dated 18.02.2016 as varied by 170819VAR dated 07.09.2017, 171094NMA 13.04.2017, 171562VAR dated 16.10.2017, 185242NMA dated 10.12.2018, 193322NMA dated 02.09.2019, 194098NMA dated 03.10.2019 and 202725NMA dated 11.08.2020 for: 'demolition of 22 houses; the remediation of the land & the redevelopment of the site to deliver a large mixed use development including residential, non-food retail, food retail, restaurants, bars & cafes, hotel, conference & banqueting, cinema, health care facilities, education facilities, office/studio units, car park, sports pavilion, an energy centre, multi-storey car park and associated car & cycle parking, landscaping, public realm, open space & children's play space. Full application: new access roads from the Hayes-By-Pass & Southall town centre to the application site for vehicle, cycle & pedestrian access, including drainage & a flood relief pond. Widening of South Road across the railway line, for the creation of a bus lane & three new accesses onto Beaconsfield Road. Two bridges over the Grand Union Canal & Yeading Brook to provide pedestrian and cycle access to Minet Country Park & Springfield Road. The quantum of development remains the same as the original scheme with the exception that the proposed development includes revised positioning of the hotel, supermarket & banqueting hall the removal of the multi-storey car park to be replaced by basement car parking spaces; the removal of the east/west bus & taxi route through the Civic Square to be replaced by a dedicated pedestrian route & use for emergency vehicular access; proposed changes to the horizontal & vertical (height differences ranging between minus 4.5m & plus 17.5m) parameters & the locations of ground and upper floor uses with an amendment to the spatial arrangement of the public & private realm with no change in the public-private realm split.

As published by the council, reference 214007CND

Application record

Reference
214007CND
Type
Discharge Condition
Status
Approved
Decision
Granted As published: Approved
Received
2 Jun 2021
Validated
2 Jun 2021
Decided
11 Aug 2021
Ward
Southall Broadway
Decision by
Delegated Decision
Postcode
UB1 1QX

Site history

Applications at this address on the Old Oak and Park Royal Development Corporation register

This site has had 2 applications since 2021: 2 approved, 0 refused.

  • 214006CND Granted

    Southall Gas Works Site The Straight Southall Middlesex UB1 1QX

    Details of Below Ground Drainage Layout part pursuant to Condition 65 (Phase 3) of planning permission ref: 171562VAR dated 16.10.2017 as varied by 185242NMA dated 10.12.2018, 193322NMA dated 02.09.2019, 194098NMA dated 03.10.2019 and 202725NMA dated 11.08.2020 for: 'demolition of 22 houses; the remediation of the land & the redevelopment of the site to deliver a large mixed use development including residential, non-food retail, food retail, restaurants, bars & cafes, hotel, conference & banqueting, cinema, health care facilities, education facilities, office/studio units, car park, sports pavilion, an energy centre, multi-storey car park and associated car & cycle parking, landscaping, public realm, open space & children's play space. Full application: new access roads from the Hayes-By-Pass & Southall town centre to the application site for vehicle, cycle & pedestrian access, including drainage & a flood relief pond. Widening of South Road across the railway line, for the creation of a bus lane & three new accesses onto Beaconsfield Road. Two bridges over the Grand Union Canal & Yeading Brook to provide pedestrian and cycle access to Minet Country Park & Springfield Road. The quantum of development remains the same as the original scheme with the exception that the proposed development includes revised positioning of the hotel, supermarket & banqueting hall the removal of the multi-storey car park to be replaced by basement car parking spaces; the removal of the east/west bus & taxi route through the Civic Square to be replaced by a dedicated pedestrian route & use for emergency vehicular access; proposed changes to the horizontal & vertical (height differences ranging between minus 4.5m & plus 17.5m) parameters & the locations of ground and upper floor uses with an amendment to the spatial arrangement of the public & private realm with no change in the public-private realm split

    Decided 3 Aug 2021 Conditions

Timeline

Dates from the published record

  1. 2 Jun 2021

    Received by Old Oak and Park Royal Development Corporation

  2. 11 Aug 2021

    Decision issued: Approved

  3. 3 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

52 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Old Oak and Park Royal Development Corporation granted permission on 11 August 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Southall Gas Works Site The Straight Southall Middlesex UB1 1QX

    214007CND Submitted 2 Jun 2021 50 yards away

    Details of Foundation Design pursuant to Condition 39 of planning permission ref: PP/2015/4682 dated 18.02.2016 as varied by 170819VAR dated 07.09.2017, 171094NMA 13.04.2017, 171562VAR dated 16.10.2017, 185242NMA dated 10.12.2018, 193322NMA dated 02.09.2019, 194098NMA dated 03.10.2019 and 202725NMA dated 11.08.2020 for: 'demolition of 22 houses; the remediation of the land & the redevelopment of the site to deliver a large mixed use development including residential, non-food retail, food retail, restaurants, bars & cafes, hotel, conference & banqueting, cinema, health care facilities, education facilities, office/studio units, car park, sports pavilion, an energy centre, multi-storey car park and associated car & cycle parking, landscaping, public realm, open space & children's play space. Full application: new access roads from the Hayes-By-Pass & Southall town centre to the application site for vehicle, cycle & pedestrian access, including drainage & a flood relief pond. Widening of South Road across the railway line, for the creation of a bus lane & three new accesses onto Beaconsfield Road. Two bridges over the Grand Union Canal & Yeading Brook to provide pedestrian and cycle access to Minet Country Park & Springfield Road. The quantum of development remains the same as the original scheme with the exception that the proposed development includes revised positioning of the hotel, supermarket & banqueting hall the removal of the multi-storey car park to be replaced by basement car parking spaces; the removal of the east/west bus & taxi route through the Civic Square to be replaced by a dedicated pedestrian route & use for emergency vehicular access; proposed changes to the horizontal & vertical (height differences ranging between minus 4.5m & plus 17.5m) parameters & the locations of ground and upper floor uses with an amendment to the spatial arrangement of the public & private realm with no change in the public-private realm split.

    Granted Conditions Demolition 52 docs
    Major scheme
  • Southall Gas Works Site The Straight Southall Middlesex UB1 1QX

    214006CND Submitted 2 Jun 2021 50 yards away

    Details of Below Ground Drainage Layout part pursuant to Condition 65 (Phase 3) of planning permission ref: 171562VAR dated 16.10.2017 as varied by 185242NMA dated 10.12.2018, 193322NMA dated 02.09.2019, 194098NMA dated 03.10.2019 and 202725NMA dated 11.08.2020 for: 'demolition of 22 houses; the remediation of the land & the redevelopment of the site to deliver a large mixed use development including residential, non-food retail, food retail, restaurants, bars & cafes, hotel, conference & banqueting, cinema, health care facilities, education facilities, office/studio units, car park, sports pavilion, an energy centre, multi-storey car park and associated car & cycle parking, landscaping, public realm, open space & children's play space. Full application: new access roads from the Hayes-By-Pass & Southall town centre to the application site for vehicle, cycle & pedestrian access, including drainage & a flood relief pond. Widening of South Road across the railway line, for the creation of a bus lane & three new accesses onto Beaconsfield Road. Two bridges over the Grand Union Canal & Yeading Brook to provide pedestrian and cycle access to Minet Country Park & Springfield Road. The quantum of development remains the same as the original scheme with the exception that the proposed development includes revised positioning of the hotel, supermarket & banqueting hall the removal of the multi-storey car park to be replaced by basement car parking spaces; the removal of the east/west bus & taxi route through the Civic Square to be replaced by a dedicated pedestrian route & use for emergency vehicular access; proposed changes to the horizontal & vertical (height differences ranging between minus 4.5m & plus 17.5m) parameters & the locations of ground and upper floor uses with an amendment to the spatial arrangement of the public & private realm with no change in the public-private realm split

    Granted Conditions Demolition 7 docs
    Major scheme
  • Southall Gas Works Site The Straight Southall Middlesex UB1 1QX

    214006CND Submitted 2 Jun 2021 50 yards away

    Details of Below Ground Drainage Layout part pursuant to Condition 65 (Phase 3) of planning permission ref: 171562VAR dated 16.10.2017 as varied by 185242NMA dated 10.12.2018, 193322NMA dated 02.09.2019, 194098NMA dated 03.10.2019 and 202725NMA dated 11.08.2020 for: 'demolition of 22 houses; the remediation of the land & the redevelopment of the site to deliver a large mixed use development including residential, non-food retail, food retail, restaurants, bars & cafes, hotel, conference & banqueting, cinema, health care facilities, education facilities, office/studio units, car park, sports pavilion, an energy centre, multi-storey car park and associated car & cycle parking, landscaping, public realm, open space & children's play space. Full application: new access roads from the Hayes-By-Pass & Southall town centre to the application site for vehicle, cycle & pedestrian access, including drainage & a flood relief pond. Widening of South Road across the railway line, for the creation of a bus lane & three new accesses onto Beaconsfield Road. Two bridges over the Grand Union Canal & Yeading Brook to provide pedestrian and cycle access to Minet Country Park & Springfield Road. The quantum of development remains the same as the original scheme with the exception that the proposed development includes revised positioning of the hotel, supermarket & banqueting hall the removal of the multi-storey car park to be replaced by basement car parking spaces; the removal of the east/west bus & taxi route through the Civic Square to be replaced by a dedicated pedestrian route & use for emergency vehicular access; proposed changes to the horizontal & vertical (height differences ranging between minus 4.5m & plus 17.5m) parameters & the locations of ground and upper floor uses with an amendment to the spatial arrangement of the public & private realm with no change in the public-private realm split

    Granted Conditions Demolition 7 docs
    Major scheme
  • The Straight Southall Middlesex UB1 1QX

    214008CND Submitted 2 Jun 2021 50 yards away

    Details of refuse, cycle and car parking storage and layout pursuant to Condition 4 of Planning Permisison ref: 205101REM dated 23.04.2021, originally decided by 171562VAR dated 16.10.2017 for demolition of 22 houses; the remediation of the land and the redevelopment of the site to deliver a large mixed use development including residential, non-food retail, food retail, restaurants, bars and cafes, hotel, conference and banqueting, cinema, health care facilities, education facilities, office/studio units, car park, sports pavilion, an energy centre, multi-storey car park and associated car and cycle parking, landscaping, public realm, open space and children's play space. Full application: new access roads from the Hayes-By-Pass and Southall town centre to the application site for vehicle, cycle and pedestrian access, including drainage and a flood relief pond. Widening of South Road across the railway line, for the creation of a bus lane and three new accesses onto Beaconsfield Road. Two bridges over the Grand Union Canal and Yeading Brook to provide pedestrian and cycle access to Minet Country Park and Springfield Road. The quantum of development remains the same as the original scheme with the exception that the proposed development includes revised positioning of the hotel, supermarket and banqueting hall; the removal of the multi-storey car park to be replaced by basement car parking spaces; the removal of the east/west bus and taxi route through the Civic Square to be replaced by a dedicated pedestrian route and use for emergency vehicular access; proposed changes to the horizontal and vertical (height differences ranging between minus 4.5m and plus 17.5m) parameters and the locations of ground and upper floor uses; with an amendment to the spatial arrangement of the public and private realm with no change in the public-private realm split.

    Granted Conditions Demolition 5 docs
    Major scheme
  • The Straight Southall Middlesex UB1 1QX

    214008CND Submitted 2 Jun 2021 50 yards away

    Details of refuse, cycle and car parking storage and layout pursuant to Condition 4 of Planning Permisison ref: 205101REM dated 23.04.2021, originally decided by 171562VAR dated 16.10.2017 for demolition of 22 houses; the remediation of the land and the redevelopment of the site to deliver a large mixed use development including residential, non-food retail, food retail, restaurants, bars and cafes, hotel, conference and banqueting, cinema, health care facilities, education facilities, office/studio units, car park, sports pavilion, an energy centre, multi-storey car park and associated car and cycle parking, landscaping, public realm, open space and children's play space. Full application: new access roads from the Hayes-By-Pass and Southall town centre to the application site for vehicle, cycle and pedestrian access, including drainage and a flood relief pond. Widening of South Road across the railway line, for the creation of a bus lane and three new accesses onto Beaconsfield Road. Two bridges over the Grand Union Canal and Yeading Brook to provide pedestrian and cycle access to Minet Country Park and Springfield Road. The quantum of development remains the same as the original scheme with the exception that the proposed development includes revised positioning of the hotel, supermarket and banqueting hall; the removal of the multi-storey car park to be replaced by basement car parking spaces; the removal of the east/west bus and taxi route through the Civic Square to be replaced by a dedicated pedestrian route and use for emergency vehicular access; proposed changes to the horizontal and vertical (height differences ranging between minus 4.5m and plus 17.5m) parameters and the locations of ground and upper floor uses; with an amendment to the spatial arrangement of the public and private realm with no change in the public-private realm split.

    Granted Conditions Demolition 5 docs
    Major scheme
  • Southall Gas Works Site The Straight Southall Ealing UB1 1QX

    214005CND Submitted 2 Jun 2021 50 yards away

    Submission of a Sustainability Statement part pursuant to Condition 44 (Phase 1 Block I and J) of planning permission ref: 171562VAR dated 16.10.2017 as varied by 185242NMA dated 10.12.2018, 193322NMA dated 02.09.2019, 194098NMA dated 03.10.2019 and 202725NMA dated 11.08.2020 for: 'demolition of 22 houses; the remediation of the land & the redevelopment of the site to deliver a large mixed use development including residential, non-food retail, food retail, restaurants, bars & cafes, hotel, conference & banqueting, cinema, health care facilities, education facilities, office/studio units, car park, sports pavilion, an energy centre, multi-storey car park and associated car & cycle parking, landscaping, public realm, open space & children's play space. Full application: new access roads from the Hayes-By-Pass & Southall town centre to the application site for vehicle, cycle & pedestrian access, including drainage & a flood relief pond. Widening of South Road across the railway line, for the creation of a bus lane & three new accesses onto Beaconsfield Road. Two bridges over the Grand Union Canal & Yeading Brook to provide pedestrian and cycle access to Minet Country Park & Springfield Road. The quantum of development remains the same as the original scheme with the exception that the proposed development includes revised positioning of the hotel, supermarket & banqueting hall the removal of the multi-storey car park to be replaced by basement car parking spaces; the removal of the east/west bus & taxi route through the Civic Square to be replaced by a dedicated pedestrian route & use for emergency vehicular access; proposed changes to the horizontal & vertical (height differences ranging between minus 4.5m & plus 17.5m) parameters & the locations of ground and upper floor uses with an amendment to the spatial arrangement of the public & private realm with no change in the public-private realm split

    Granted Conditions Demolition 179 docs
    Major scheme

In Old Oak and Park Royal Development Corporation

  • 261841CND Granted

    Land Between Park View And Cloister Road Western Avenue Acton W3 6XZ

    Submission of details to partially discharge Condition 23 (Details of sound insulation); attached to planning permission 224371FUL dated 13 September 2023, as varied by planning references 233857VAR dated 7th June 2024 and 234049NMA dated 18 December 2023

    Received 5 May, published by the council 27 Jul 2026 Conditions
  • 261995CND Refused

    Freedom Worship Centre Western Road Southall UB2 5EA

    Details of a Odour Risk Assessment/Odour Abatement Equipment and Extract System part pursuant to Condition12 (Phase 1 only), of planning permission ref: 235010FUL dated 27.02.2026

    Received 14 May, published by the council 27 Jul 2026 Conditions
  • 26/0147/AODOPDC Status unknown

    Aggregate House, 100 Twyford Abbey Road, NW10 7XE

    Details of part i) of condition 9 (Contaminated Land) pursuant to planning permi

    Received 9 Sep, published by the council 15 Sep 2026 Conditions
  • 26/0146/AODOPDC Awaiting decision

    1, Portal Way, LONDON, W3 6RS

    Discharge of condition 41 (Phasing Plan) pursuant to planning permission referen

    Received 9 Sep, published by the council 17 Sep 2026 Conditions
  • 262817CND Granted

    1 Stirling Road/1-9 Colville Road And 67-81 Stirling Road Acton W3 8DJ

    Details pursuant to part (d) of Condition 36 (Energy and CO2) in relation to planning permission 232800FUL dated 08.05.2024 for 'Demolition of existing buildings and construction of a mixed use development comprising commercial floorspace, residential units (Use Class C3) and purpose built student housing (Sui Generis), within two buildings, comprising 20 and 11 storeys, with landscaping, and associated ancillary and enabling works'

    Received 17 Jul, published by the council 20 Aug 2026 Conditions