Skip to content
PlanIndex Get alerts
Menu

Planning application

57-67 Park House Friar Lane Nottingham Nottingham City NG1 6DH

Awaiting decision Nottingham 24/01492/PFUL3 Full planning application

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Enclosure of front entrance lobby by retractable security grill gates or glass doors to the 3 commercial units

As published by the council, reference 24/01492/PFUL3

Application record

Reference
24/01492/PFUL3
Type
Full planning application
Status
Pending Consideration
Received
3 Sep 2024
Validated
13 Sep 2024
Ward
Castle (May 2019)
Postcode
NG1 6DH

Timeline

Dates from the published record

  1. 3 Sep 2024

    Received by Nottingham

  2. 13 Sep 2024

    Validated

    Checked as complete and ready for consideration.

  3. 25 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 8 November 2024, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Nottingham took a median of 81 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Nottingham for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Third Floor Park House 63 - 67 Friar Lane Nottingham

    21/00976/PFUL3 Submitted 29 Apr 2021 2m away

    Installation of 7 dormer windows to rear and conservation rooflght to front roof slope

    Granted Full applications Loft or dormer Windows or glazing 9 docs
  • 63-67 Park House, Ground Floor And Basement Friar Lane Nottingham Nottingham City NG1 6DH

    25/01926/PFUL3 Submitted 15 Oct 2025 7m away

    Sub-division of existing commercial unit into 3 units continuing within Use Class E including external alterations to the commercial frontage to create 3 separate entrances

    Granted Full applications 8 docs
    Several homes
  • Castle House Friar Lane Nottingham Nottingham City NG1 6DH

    22/00510/PVAR3 Submitted 8 Mar 2022 28m away

    Conversion of Office (Class E) to one dwelling (Class C3), erection of rear third floor extension, re-instatement of roof to garage and formation of roof terrace (variation of condition S1 of planning permission reference 21/00191/PFUL3 to incorporate revisions to the external fire escape and pergola to roof)

    Granted Conditions Extension 4 docs
    Domestic
  • Castle House Friar Lane Nottingham NG1 6DH

    21/00191/PFUL3 Submitted 28 Jan 2021 31m away

    Conversion of Office (Class E) to one dwelling (Class C3), erection of rear third floor extension, re-instatement of roof to garage and formation of roof terrace

    Granted Full applications Extension 7 docs
    Domestic
  • 58 Maid Marian Way Nottingham Nottingham City NG1 6BJ

    25/00913/PFUL3 Submitted 15 May 2025 34m away

    Proposed installation of extractor canopy to rear of building

    Granted Full applications 7 docs
  • 88-90 Friar Lane Nottingham Nottingham City NG1 6EB

    26/01234/PFUL3 Submitted 16 Jul 2026 36m away

    94% historically approved · decision due ~17 Sep

    Replacement shop front

    Decided Windows or glazing 13 docs

In Nottingham

  • 26/00125/PFUL3 Withdrawn

    Five Acres Hempshill Lane Nottingham Nottingham City NG6 8PF

    Conversion of garage to granny room

    26 Jan 2026 Full applications
  • 26/00468/PFUL3 Granted

    126 Morley Avenue Nottingham Nottingham City NG3 5FW

    Conversion of 126 Morley Avenue to a three bedroom dwelling with one off road parking space

    25 Mar 2026 Full applications
  • 26/00124/PFUL3 Granted

    36 Jersey Gardens Nottingham Nottingham City NG3 2QP

    Garage conversion together with a single storey side and rear extension forming storage and home office accommodation

    26 Jan 2026 Full applications
  • 26/00612/PFUL3 Granted

    The Futurist Valley Road Nottingham Nottingham City NG5 1JE

    Change of use to B2 use (General Industrial) and MOT tests

    20 Apr 2026 Full applications
  • 26/00494/PFUL3 Granted

    31 Wollaton Hall Drive Nottingham Nottingham City NG8 1AF

    Two-storey extensions to the front, side, and rear, alterations to the roof including front and rear dormers, creation of first-floor front terrace above a single-storey projection, removal of chimney sticks and fenestration changes to all elevations.

    30 Mar 2026 Full applications