Skip to content
PlanIndex Get alerts
Menu

Planning application

6 Forest Road East Nottingham Nottingham City NG1 4HH

Granted Nottingham 24/00532/PFUL3 Full planning application

Works: Loft or dormer

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Rooflight and boiler flue

As published by the council, reference 24/00532/PFUL3

Application record

Reference
24/00532/PFUL3
Type
Full planning application
Status
Decided
Decision
Grant conditional permission
Received
28 Mar 2024
Validated
28 Mar 2024
Decided
19 Dec 2024
Ward
Hyson Green And Arboretum (May 2019)
Decision by
Delegated Decision
Postcode
NG1 4HH

Timeline

Dates from the published record

  1. 28 Mar 2024

    Received by Nottingham

  2. 19 Dec 2024

    Decision issued: Grant conditional permission

  3. 4 Sep 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, a design practice registered in Hounslow

100 applications on PlanIndex · across 17 councils · 83% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 6 Forest Road East Nottingham Nottingham City NG1 4HH

    24/00533/LLIS1 Submitted 28 Mar 2024 2m away

    Installation of rooflight in rear roof slope, boiler flue in side elevation and internal alterations

    Granted Heritage and listed buildings Loft or dormer 6 docs
  • 6 Forest Road East Nottingham Nottingham City NG1 4HH

    26/00486/PFUL3 Submitted 27 Mar 2026 3m away

    Change of use from dwelling (Use Class C3) to Children's Care Home (Use Class C2) for the care of up to 4 Children (aged 8-17)

    Refused Full applications 11 docs
    Domestic
  • 18 Forest Road East Nottingham Nottingham City NG1 4HH

    23/00041/PWC Submitted 9 Jan 2023 39m away

    Works: T1 Corsican Pine: Fell to ground level - replant with species to be decided Justification: The tree has massively outgrown location and causing a nuisance, severe cracking and lifting of surrounding paved area.

    Granted Trees 3 docs
  • 69 Forest Road East Nottingham NG1 4JE

    24/01953/LLIS1 Submitted 8 Nov 2024 109m away

    Shop front reinstatement and internal alterations

    Granted Heritage and listed buildings Windows or glazing 9 docs
  • 69 Forest Road East Nottingham NG1 4JE

    24/01955/PCLO Submitted 8 Nov 2024 109m away

    96% historically approved · decision due ~7 Feb

    Change of use to 6 Bed Co-operative Class C3 (c ) (Retrospective).

    Awaiting decision Lawful development 5 docs
  • Nottingham High School For Boys Waverley Mount Nottingham Nottingham City NG7 4ED

    26/00977/PWC Submitted 9 Jun 2026 136m away

    94% historically approved · decision due ~4 Aug

    Nottingham High School Site T0003 - Reduce lateral limbs in contact with building to create 1.5 metres clearance Timescale: 02-Apr-2027 (1 Year) Species - Ash T0012 - Re pollard tree leaving initial pollard points or knuckles intact works required as continuation of pollard regime. Timescale: 02-Apr-2027 (1 Year) Species - London Plane T0018 - Crown clean to remove canopy deadwood over 20mm and reduce South west lateral canopy by 2.5 metres to suitable replacement points leaving a natural canopy outline Timescale: 02-Apr-2027 (1 Year) Species - beech T0020 - Reduce lateral canopy by no more than 2.5 metres to suitable replacement points leaving a natural canopy outline to reduce the likelihood of limb failure via wind breakage. Timescale: 02-Apr-2027 (1 Year) Species - Copper Beech T0038 - Prune away from street light to create 1 metres clearance Timescale: 02-Apr-2027 (1 Year) Species - Robinia T0040 - Pollard to same height as adjoining stem to avoid the Likelihood of structural limb failure Timescale: 02-Apr-2027 (1 Year) Species - sycamore 12 Waverley Site T008 - Reduce Northern and Eastern lateral canopy by no more than 2.5 metres to suitable replacement points leaving a natural canopy outline works required to reduce the likelihood of limb failure via wind breakage. Timescale: 02-Apr-2027 (1 Year) Species - Norway Maple Lovell House Site T11 - Pollard tree to 6 metres in height to reduce the likelihood of structural limb failure from coppice point. Timescale: 02-Apr-2027 (1 Year) Species - Lime T14 - Pollard to 5 metres in height Timescale: 02-Apr-2027 (1 Year) Species - Lime T16 - Pollard to 5 metres in height Timescale: 02-Apr-2027 (1 Year) Species - Sycamore T28 - Crown lift to highway aspect only to create 5 metres clearance from level of highway Timescale: 02-Apr-2027 (1 Year) Species - Lime T8 - Overall canopy reduction by no more than 1.5 metres to suitable replacement points leaving a natural canopy outline works required to reduce the likelihood of

    Decided Trees 4 docs

In Nottingham

  • 26/00125/PFUL3 Withdrawn

    Five Acres Hempshill Lane Nottingham Nottingham City NG6 8PF

    Conversion of garage to granny room

    26 Jan 2026 Full applications
  • 26/00468/PFUL3 Granted

    126 Morley Avenue Nottingham Nottingham City NG3 5FW

    Conversion of 126 Morley Avenue to a three bedroom dwelling with one off road parking space

    25 Mar 2026 Full applications
  • 26/00124/PFUL3 Granted

    36 Jersey Gardens Nottingham Nottingham City NG3 2QP

    Garage conversion together with a single storey side and rear extension forming storage and home office accommodation

    26 Jan 2026 Full applications
  • 26/00612/PFUL3 Granted

    The Futurist Valley Road Nottingham Nottingham City NG5 1JE

    Change of use to B2 use (General Industrial) and MOT tests

    20 Apr 2026 Full applications
  • 26/00494/PFUL3 Granted

    31 Wollaton Hall Drive Nottingham Nottingham City NG8 1AF

    Two-storey extensions to the front, side, and rear, alterations to the roof including front and rear dormers, creation of first-floor front terrace above a single-storey projection, removal of chimney sticks and fenestration changes to all elevations.

    30 Mar 2026 Full applications