Planning application
4C Park Valley Nottingham Nottingham City NG7 1BQ
Works: Extension Windows or glazing
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
New windows to ground floor and new front door. Reconfiguration of entrance area and infill ground floor extension.
As published by the council, reference 22/02490/PFUL3
Application record
- Reference
- 22/02490/PFUL3
- Type
- Full planning application
- Status
- Decided
- Decision
- Grant conditional permission
- Received
- 23 Dec 2022
- Validated
- 23 Dec 2022
- Decided
- 1 Mar 2023
- Ward
- Castle (May 2019)
- Decision by
- Delegated Decision
- Postcode
- NG7 1BQ
Timeline
Dates from the published record
-
23 Dec 2022
Received by Nottingham
-
1 Mar 2023
Decision issued: Grant conditional permission
-
25 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, an architecture practice registered in Nottingham
44 applications on PlanIndex · across 13 councils · 94% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
7 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Royal Standard House Standard Hill Nottingham Nottingham City NG1 6FX
96% historically approved · decision due ~16 Apr
T1 Acer Pseudoplatanus, insufficient rooting area with a poor quality soil substrate contributing to a reduced overall lifespan coupled with a decreased ability to withstand biotic and abiotic factors. T1 Shows an unfavourable safety of 1.29, accepted calculated safety factor is 1.5. To increase the Safety factor to the 1.5 will require a reduction of a minimum of 2m (8% reduction in height), however with the previously passed cyclical lateral reduction to ensure 1.5m of clearance from the building there is the high likelihood that the combined reduced canopy area will severly compromise the trees health. T2 Acer Pseudoplatanus, insufficient rooting area with a poor quality soil substrate contributing to a reduced overall lifespan coupled with a decreased ability to withstand biotic and abiotic factors. T2 Shows an unfavourable safety of 0.9, accepted calculated safety factor is 1.5. The level of height reduction required to increase the safety factor to 1.5 would require a 4m height reduction, resulting in a significant loss of photosynthetic area and would compromise the tree's health severely. T002 has a non-tolerable risk level when utilising The VALID methodology of Tree risk/benefit and a Tolerable by Agreement risk level if using QTRA. As we cannot impart an "agreement" with passing vehicles or pedestrians this risk level must be downgraded to "risk will not ordinarily be tolerable".
Awaiting decision Trees 3 docs -
Royal Standard House Standard Hill Nottingham Nottingham City NG1 6FX
Removal of 4 Sycamore trees T4-T7 along the southern slope, so far one tree is showing signs of decline caused Cryptostroma corticale and given the proximity to each other and the limited soil volume, infection and death of all the maple species along this line is highly probable. Given the brittle nature of timber in trees that have died from this and the negative effects on the health of workers exposed to the spores of this disease, it is recommended that they be removed during the wetter winter months.
Granted Trees 3 docs -
Arundel House 1 Park Valley Nottingham
Remove failed limb from fractured willow tree, pollard or fell remaining stem.
Decided Trees 2 docs -
6 Castle Grove Nottingham Nottingham City NG7 1DN
Repair/reconstruction of the boundary wall.
Granted Full applications 4 docsSmall domestic -
6 Castle Grove Nottingham NG7 1DN
Conversion of basement into habitable room (retrospective)
Granted Heritage and listed buildings 4 docs -
3 Lenton Road Nottingham NG7 1DP
5 day notice. Removal or monolith of poplar with cracked stem.
Decided 1 doc
Other full applications applications
In Nottingham
-
26/00125/PFUL3 Withdrawn
Five Acres Hempshill Lane Nottingham Nottingham City NG6 8PF
Conversion of garage to granny room
-
26/00468/PFUL3 Granted
126 Morley Avenue Nottingham Nottingham City NG3 5FW
Conversion of 126 Morley Avenue to a three bedroom dwelling with one off road parking space
-
26/00124/PFUL3 Granted
36 Jersey Gardens Nottingham Nottingham City NG3 2QP
Garage conversion together with a single storey side and rear extension forming storage and home office accommodation
-
26/00612/PFUL3 Granted
The Futurist Valley Road Nottingham Nottingham City NG5 1JE
Change of use to B2 use (General Industrial) and MOT tests
-
26/00494/PFUL3 Granted
31 Wollaton Hall Drive Nottingham Nottingham City NG8 1AF
Two-storey extensions to the front, side, and rear, alterations to the roof including front and rear dormers, creation of first-floor front terrace above a single-storey projection, removal of chimney sticks and fenestration changes to all elevations.