Planning application
The Boots Co Plc Thane Road Nottingham NG2 3AA
Works: Trees
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Details submitted to discharge conditions 5 (Gas contamination), 6 (Ground contamination), 8 (Noise and sound insulation), 11 (FRA addendum), 12 (Parcel FRA), 13 (Drainage strategy), 14 (Drainage system), 15 (Green infrastructure), 16 (Construction environmental management plan), 18 (Ecological mitigation strategy), 19 (Trees), 20 (Reptile survey), 21 (Great crested newts), 22 (Energy/sustainability), 23 (hard surface treatment), 30 (Public open space design), 31 (Public landscaping), 36 (Parking), 37 (Refuse/cycle facilities) and 38 (Bat/bird boxes) of planning permission reference 14/02038/POUT
As published by the council, reference 21/01748/PDS4
Application record
- Reference
- 21/01748/PDS4
- Type
- Discharge of conditions
- Status
- Decided
- Decision
- Approve
- Received
- 5 Aug 2021
- Validated
- 5 Aug 2021
- Decided
- 6 Jun 2023
- Ward
- Lenton And Wollaton East (May 2019)
- Decision by
- Delegated Decision
- Postcode
- NG2 3AA
Site history
Applications at this address on the Nottingham register
This site has had 3 applications since 2021: 3 approved, 0 refused.
-
25/00823/PNMA Granted
The Boots Co Plc Thane Road Nottingham NG2 3AA
Non-material amendment to planning permission 21/01729/PRES4 to amend plots 437 to 454
-
21/01896/PDS4 Granted
The Boots Co Plc Thane Road Nottingham NG2 3AA
Discharge of condition 17 (Environmental management plan) of planning permission reference 14/02038/POUT
Timeline
Dates from the published record
-
5 Aug 2021
Received by Nottingham
-
6 Jun 2023
Decision issued: Approve
-
22 Jul 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
41 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Nottingham granted permission on 6 June 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Boots Campus, D90 East Building Thane Road Nottingham Nottingham City NG90 1BS
94% historically approved · decision due ~2 Nov
The construction of a new substation to service D90 East Building on the Boots Site, adjacent to the building.
Awaiting decision -
Boots Campus, D90 Building Head Office Thane Road Nottingham Nottingham City NG90 1BS
97% historically approved · decision due ~29 Aug
Fire door replacement / remedial work at D90 West Building.
Awaiting decision Heritage and listed buildings 8 docs -
The Boots Co Plc Thane Road Nottingham Nottingham City NG2 3AA
Details submitted to discharge conditions 4 (phasing plan), 7 (materials management plan), 10 (noise - piling) and 24 (construction parking management plan) of planning permission 14/02038/POUT.
Granted Conditions 6 docs -
The Boots Co Plc Thane Road Nottingham NG2 3AA
Discharge of condition 17 (Environmental management plan) of planning permission reference 14/02038/POUT
Granted Conditions 1 doc -
The Boots Co Plc Thane Road Nottingham Nottingham City NG2 3AA
Application for approval of reserved matters b (external materials) and c (cross sections through site showing finished floor levels) for residential development of 14/02038/POUT
Granted Reserved matters New dwelling 22 docs -
Reckitt Benckiser Thane Road Nottingham NG90 2DB
Construction of a waste recycling yard
Granted Full applications 7 docs
Other condition discharge and variation applications
In Nottingham
-
26/00801/PDS4 Granted
Bilborough College College Way Strelley Nottinghamshire NG8 4DQ
Details submitted to discharge conditions 3 (Biodiversity Gain Plan) and 4 (HMMP) of planning permission 25/02127/PFUL3.
-
26/00574/PDS4 Granted
5-7 Roden Street Nottingham Nottingham City NG3 1JH
Details submitted to discharge condition 2 (ecological enhancements) of planning permission 23/02035/PFUL3.
-
26/00121/PDS4 Granted
Site Of Chronos Richardson Ltd Arnside Road Nottingham
Details submitted to discharge conditions 2 (BNG Gain Plan), 3 (HMMP), 4 (remediation), 5 (surface water drainage during construction), 6 (noise and dust management), 7 (CTMP), 8 (materials), 9 (boundary treatments), 10 (renewables), 11 (cycle Storage), 12 (badgers), 13 (bats), 17 (landscaping), 18 (ecological enhancements), 21 (Air Quality), and 25 (piling) of planning permission 25/00059/PFUL3.
-
26/00118/PDS4 Granted
3 Gaul Street Nottingham Nottingham City NG6 8HR
Details submitted to discharge condition 2 (materials) and 3 (boundary treatments and bin storage) of planning permission reference 23/00850/PFUL3
-
21/02048/PDS4 Decided
Retail Unit Corner Of Berridge And Leslie Roads Nottingham NG7 6HT
Discharge of conditions 2 (external layout), 3 (cycle parking, electric vehicle charging scheme, bollards) and 4 (deliveries and car parking management plan) of planning permission reference 20/02497/PFUL3