Skip to content
PlanIndex Get alerts
Menu

Planning application

Telecommunications Mast South East Of Building D114 The Boots Co Plc Thane Road Nottingham NG2 3AA

Granted Nottingham 21/01644/PFUL3 Full planning application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

The proposed upgrade of an existing base station consisting of the replacement of a 15m monopole with a 20m lattice tower supporting 12 no antenna, on an open headframe, 6 no dishes, addition of 1 no cabinet, 1 no meter cabinet with ancillary development thereto.

As published by the council, reference 21/01644/PFUL3

Application record

Reference
21/01644/PFUL3
Type
Full planning application
Status
Decided
Decision
Granted As published: Grant conditional permission
Received
22 Jul 2021
Validated
22 Jul 2021
Decided
24 Sep 2021
Ward
Lenton And Wollaton East (May 2019)
Decision by
Delegated Decision
Postcode
NG2 3AA

Timeline

Dates from the published record

  1. 22 Jul 2021

    Received by Nottingham

  2. 24 Sep 2021

    Decision issued: Grant conditional permission

  3. 18 Sep 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

WHP Telecoms Ltd Agent, a telecoms contractor registered in Warrington

Active · incorporated 1998 · Warrington

1,438 applications on PlanIndex · across 192 councils · 67% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

18 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Nottingham granted permission on 24 September 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Boots Campus, D90 East Building Thane Road Nottingham Nottingham City NG90 1BS

    26/01585/PFUL3 Submitted 7 Sep 2026 300 yards away

    94% historically approved · decision due ~2 Nov

    The construction of a new substation to service D90 East Building on the Boots Site, adjacent to the building.

    Awaiting decision
  • Boots Campus, D90 Building Head Office Thane Road Nottingham Nottingham City NG90 1BS

    24/01133/LLIS1 Submitted 4 Jul 2024 300 yards away

    95% historically approved · decision due ~29 Aug

    Fire door replacement / remedial work at D90 West Building.

    Awaiting decision Heritage and listed buildings 8 docs
  • The Boots Co Plc Thane Road Nottingham NG2 3AA

    21/01748/PDS4 Submitted 5 Aug 2021 350 yards away

    Details submitted to discharge conditions 5 (Gas contamination), 6 (Ground contamination), 8 (Noise and sound insulation), 11 (FRA addendum), 12 (Parcel FRA), 13 (Drainage strategy), 14 (Drainage system), 15 (Green infrastructure), 16 (Construction environmental management plan), 18 (Ecological mitigation strategy), 19 (Trees), 20 (Reptile survey), 21 (Great crested newts), 22 (Energy/sustainability), 23 (hard surface treatment), 30 (Public open space design), 31 (Public landscaping), 36 (Parking), 37 (Refuse/cycle facilities) and 38 (Bat/bird boxes) of planning permission reference 14/02038/POUT

    Granted Conditions Trees 41 docs
  • Aalco Nottingham Harrimans Lane Nottingham Nottingham City NG7 2SD

    23/01999/PFUL3 Submitted 28 Nov 2023 350 yards away

    Removal of the existing two storey office building and proposed erection of a three storey replacement office and welfare facilities building (Revised Flood Risk Assessment Received 20/03/2024)

    Granted Full applications 13 docs
  • Aalco Nottingham Harrimans Lane Nottingham Nottingham City NG7 2SD

    24/01139/PFUL3 Submitted 8 Jul 2024 400 yards away

    Removal of the existing two storey office building and proposed erection of a three storey replacement office and welfare facilities Building

    Granted Full applications 13 docs
  • Site Of Horizon Factory And Land Northeast Of Gas Governor Thane Road Nottingham

    22/01502/PFUL3 Submitted 29 Jul 2022 0.3 miles away

    Erection of 2no. sprinkler tanks with associated pump house adjacent to Unit 1 of approved development ref: 21/02279/PRES4

    Granted Full applications 4 docs

In Nottingham

  • 26/01541/PFUL3 Awaiting decision

    Land West Of 6 And 8 Lawrence Drive Nottingham

    Large scale Warehouse (Use Classes B2/B8/E(g)(iii)) and associated landscaping, car parking, electricity substation and other infrastructure /engineering works.

    Received 28 Aug, published by the council 22 Sep 2026 Full applications
  • 26/01529/PFUL3 Awaiting decision

    Plumptre House Muskham Street Nottingham Nottingham City NG2 2HB

    Change of use from three flats into 6no. one bedroom flats including demolition of existing garage

    Received 25 Aug, published by the council 22 Sep 2026 Full applications
  • 26/01526/PFUL3 Awaiting decision

    51 Howick Drive Nottingham Nottingham City NG6 7FQ

    This Project involves erecting a single storey rear and side wrap around extension.

    Received 25 Aug, published by the council 27 Aug 2026 Full applications
  • 26/01504/PFUL3 Awaiting decision

    20 Cheviot Drive Nottingham Nottingham City NG6 7FH

    Construction of single storey side extension & rear pergola along with associated alterations

    Received 24 Aug, published by the council 22 Sep 2026 Full applications
  • 26/01492/PFUL3 Awaiting decision

    Shell For 412 - 414 And Flat Over 414 Broxtowe Lane Nottingham Nottingham City NG8 5ND

    Creation of 3 additional flats

    Received 21 Aug, published by the council 26 Aug 2026 Full applications