Skip to content
PlanIndex Get alerts
Menu

Planning application

11 Peveril Drive Nottingham NG7 1DE

Granted Nottingham 19/02399/PFUL3 Full planning application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Proposed erection of a slatted screen above the garden boundary wall

As published by the council, reference 19/02399/PFUL3

Application record

Reference
19/02399/PFUL3
Type
Full planning application
Status
Decided
Decision
Grant conditional permission
Received
25 Oct 2019
Validated
31 Oct 2019
Decided
16 Dec 2019
Ward
Castle (May 2019)
Decision by
Delegated Decision
Postcode
NG7 1DE

Timeline

Dates from the published record

  1. 25 Oct 2019

    Received by Nottingham

  2. 31 Oct 2019

    Validated

    Checked as complete and ready for consideration.

  3. 16 Dec 2019

    Decision issued: Grant conditional permission

  4. 25 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 11 Peveril Drive Nottingham NG7 1DE

    24/01651/PTPO Submitted 6 Sep 2024 2m away

    T1 - 3x London Plane's - reduction of overhang to boundary by up to 3m

    Refused Trees 2 docs
  • Peveril House Peveril Drive Nottingham NG7 1DE

    19/02364/PWC Submitted 21 Oct 2019 20m away

    Crown lift Beech tree to give a clearance of 2.5m over the footpath and 5.2m over the road, and remove small tree impacting on wall.

    Granted Trees 4 docs
  • 7A Lenton Road Nottingham Nottingham City NG7 1DP

    24/01351/PTPO Submitted 7 Aug 2024 42m away

    Please see attached specification of works as recommended by a previously conducted tree survey. All works are to be carried out accordingly. Permission has been granted for some of these works already, please see attached documents.

    Granted Trees
  • 7A Lenton Road Nottingham NG7 1DP

    21/01255/PTPO Submitted 9 Jun 2021 46m away

    Tree works in Symbiosis Survey.

    Granted Trees 4 docs
  • 7A Lenton Road Nottingham NG7 1DP

    23/00337/PWC Submitted 9 Feb 2023 47m away

    96% historically approved · decision due ~17 Apr

    All priority 1 and 2 works as recommended by Symbiosis Consulting. Most works covered by general consent 16/02039/PTPO Trees with works not covered by general consent: CV1, CV2, CV3, CV4, CV5,

    Awaiting decision Trees 3 docs
  • 2 Kenilworth Road Nottingham Nottingham City NG7 1DD

    26/01024/PWC Submitted 17 Jun 2026 47m away

    94% historically approved · decision due ~15 Oct

    Tree 1 - Walnut Species: Walnut (Juglans regia) Recommended works: Crown reduction by approximately one-third of the overall canopy, while retaining a natural and balanced crown structure. Reduce limbs extending over the garage roof to provide suitable clearance. Undertake a crown lift to provide additional clearance beneath the canopy. Reason for works: The proposed works are intended to manage the overall size and spread of the tree, reduce end weight, maintain suitable clearance from the garage roof and improve the overall structure and balance of the crown. The works will be carried out sympathetically to retain the trees health, natural form and visual amenity. Tree 2 - Yew Species: Yew (Taxus baccata) Recommended works: Crown reduction of approximately 1.5 - 2 metres throughout the canopy, maintaining a balanced and natural shape. Reason for works: The proposed reduction is intended to manage the overall size and spread of the tree, reduce end weight and maintain a balanced canopy appropriate to its surroundings. The works will be undertaken sympathetically, retaining the trees health, structure and visual amenity.

    Awaiting decision Trees 2 docs

In Nottingham

  • 26/00125/PFUL3 Withdrawn

    Five Acres Hempshill Lane Nottingham Nottingham City NG6 8PF

    Conversion of garage to granny room

    26 Jan 2026 Full applications
  • 26/00468/PFUL3 Granted

    126 Morley Avenue Nottingham Nottingham City NG3 5FW

    Conversion of 126 Morley Avenue to a three bedroom dwelling with one off road parking space

    25 Mar 2026 Full applications
  • 26/00124/PFUL3 Granted

    36 Jersey Gardens Nottingham Nottingham City NG3 2QP

    Garage conversion together with a single storey side and rear extension forming storage and home office accommodation

    26 Jan 2026 Full applications
  • 26/00612/PFUL3 Granted

    The Futurist Valley Road Nottingham Nottingham City NG5 1JE

    Change of use to B2 use (General Industrial) and MOT tests

    20 Apr 2026 Full applications
  • 26/00494/PFUL3 Granted

    31 Wollaton Hall Drive Nottingham Nottingham City NG8 1AF

    Two-storey extensions to the front, side, and rear, alterations to the roof including front and rear dormers, creation of first-floor front terrace above a single-storey projection, removal of chimney sticks and fenestration changes to all elevations.

    30 Mar 2026 Full applications