Skip to content
PlanIndex Get alerts
Menu

Planning application

29 Coslany Street Norwich NR3 3DT

Granted Norwich 21/00442/F Full

Works: Loft or dormer Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Loft conversion with 2No. velux windows to front roof and 2No. velux cabrio's to rear roof.

As published by the council, reference 21/00442/F

Application record

Reference
21/00442/F
Type
Full
Status
Decided
Decision
Approved
Received
23 Mar 2021
Validated
23 Mar 2021
Decided
17 May 2021
Ward
Mancroft
Decision by
Delegated Decision
Postcode
NR3 3DT

Timeline

Dates from the published record

  1. 23 Mar 2021

    Received by Norwich

  2. 17 May 2021

    Decision issued: Approved

  3. 9 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, a design practice

17 applications on PlanIndex · across 3 councils · 100% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

9 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 9 Coslany Street Norwich NR3 3DT

    26/00617/TCA Submitted 22 Jun 2026 36m away

    91% historically approved · decision due ~17 Aug

    Cherry tree: Reduce height from 5.5m to 4.3m. Reduce spread from 5.5m to 4.3m.

    Decided Trees 3 docs
  • 4 Dyers Yard Norwich NR3 3QY

    21/00444/TCA Submitted 24 Mar 2021 40m away

    T1 Prunus sp: Height 8m- crown spread 6m- 1-2m reduction in height and crown thin by 10%.

    Decided Trees 3 docs
  • 20 Dyers Yard Norwich NR3 3QY

    19/01688/TCA Submitted 29 Nov 2019 42m away

    Rowan (T1): remove a single central branch to reduce density of crown, remove lower branches and crown lift to 2.1m.

    Decided Trees 5 docs
  • 25 Dyers Yard Norwich NR3 3QY

    19/01689/TCA Submitted 29 Nov 2019 44m away

    Rowan (T1): crown reduction as per photograph and removal of lower branches under 2.1m.

    Decided Trees 5 docs
  • 18 Dyers Yard Norwich NR3 3QY

    19/01577/TCA Submitted 6 Nov 2019 50m away

    Rowan (T1): Fell and re-plant with a Rowan.

    Decided Trees 3 docs
  • 9 Coslany Street Norwich NR3 3DT

    20/01040/TCA Submitted 3 Sep 2020 56m away

    Silver Birch (T1): cut back from gutters with crossing branches removed, tallest leading limbs from last topping to be thinned with branches from gutters reduced back by 1-2m and top of crown thinned by 2-3m. Cherry Tree (T2): reduce brances overhanging roadside back, 2 large branches heading toward house cut back 2-3 meters from house leaving them roughly 2m long.

    Decided Trees

In Norwich

  • 26/00868/F Awaiting decision

    Pivotal House 5 Orford Yard Red Lion Street Norwich NR1 3TB

    Creating two dormers in existing hip-to-gable roof.

    2 Sep 2026 Full applications
  • 26/00869/F Awaiting decision

    Rear Of 64 - 66 Westwick Street Norwich NR2 4SZ

    Erecting a veranda at the rear of building to create a wellbeing centre.

    2 Sep 2026 Full applications
  • 26/00837/F Awaiting decision

    39 - 41 West End Street Norwich NR2 4NA

    Change of use to managers/staff accommodation, to include external alterations, new doors/windows if required.

    25 Aug 2026 Full applications
  • 26/00830/F Awaiting decision

    10 Thomas Wyatt Close Norwich NR2 2TB

    Air source heat pump and acoustic enclosure in rear garden.

    24 Aug 2026 Full applications
  • 26/00825/F Awaiting decision

    The Assembly House Theatre Street Norwich NR2 1RQ

    Creating a new entrance to the Undercroft bedroom suite from the east courtyard; installing a new cladding screen to the undercroft entrance and the elevations of Rooms 3 and 4; adjusting the boundary treatment along The Chantry with associated resurfacing; installing a new vehicular and pedestrian gate, car port and laundry room along The Chantry; installation of 5no. new air conditioning units.

    20 Aug 2026 Full applications