Planning application
11 Elveden Close Norwich NR4 6AS
Works: Extension Loft or dormer Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Single storey front and rear extensions and alterations to existing dormers.
As published by the council, reference 19/01551/F
Application record
- Reference
- 19/01551/F
- Type
- Full
- Status
- Decided
- Decision
- Approved
- Received
- 4 Nov 2019
- Validated
- 4 Nov 2019
- Decided
- 20 Dec 2019
- Ward
- Eaton
- Decision by
- Delegated Decision
- Postcode
- NR4 6AS
Timeline
Dates from the published record
-
4 Nov 2019
Received by Norwich
-
20 Dec 2019
Decision issued: Approved
-
18 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, an architecture practice registered in Norwich
112 applications on PlanIndex · across 7 councils · 95% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
11 Elveden Close Norwich NR4 6AS
Amendment of previous application 19/01551/F to allow a change the colour and materials of windows and doors.
Granted Amendments Windows or glazing -
Eaton War Memorial Newmarket Road Norwich
Repairs to war memorial.
Withdrawn Heritage and listed buildings -
-
Verge Opposite 1 Elveden Close Norwich NR4 6AS
T1 - Cherry: Works as per information sheet received 23.12.21
Decided Trees -
-
Other full applications applications
In Norwich
-
26/00868/F Awaiting decision
Pivotal House 5 Orford Yard Red Lion Street Norwich NR1 3TB
Creating two dormers in existing hip-to-gable roof.
-
26/00869/F Awaiting decision
Rear Of 64 - 66 Westwick Street Norwich NR2 4SZ
Erecting a veranda at the rear of building to create a wellbeing centre.
-
26/00837/F Awaiting decision
39 - 41 West End Street Norwich NR2 4NA
Change of use to managers/staff accommodation, to include external alterations, new doors/windows if required.
-
26/00830/F Awaiting decision
10 Thomas Wyatt Close Norwich NR2 2TB
Air source heat pump and acoustic enclosure in rear garden.
-
26/00825/F Awaiting decision
The Assembly House Theatre Street Norwich NR2 1RQ
Creating a new entrance to the Undercroft bedroom suite from the east courtyard; installing a new cladding screen to the undercroft entrance and the elevations of Rooms 3 and 4; adjusting the boundary treatment along The Chantry with associated resurfacing; installing a new vehicular and pedestrian gate, car port and laundry room along The Chantry; installation of 5no. new air conditioning units.