Planning application
Berwick Academy Adams Drive Spittal Northumberland TD15 2JF
Works: Demolition
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Demolition of existing school buildings and the erection of new school buildings, and associated external works including access and landscaping.
As published by the council, reference 26/01938/CCD
Application record
- Reference
- 26/01938/CCD
- Status
- Permitted
- Decision
- Granted As published: Permitted
- Received
- 3 Jun 2026
- Validated
- 9 Jun 2026
- Decided
- 16 Oct 2026
- Ward
- Berwick East
- Parish
- Berwick-upon-Tweed
- Decision by
- Delegated Decision
- Postcode
- TD15 2JF
Timeline
Dates from the published record
-
3 Jun 2026
Received by Northumberland
-
9 Jun 2026
Validated
Checked as complete and ready for consideration.
-
9 Aug 2026
Added to PlanIndex
-
16 Oct 2026
Decision issued: Permitted
-
16 Oct 2026
Status changed to Permitted
Previously Registered.
Documents
Plans, drawings, consultee responses and the officer's report
186 documents on file for this application
- PLANNING STATEMENT - NATIONAL STANDARDS FOR SUDS
- ENVIRONMENTAL MANAGEMENT PLAN V01
- CONSTRUCTION METHOD STATEMENT R2
- ATTENUATION TANK DETAILS
- DRAINAGE GA - SHEET 4
- DRAINAGE GA - SHEET 3
- DRAINAGE GA - SHEET 2
- DRAINAGE GA - SHEET 1
- DRAINAGE GA - OVERALL
- DRAINAGE GA - VIEWPORT LOCATIONS
- STAGE 4 MODEL - SURFACE WATER CALCULATIONS
- NS2 MANAGEMENT OF EVERYDAY RAINFALL PLAN
- BGP RE LLFA COMMENTS
- LANDSCAPE AND EXTERNAL SPORTS PROVISION EVIDENCE NOTE
- AGENT RESPONSE TO SPORT ENGLAND
- HIGHWAYS
- 88 MIDDLE STREET
- SPORT ENGLAND
- LLFA
- 7 OSBORNE ROAD
- AGENT RE LLFA
- FLOOD EXCEEDANCE PLAN
- STAGE 4 MODEL - SURFACE WATER CALCULATIONS
- LLFA
- SITE SECTIONS SHEET 1
- SITE SECTIONS SHEET 2
- SITE SECTIONS SHEET 3
- APPLICATION FORM
- DRAINAGE IMPERMEABLE AREAS PLAN
- DRAINAGE MANHOLE SCHEDULE - CATCHPIT MANHOLES
- DRAINAGE MANHOLE SCHEDULE - SURFACE WATER
- FLOOD EXCEEDANCE PLAN
- DRAINAGE GA - SHEET 4
- DRAINAGE GA - SHEET 3
- DRAINAGE GA - SHEET 2
- DRAINAGE GA - SHEET 1
- DRAINAGE GA - OVERALL
- DRAINAGE GA - VIEWPORT LOCATIONS
- DRAINAGE 2026.08.10 STAGE 4 MODEL - SURFACE WATER CALCULATIONS - 7.2LS DISCHARGE
- DRAINAGE 2026.07.23 GREENFIELD RUNOFF RATE ESTIMATION
- ECOLOGY
- TOWN COUNCIL
- SOILS PLAN
- PLANTING STRATEGY
- SITE DEMOLITION AND REMODELLING PLAN
- TREE RETENTION PROTECTION AND REMOVAL
- EXTERNAL SPORTS PROVISION
- EXTERNAL CIRCULATION STRATEGY
- EXTERNAL ACCESS & SECURITY STRATEGY
- LANDSCAPE GENERAL ARRANGMENT SHEET 8
- LANDSCAPE GENERAL ARRANGMENT SHEET 7
- LANDSCAPE GENERAL ARRANGMENT SHEET 6
- LANDSCAPE GENERAL ARRANGMENT SHEET 5
- LANDSCAPE GENERAL ARRANGMENT SHEET 4
- LANDSCAPE GENERAL ARRANGMENT SHEET 3
- LANDSCAPE GENERAL ARRANGMENT SHEET 2
- LANDSCAPE GENERAL ARRANGMENT SHEET 1
- SITE LANDSCAPE PLAN SOUTH
- SITE LANDSCAPE PLAN NORTH
- WHOLE SITE PLAN
- EXISTING WHOLE SITE PLAN
- SITE LOCATION PLAN
- MANHOLE SCHEDULE - FOUL WATER.
- MANHOLE SCHEDULE - SURFACE WATER
- DRAINAGE GA - SHEET 4
- DRAINAGE GA - SHEET 3
- DRAINAGE GA - SHEET 2
- DRAINAGE GA - SHEET 1
- DRAINAGE GA - OVERALL
- DRAINAGE GA - VIEWPORT LOCATIONS
- ECOLOGICAL IMPACT ASSESSMENT & BAT SURVEY R05
- LLFA
- LLFA
- TECHNICAL RESPONSE (HIGHWAYS)
- TRAVEL PLAN
- SPORTS ENGLAND RESPONSE
- AGENT RE LLFA COMMENTS
- IMPERMEABLE AREAS PLAN
- RAIN GARDEN DETAILS
- ORIFICE CONTROL CHAMBER DETAILS
- ATTENUATION TANK DETAILS
- PETROL INTERCEPTOR DETAILS
- FLOW CONTROL MANHOLE
- DRAINAGE CONSTRUCTION DETAILS - SHEET 2
- DRAINAGE CONSTRUCTION DETAILS - SHEET 1
- FLOOD EXCEEDANCE PLAN
- GREENFIELD RUNOFF RATE ESTIMATION
- NWL PRE-PLANNING ADVICE
- HIGHWAYS
- BUILT HERITAGE AND DESIGN
- PUBLIC PROTECTION
- PLANNING STATEMENT
- ECIA & BAT SURVEY R04
- MINERAL SAFEGUARDING ASSESSMENT
- TRANSPORT ASSESSMENT
- TRAVEL PLAN
- LANDSCAPE AND VISUAL APPRAISAL
- LVA APPENDIX 1 METHODOLOGY
- LVA APPENDIX 2 FIGURES
- LVA APPENDIX 3 VISUALISATIONS
- LVA APPENDIX 4 LANDSCAPE PLAN
- SUDS MAINTENANCE PLAN
- FLOOD EXCEEDANCE PLAN
- DRAINAGE GA - OVERALL
- DRAINAGE GA - SHEET 1
- DRAINAGE GA - SHEET 2
- DRAINAGE GA - SHEET 3
- DRAINAGE GA - SHEET 4
- DRAINAGE GA - VIEWPORT LOCATIONS
- EXTERNAL WORKS GA - OVERALL
- EXTERNAL WORKS GA - SHEET 1
- EXTERNAL WORKS GA - SHEET 2
- EXTERNAL WORKS GA - SHEET 3
- EXTERNAL WORKS GA - SHEET 4
- EXTERNAL WORKS GA - VIEWPORT LOCATIONS
- SUDS MANAGEMENT PLAN
- DRAINAGE PHILOSOPHY
- BERWICK CIVIC SOCIETY
- ECOLOGY
- LLFA
- SPORT ENGLAND
- SPORT ENGLAND RESPONSE
- BUILT HERITAGE & DESIGN
- ARCHAEOLOGY
- EDUCATION
- COAL AUTHORITY
- NORTHUMBERLAND FIRE AND RESCUE SERVICE
- NORTHUMBRIAN WATER
- NORTHUMBRIA POLICE
- 94 QUEEN STREET
- 94 QUEEN STREET
- HIGHWAYS
- PUBLIC RIGHTS OF WAY
- ECOLOGICAL IMPACT ASSESSMENT AND BAT SURVEY R03
- STATEMENT OF COMMUNITY INVOLVEMENT
- BIODIVERSITY NET GAIN ASSESSMENT R02
- GA ELEVATIONS MAIN BUILDING
- ARCHAEOLOGICAL ASSESSMENT
- HEALTHY PLANNING CHECKLIST
- FLOOD RISK ASSESSMENT
- DRAINAGE PHILOSOPHY
- PHASE 1: DESK STUDY
- APPLICATION FORM REDACTED
- ENERGY STATEMENT
- SPORTS BLOCK - VENTILATION STRATEGY
- LEVEL 02 MAIN BUILDING - VENTILATION STRATEGY
- SEMH BLOCK - VENTILATION STRATEGY
- LEVEL 00 MAIN BUILDING - VENTILATION STRATEGY
- LEVEL 01 MAIN BUILDING - VENTILATION STRATEGY
- ARBORICULTURAL REPORT
- DESIGN AND ACCESS STATEMENT BERWICK ACADEMY
- GA ELEVATIONS SEMH BUILDING
- GA SECTIONS SEMH BUILDING
- MAIN BUILDING GA LEVEL 00 PLANNING
- MAIN BUILDING GA LEVEL 01 PLANNING
- MAIN BUILDING GA LEVEL 02 PLANNING
- MAIN BUILDING GA ROOF
- GA SECTIONS MAIN BUILDING
- GA SEMH PLANNING
- GA PLAN ROOF SEMH BUILDING
- SITE LOCATION PLAN
- EXISTING WHOLE SITE PLAN
- WHOLE SITE PLAN
- SITE LANDSCAPE PLAN NORTH
- SITE LANDSCAPE PLAN SOUTH
- LANDSCAPE GENERAL ARRANGEMENT - SHEET 1
- LANDSCAPE GENERAL ARRANGEMENT - SHEET 2
- LANDSCAPE GENERAL ARRANGEMENT - SHEET 3
- LANDSCAPE GENERAL ARRANGEMENT - SHEET 4
- LANDSCAPE GENERAL ARRANGEMENT - SHEET 5
- LANDSCAPE GENERAL ARRANGEMENT - SHEET 6
- LANDSCAPE GENERAL ARRANGEMENT - SHEET 7
- LANDSCAPE GENERAL ARRANGEMENT - SHEET 8
- EXTERNAL ACCESS AND SECURITY STRATEGY
- EXTERNAL CIRCULATION STRATEGY
- EXTERNAL SPORTS PROVISION
- TREE RETENTION PROTECTION AND REMOVAL
- SITE DEMOLITION AND REMODELLING PLAN
- PLANTING STRATEGY
- SOILS PLAN
- SITE SECTIONS SHEET 1
- SITE SECTIONS SHEET 2
- SITE SECTIONS SHEET 3
- ILLUSTRATIVE PLAN
- NOISE IMPACT ASSESSMENT
- HERITAGE IMPACT ASSESSMENT
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Northumberland granted permission on 16 October 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on Northumberland's portal will say. Our guide explains the common types.
Nearby applications
Within 0.3 miles
-
Berwick Academy Adams Drive Spittal Berwick-Upon-Tweed Northumberland TD15 2JF
Construction of single storey, single classroom building with supporting spaces, WC facilities and associated external footpath
Granted 15 docsSmall domestic -
Berwick Academy Adams Drive Spittal Berwick-Upon-Tweed Northumberland TD15 2JF
Request for a Screening Opinion in respect of the demolition of existing school buildings and the erection of new school buildings and associated external works including access and landscaping
Decided Outline Demolition 1 doc -
62 Sunnyside Crescent Spittal Northumberland TD15 2DL
Proposed alterations and extension to dwelling house
Refused Full applications Extension 10 docsDomestic -
62 Sunnyside Crescent Spittal Northumberland TD15 2DL
Proposed alterations and extension to dwelling house
Refused Full applications Extension 10 docsDomestic -
Berwick Academy Adams Drive Spittal Berwick-Upon-Tweed Northumberland TD15 2JF
Construction of single storey, single classroom building with supporting spaces, WC facilities and associated external footpath
Granted Other 15 docsSmall domestic -
Berwick Academy Adams Drive Spittal Northumberland TD15 2JF
93% historically approved · decision due ~4 Aug
Demolition of existing school buildings and the erection of new school buildings, and associated external works including access and landscaping.
Awaiting decision Other Demolition 195 docs