Skip to content
PlanIndex Get alerts
Menu

Planning application

Mayfair House Callerton Lane Ponteland Northumberland NE20 9EG

Granted Northumberland 26/01921/FUL Full applications

Works: Extension Domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Construction of a two-storey extension, to the south and north facades, alongside internal reconfiguration to improve functionality and quality of existing dwelling.

As published by the council, reference 26/01921/FUL

Application record

Reference
26/01921/FUL
Category
Full applications
Status
Permitted
Decision
Granted As published: Permitted
Received
2 Jun 2026
Validated
29 Jun 2026
Decided
25 Sep 2026
Ward
Ponteland East & Stannington
Parish
Ponteland
Decision by
Delegated Decision
Postcode
NE20 9EG

Timeline

Dates from the published record

  1. 2 Jun 2026

    Received by Northumberland

  2. 29 Jun 2026

    Validated

    Checked as complete and ready for consideration.

  3. 23 Aug 2026

    Added to PlanIndex

  4. 25 Sep 2026

    Decision issued: Permitted

  5. 28 Sep 2026

    Status changed to Permitted

    Previously Registered.

Documents

Plans, drawings, consultee responses and the officer's report

32 documents on file for this application

  • ECOLOGY COMMENTS Consultee Comment · 16 Sep 2026
  • ECOLOGICAL IMPACT ASSESSMENT Report/ Statement · 03 Sep 2026
  • PONTELAND TOWN COUNCIL RESPONSE Consultee Comment · 28 Jul 2026
  • ECOLOGY COMMENTS Consultee Comment · 24 Jul 2026
  • ENVIRONMENT AGENCY COMMENTS Consultee Comment · 23 Jul 2026
  • PRELIMINARY BAT ROOST ASSESSMENT Report/ Statement · 21 Jul 2026
  • FLOOD RISK REPORT Report/ Statement · 29 Jun 2026
  • HERITAGE STATEMENT Report/ Statement · 18 Jun 2026
  • APPLICATION FORM REDACTED Application Form · 01 Jun 2026
  • EXISTING SITE PLAN Plan · 01 Jun 2026
  • EXISTING BASEMENT FLOOR PLAN Plan · 01 Jun 2026
  • EXISTING GROUND FLOOR PLAN Plan · 01 Jun 2026
  • EXISTING FIRST FLOOR PLAN Plan · 01 Jun 2026
  • EXISTING ROOF PLAN Plan · 01 Jun 2026
  • EXISTING GROUND FLOOR PLAN Plan · 01 Jun 2026
  • EXISTING FIRST FLOOR PLAN_1-50_A3 Plan · 01 Jun 2026
  • EXISTING ROOF PLAN_1-50_A3 Plan · 01 Jun 2026
  • EXISTING ELEVATIONS 1 Plan · 01 Jun 2026
  • EXISTING ELEVATIONS SHEET 2 Plan · 01 Jun 2026
  • EXISTING SECTIONS Plan · 01 Jun 2026
  • PROPOSED SITE PLAN Plan · 01 Jun 2026
  • PROPOSED BASEMENT FLOOR PLAN Plan · 01 Jun 2026
  • PROPOSED GROUND FLOOR PLAN Plan · 01 Jun 2026
  • PROPOSED FIRST FLOOR PLAN Plan · 01 Jun 2026
  • PROPOSED ROOF PLAN Plan · 01 Jun 2026
  • PROPOSED GROUND FLOOR PLAN Plan · 01 Jun 2026
  • PROPOSED FIRST FLOOR PLAN Plan · 01 Jun 2026
  • PROPOSED ROOF PLAN Plan · 01 Jun 2026
  • PROPOSED ELEVATIONS SHEET 1 Plan · 01 Jun 2026
  • PROPOSED ELEVATIONS SHEET 2 Plan · 01 Jun 2026
  • PROPOSED SECTIONS Plan · 01 Jun 2026
  • DESIGN AND ACCESS STATEMENT V1 Report/ Statement · 01 Jun 2026

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Northumberland granted permission on 25 September 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Land On The Orchards Callerton Lane Ponteland Northumberland NE20 9EG

    26/00940/FUL Submitted 17 Mar 2026 50 yards away

    90% historically approved · decision due ~13 May

    Proposed formation of car park providing 62 parking spaces, including accessible bays, with associated access, circulation areas, landscaping and ancillary works

    Awaiting decision Full applications 9 docs
  • Mayfair House Callerton Lane Ponteland Northumberland NE20 9EG

    26/01921/FUL Submitted 2 Jun 2026 100 yards away

    Construction of a two-storey extension, to the south and north facades, alongside internal reconfiguration to improve functionality and quality of existing dwelling.

    Granted Full applications Extension 32 docs
    Domestic
  • Lane Nurseries Callerton Lane Ponteland Newcastle Upon Tyne Northumberland NE20 9EG

    26/02917/DEMGDO Submitted 17 Aug 2026 150 yards away

    93% historically approved · decision due ~13 Oct

    Notification of Prior Approval of demolition of 3no. dwellings, 2no. greenhouses and associated hardstanding

    Awaiting decision Other Demolition 13 docs
    Several homes
  • Lane Nurseries Callerton Lane Ponteland Newcastle Upon Tyne Northumberland NE20 9EG

    26/02917/DEMGDO Submitted 17 Aug 2026 150 yards away

    89% historically approved · decision due ~13 Oct

    Notification of Prior Approval of demolition of 3no. dwellings, 2no. greenhouses and associated hardstanding

    Awaiting decision Other Demolition 13 docs
    Several homes
  • 27 Main Street Ponteland Northumberland NE20 9NH

    26/02489/FUL Submitted 14 Jul 2026 150 yards away

    Permanent sitting of 1no chilled container, 1no ambient container and temporary (seasonal) siting of 1no ambient container

    Granted Full applications 24 docs
  • 27 Main Street Ponteland Northumberland NE20 9NH

    26/00371/FUL Submitted 2 Feb 2026 150 yards away

    90% historically approved · decision due ~31 Mar

    The siting of 3no. seasonal chilled containers and 2no. seasonal ambient containers at the existing foodstore

    Awaiting decision Full applications 16 docs

In Northumberland

  • 26/02930/FUL Withdrawn

    Flying Horse Flat 78 Waterloo Road Blyth Northumberland NE24 1DG

    Change of use from first floor residential unit over public house to beauticians

    Received 17 Aug, published by the council 19 Aug 2026 Full applications
  • 26/02409/FUL Granted

    13 Curly Lane Lesbury Northumberland NE66 3QB

    Proposed ground floor extension to create a utility room.

    Received 8 Jul, published by the council 7 Aug 2026 Full applications
  • 26/02197/FUL Withdrawn

    Bridge House Newbrough Northumberland NE47 5AR

    Construction of a single storey contemporary garden building to be used as a sitting room

    Received 19 Jun, published by the council 23 Aug 2026 Full applications
  • 26/03040/FUL Granted

    4 Callaly High Houses Whittingham Alnwick Northumberland NE66 4TE

    Installation of an oil fired heating system, replacement front and rear doors, installation of an electric vehicle charging point, internal damp remedial works, internal alterations for first floor stud partition walls, and re-roofing works (including replacement of existing roof windows)

    1 Sep 2026 Full applications
  • 26/02970/FUL Granted

    10 Olympia Gardens Morpeth Northumberland NE61 1JQ

    Proposed single storey rear extension, replacement flat roof and rooflight and rear dormer

    Received 21 Aug, published by the council 27 Aug 2026 Full applications