Planning application
Mill House Bothal Morpeth Northumberland NE61 6SP
Works: Demolition Windows or glazing
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Listed Building Consent for demolition and rebuilding of chimneys on both gables, repair to the gables where necessary, and installation of secondary glazing.
As published by the council, reference 26/04003/LBC
Application record
- Reference
- 26/04003/LBC
- Type
- Listed Building Consent
- Status
- Registered
- Received
- 16 Nov 2026
- Validated
- 17 Nov 2026
- Ward
- Bothal
- Parish
- Ashington
- Decision by
- Delegated Decision
- Postcode
- NE61 6SP
Comment by 8 December 2026
The council is taking comments on this application until then. Have your say on Northumberland National Park's portal.
Timeline
Dates from the published record
-
16 Nov 2026
Received by Northumberland National Park
-
17 Nov 2026
Validated
Checked as complete and ready for consideration.
-
20 Nov 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 12 January 2027, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Northumberland National Park took a median of 49 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Michie Group LLP Agent, registered in Alnwick
Active · incorporated 2025 · Alnwick
126 applications on PlanIndex · across 7 councils · 86% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
16 documents on file for this application
A planning file usually holds the application form, the consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWorking a patch? Trade sends you every new job in your area each morning. 14 days free.
What happens while it is decided
This application is with Northumberland National Park for determination, against a statutory target of eight weeks. Over the last year Northumberland National Park decided heritage and listed building applications in a median of 58 days. More in our guide to how long planning decisions take.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Other heritage and listed building applications
In Northumberland National Park
-
26/03535/LBC Refused
North Cottage Marley Cote Walls Hexham Northumberland NE47 0DQ
Listed Building Consent - Glass roof orangery to rear
-
26/03547/LBC Granted
Peth House The Peth Allendale Northumberland NE47 9ND
Listed Building Consent - Replacement roof and frames to existing conservatory to rear of property
-
26/03924/LBC Awaiting decision
1 Bothal Village Bothal Bank Bothal Northumberland NE61 6SW
Listed Building Consent for removal of non-original rear chimney stack, associated roof repairs and internal remedial works to the first floor of the rear extension
-
26/03898/LBC Awaiting decision
The Stables Shotley Hall Shotley Bridge Consett Northumberland DH8 9TE
Listed Building Consent for Internal refurbishment to existing First Floor Flat Works include the installation of new kitchen and bathroom fixtures and fittings, connected into existing waste and domestic H&C services. Replastering to defective and missing areas of existing walls and ceilings. Rewire to flat, including new wall chases and outlet positions. Relocation of existing gas boiler to kitchen cupboard, including installation of associate flue through external wall. Redecoration and laying of new floor coverings over existing floorboards.
-
26/03195/LBC Granted
Street Record Carham Berwick Borough Footpath 011 Carham Northumberland
Listed Building Consent for temporary access to the river/channel will be provided, including vegetation clearance where required. The working area around Bridge Pier 3 will be dewatered using temporary works, including a temporary watercourse diversion via upstream and downstream bagwork cofferdams and a PVC pipe (or suitable alternative) to maintain flows. Riverbed and bank materials will be excavated to formation level, followed by installation of a geotextile layer and rip-rap protection around Pier 3. The rip-rap will be backfilled and tied into upstream and downstream bed levels using reinstated site-won material, with bed levels reprofiled to provide a smooth transition over 2m. Excavated riverbanks will be reinstated using site-won material at slopes up to 1:2, covered with topsoil and biodegradable geotextile, and grass seeded to promote vegetation establishment.