Proposal
Non-material amendment (amendment to approved plans listed as part of condition 1) on approved application 25/02911/REM
As published by the council, reference 26/03763/NONMAT
Application record
- Reference
- 26/03763/NONMAT
- Type
- Non-Material Amendment
- Status
- Registered
- Received
- 26 Oct 2026
- Validated
- 26 Oct 2026
- Ward
- Sleekburn
- Parish
- East Bedlington
- Decision by
- Delegated Decision
Site history
Applications at this address on the Northumberland National Park register
This site has had 24 applications since 2026: 15 approved, 0 refused.
-
26/03819/FUL Awaiting decision
Land At Former Power Station Site On Northern Side Of Cambois Cambois Northumberland
Development of electricity grid connection between Blyth Substation and consented Cambois Data Centre Campus Substation 1 (NCC Ref. 25/03390/REM), comprising installation of underground 132kV electrical connection and communication cables, and temporary construction activity including excavation and backfilling of ground trenches, horizontal directional drilling, erection of construction fencing and associated works
-
26/03723/DISCON Awaiting decision
Land At Former Power Station Site On Northern Side Of Cambois Cambois Northumberland
Discharge of condition 34 (Surface Water) and 40 (Foul Water) on approved application 26/01617/VARYCO.
-
26/03299/DISCON Awaiting decision
Land At Former Power Station Site On Northern Side Of Cambois Cambois Northumberland
Discharge of condition 47 (piling works vibration - phase 1b) on approved planning application 26/01617/VARYCO
-
26/03290/DISCON Granted
Land At Former Power Station Site On Northern Side Of Cambois Cambois Northumberland
Discharge of condition 58 (Construction Methodology) on approved application 26/01617/VARYCO
-
26/03267/DISCON Granted
Land At Former Power Station Site On Northern Side Of Cambois Cambois Northumberland
Discharge of conditions 14 (construction method statement), 25 (drainage), 34 (surface water), 40 (foul water), 48 (dust), 49 (external lighting), 52 (non-native invasive species) and 53 (construction environmental management plan) on approved application 26/01617/VARYCO
-
26/03028/REM Awaiting decision
Land At Former Power Station Site On Northern Side Of Cambois Cambois Northumberland
Reserved matters application for appearance, landscaping, layout and scale on approved application 24/04112/OUTES for two data centre buildings including ancillary office space (Use Class B8), and associated landscaping and infrastructure on Phase 2 of the data centre campus
-
26/02931/DISCON Granted
Land At Former Power Station Site On Northern Side Of Cambois Cambois Northumberland
Discharge of conditions 18 (details of vehicular, pedestrian and cyclist connection) and 19 (bus stop improvements) on approved application 26/01617/VARYCO
-
26/02904/DISCON Awaiting decision
Land At Former Power Station Site On Northern Side Of Cambois Cambois Northumberland
Discharge of conditions 14 (construction method statement), 48 (dust) and 53 (CEMP) on approved application 24/04112/OUTES
-
26/02813/DISCON Granted
Land At Former Power Station Site On Northern Side Of Cambois Cambois Northumberland
Discharge of Condition 39 (Disposal of Surface Water Details) on approved application 24/04112/OUTES
-
26/02817/FUL Granted
Land At Former Power Station Site On Northern Side Of Cambois Cambois Northumberland
Application for 20kV temporary substations for construction and early operation of proposed Cambois Data Centre Campus (Application Reference: 24/04112/OUTES)
Timeline
Dates from the published record
-
26 Oct 2026
Received by Northumberland National Park
-
20 Nov 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 21 December 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Northumberland National Park took a median of 49 days over the applications it decided in the last year.
Documents
30 documents on file for this application
A planning file usually holds the application form, the consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWorking a patch? Trade sends you every new job in your area each morning. 14 days free.
What happens while it is decided
This application is with Northumberland National Park for determination, against a statutory target of eight weeks. Over the last year Northumberland National Park decided amendment applications in a median of 26 days. More in our guide to how long planning decisions take.
About amendment applications
An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Land At Former Power Station Site On Northern Side Of Cambois Cambois Northumberland
84% historically approved · decision due ~13 Nov
Discharge of condition 47 (piling works vibration - phase 1b) on approved planning application 26/01617/VARYCO
Awaiting decision Conditions 3 docs -
Land At Former Power Station Site On Northern Side Of Cambois Northumberland
Discharge of Condition 13 (Phasing Plan) pursuant to planning permission 24/04112/OUTES
-
Land At Former Power Station Site On Northern Side Of Cambois Cambois Northumberland
Discharge of condition 58 (Construction Methodology) on approved application 26/01617/VARYCO
Granted Conditions 4 docs -
Land At Former Power Station Site On Northern Side Of Cambois Cambois Northumberland
Discharge of conditions 18 (details of vehicular, pedestrian and cyclist connection) and 19 (bus stop improvements) on approved application 26/01617/VARYCO
-
Land At Former Power Station Site On Northern Side Of Cambois Cambois Northumberland
Discharge of Condition 39 (Disposal of Surface Water Details) on approved application 24/04112/OUTES
-
Land At Former Power Station Site On Northern Side Of Cambois Cambois Northumberland
84% historically approved · decision due ~12 Oct
Discharge of conditions 14 (construction method statement), 48 (dust) and 53 (CEMP) on approved application 24/04112/OUTES
Awaiting decision Conditions 13 docs
Other amendment applications
In Northumberland National Park
-
26/04019/NONMAT Awaiting decision
9 Cote Hill Drive Darras Hall Ponteland Newcastle Upon Tyne Northumberland NE20 9HW
Non-material amendment (Amended window & door configurations to elevations and dormer windows; Amended principal entrance door/glazing configuration; Single-storey rear extension is clad in Staffordshire Blue brick rather than zinc cladding) to approved application 23/01386/FUL
-
26/03990/NONMAT Awaiting decision
West School Cottage Church Road Stannington Northumberland NE61 6HF
Non-material amendment (Roofing material to North, East and West elevations revised to Sandtoft concrete tile ref: 'Rustic' terracotta Roofing material to Southern elevation revised to Sandtoft concrete tile fer: 'Dark Grey' to match the existing neighbouring property roof colour/ type, Solar panels omitted to Southern elevation, 3no. Conservation rooflights added to Southern elevation) on approved planning application 26/02507/VARYCO
-
26/03979/NONMAT Awaiting decision
Land West Of Thropton Demesne Thropton Northumberland
Non-Material Amendment (to allow a change in wording on Conditions 1 and 12 relating to Section 278 works) on approved application 26/00043/VARYCO
-
26/03973/NONMAT Awaiting decision
Land North Of The Garth Pottery Bank Morpeth Northumberland
Non-material amendment (to allow for changes to the approved layout) on approved application 16/04486/FUL
-
26/03961/NONMAT Awaiting decision
109 Runnymede Road Darras Hall Ponteland Northumberland NE20 9HL
Non Material Amendment (Amend the proposed roof finish from a single-ply membrane to a sedum (green) roof. Adjust the overall roof build-up depth to accommodate the structural requirements and necessary roof construction. Replace the existing proposed first-floor bedroom double doors with a window to accommodate the revised roof build-up. Relocate the proposed garden room further away from the site boundaries to comply with the Darras Hall Committee's requirements for a minimum 3m separation from each boundary. Reduce the overall footprint of the garden room to accommodate its revised position within the site. Amend the roof pitch to allow for the installation of low-profile slate roof tiles, as the previously proposed pitch was insufficient for the intended roof covering. Rooflights have also been incorporated into the revised roof design. Amend the fenestration to the elevations, including reducing the door openings and incorporating a corner window to reflect the revised layout and appearance) on approved application 26/01209/FUL