Planning application
Land North East Of Low Hedgeley Cottages Powburn Northumberland NE66 4JD
Relates to 26/01081/FUL
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Discharge of Conditions 3 (BNG), 4 (Landscape & Ecological Management Plan), 5 (Method Statement) and 6 (Construction Method Statement) on approved application 26/01081/FUL
As published by the council, reference 26/02731/DISCON
Application record
- Reference
- 26/02731/DISCON
- Type
- Discharge of Condition
- Status
- Registered
- Received
- 3 Aug 2026
- Validated
- 4 Aug 2026
- Ward
- Wooler
- Parish
- Hedgeley
- Decision by
- Delegated Decision
- Postcode
- NE66 4JD
Site history
Applications at this address on the Northumberland National Park register
This site has had 2 applications since 2026.
-
26/01081/FUL Awaiting decision
Land North East Of Low Hedgeley Cottages Powburn Northumberland NE66 4JD
Package of river and floodplain restoration works along a c. 5.2 km reach of the River Breamish to restore the river and its associated floodplain to a more natural, self-sustaining condition through re-establishing floodplain connectivity, improving hydromorphological function, enhancing wetland and riparian habitats. Works include excavation of a series of shallow chute channels, selective embankment lowering, removal to permit more frequent inundation, creation of new connection channels linking the river to existing floodplain lakes, localised infilling of redundant or artificial drainage features, in-channel large woody material features will be installed using trees felled locally to increase hydraulic diversity, encourage sediment deposition, create varied aquatic habitats, removal of redundant stone rip-rap will be undertaken in key locations where it is no longer necessary to support the river's recovery by enabling lateral movement, excavated materials will be reused on site where suitable or spread outside the active floodplain and no imported fill is proposed nor is the removal of materials off the land holding.
Timeline
Dates from the published record
-
3 Aug 2026
Received by Northumberland National Park
-
4 Aug 2026
Validated
Checked as complete and ready for consideration.
-
10 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 29 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Northumberland National Park took a median of 46 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
-
26/01081/FUL Awaiting decision
Land North East Of Low Hedgeley Cottages Powburn Northumberland NE66 4JD
Package of river and floodplain restoration works along a c. 5.2 km reach of the River Breamish to restore the river and its associated floodplain to a more natural, self-sustaining condition through re-establishing floodplain connectivity, improving hydromorphological function, enhancing wetland and riparian habitats. Works include excavation of a series of shallow chute channels, selective embankment lowering, removal to permit more frequent inundation, creation of new connection channels linking the river to existing floodplain lakes, localised infilling of redundant or artificial drainage features, in-channel large woody material features will be installed using trees felled locally to increase hydraulic diversity, encourage sediment deposition, create varied aquatic habitats, removal of redundant stone rip-rap will be undertaken in key locations where it is no longer necessary to support the river's recovery by enabling lateral movement, excavated materials will be reused on site where suitable or spread outside the active floodplain and no imported fill is proposed nor is the removal of materials off the land holding.
Documents
Plans, drawings, consultee responses and the officer's report
17 documents on file for this application
- CONDITION 6 - ADDENDUM
- HEDGELEY ESTATE SITE PLAN - HIGHWAYS
- CONSULTEE COMMENT SUBMITTED ONLINE
- CONSULTEE COMMENT SUBMITTED ONLINE
- CONSULTEE COMMENT SUBMITTED ONLINE
- RIVER BREAMISH CONSTRUCTION PHASE PLAN
- BIODIVERSITY NET GAIN ASSESSMENT
- BNG POST INTERVENTION MAPS
- BNG BASELINE MAPS
- RIVER BREAMISH AND POW BURN RESTORATION PROJECT_HMMP
- CULVERT DESIGNS_AMENDED
- RIVER BREAMISH METHOD STATEMENT - COMPLETE
- BNG METRIC CALCULATION
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Northumberland National Park for determination, against a statutory target of eight weeks. Over the last year Northumberland National Park decided condition discharge and variation applications in a median of 43 days. More in our guide to how long planning decisions take.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Land North East Of Low Hedgeley Cottages Powburn Northumberland NE66 4JD
90% historically approved · decision due ~28 May
Package of river and floodplain restoration works along a c. 5.2 km reach of the River Breamish to restore the river and its associated floodplain to a more natural, self-sustaining condition through re-establishing floodplain connectivity, improving hydromorphological function, enhancing wetland and riparian habitats. Works include excavation of a series of shallow chute channels, selective embankment lowering, removal to permit more frequent inundation, creation of new connection channels linking the river to existing floodplain lakes, localised infilling of redundant or artificial drainage features, in-channel large woody material features will be installed using trees felled locally to increase hydraulic diversity, encourage sediment deposition, create varied aquatic habitats, removal of redundant stone rip-rap will be undertaken in key locations where it is no longer necessary to support the river's recovery by enabling lateral movement, excavated materials will be reused on site where suitable or spread outside the active floodplain and no imported fill is proposed nor is the removal of materials off the land holding.
Awaiting decision Full applications Trees 34 docs
Other condition discharge and variation applications
In Northumberland National Park
-
26/01519/VARYCO Granted
Land South West Of Park Farm South Newsham Road Blyth Northumberland
Removal of Conditions 4 (Phasing), 14 (Highways Details), 31 (Travel Plan) and 38 (Off-Site Highways Works) of approved application 21/00074/VARYCO as they are no longer required
-
26/03029/DISCON Granted
Hollin Hill Cottage Hollin Hill Terrace Riding Mill Northumberland NE44 6HP
Discharge of condition 5 (proposed painting/staining) on approved application 26/01670/FUL
-
26/03556/DISCON Awaiting decision
Furnace House Mohope Northumberland NE47 8DQ
Discharge of Condition 4 (Bats) pursuant to planning permission 25/03504/FUL
-
26/03551/DISCON Awaiting decision
Land South West Of Eshott Home Farm Eshott Village Main Road Eshott Northumberland NE65 9EP
Discharge of condition 4 (BNG) on approved appplication 26/00434/FUL
-
26/03552/DISCON Awaiting decision
Site E Wansbeck Business Park Ashington Northumberland NE63 8QW
Discharge of Condition 25 (Refuse) pursuant to planning permission 26/00824/VARYCO