Planning application
Land North Of St Georges Hospital Morpeth Northumberland
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Discharge of conditions 20 (gas protection verification report) and 22 (validation report) on approved application 22/03770/FUL
As published by the council, reference 26/02434/DISCON
Application record
- Reference
- 26/02434/DISCON
- Type
- Discharge of Condition
- Status
- Permitted
- Decision
- Application Permitted
- Received
- 9 Jul 2026
- Validated
- 9 Jul 2026
- Decided
- 17 Aug 2026
- Ward
- Pegswood
- Parish
- Morpeth
- Decision by
- Delegated Decision
Timeline
Dates from the published record
-
9 Jul 2026
Received by Northumberland National Park
-
27 Jul 2026
Added to PlanIndex
-
17 Aug 2026
Decision issued: Application Permitted
Documents
Plans, drawings, consultee responses and the officer's report
10 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About conditions applications
How this application type works
This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.
Nearby applications
Within 500 metres
-
Former St Georges Hospital Site Morpeth Northumberland
79% historically approved · decision due ~12 Oct
Discharge of condition 43 (trees) on approved planning application 25/01389/VARYCO
Awaiting decision Conditions Trees 2 docs -
Former St Georges Hospital Site Morpeth Northumberland
79% historically approved · decision due ~5 May
Variation of condition 28 (gas) on approved application 25/01389/VARYCO to allow for adoption of CS1 gas protection measures for the forthcoming apartments and houses
Awaiting decision Conditions New dwelling 2 docs -
Former St Georges Hospital Morpeth Northumberland NE61 2NS
79% historically approved · decision due ~8 May
Variation of condition 10 on approved application 25/01389/VARYCO (original reference 23/02787/FUL) - Technical approval was obtained for proposed S278 works to Dark Lane/B1337 and was granted by NCC Highways Dept in 05.05.22. As no legal agreements have been provided to date we proposed that Condition 10 is changed to allow for construction/occupation of dwellings until agreement has been reached in relation to new trigger points if at all required.
Awaiting decision Conditions 9 docs -
The Chapel St Georges Park Access From Fletcher House To Sewage Works Morpeth Northumberland NE61 2JE
Decision due ~21 Aug
Discharge of conditions 4 (land contamination), 5 (ground gas), 6 (verification), 7 (service ducts seal), 8 (vehicular access and surfacing), 9 (cycle parking) and 10 (surface water drainage) pursuant to plaaning approval 24/01206/FUL
Decided -
The Chapel St Georges Park Access From Fletcher House To Sewage Works Morpeth Northumberland NE61 2JE
79% historically approved · decision due ~21 Aug
Discharge of conditions 4 (land contamination), 5 (ground gas), 6 (verification), 7 (service ducts seal), 8 (vehicular access and surfacing), 9 (cycle parking) and 10 (surface water drainage) pursuant to plaaning approval 24/01206/FUL
Awaiting decision Conditions 13 docs -
Land South Of Bluebell Court East Cottingwood Morpeth Northumberland
79% historically approved · decision due ~8 May
Removal of conditions 28 (Interim Priority Junction Arrangement) and 29 (Full Signalisation Junction Arrangement) on approved application 19/00904/FUL as required S278 agreements have not been provided, and therefore it is considered that no works to the existing junction are required
Awaiting decision Conditions 13 docs
Other conditions applications
In Northumberland National Park
-
26/02525/VARYCO Granted
Barnhill Farm Guyzance Northumberland NE65 9AG
Variation of condition 2 (approved plans) on approved application 25/03379/VARYCO to allow additional demolition due to storm damage, new ground floor cavity walling, newly applied edge of slab detail and minor changes to street lighting
-
26/03109/DISCON Awaiting decision
Land South East Of New Hall Farm Amble Northumberland
Partial Discharge of condition 17 (Ground Gas Protection) on approved application 18/01529/OUT
-
26/03094/DISCON Awaiting decision
Rothley East Shield Longwitton Morpeth Northumberland NE61 4JY
Discharge of Conditions 1 (Biodiversity Net Gain) and 4 (LEMP) of approved application 26/00527/FUL
-
26/03090/DISCON Awaiting decision
Blue Mill Thropton Morpeth Northumberland NE65 7JH
Discharge of Conditions 11 (Demolition and Construction Method Statement) and 12 (Bats) of approved application 26/00531/FUL
-
26/03097/VARYCO Awaiting decision
Barclays 22 - 24 Hide Hill Berwick-Upon-Tweed Northumberland TD15 1AF
Variation of Condition 3 (Restoration) pursuant to listed building consent 26/01261/LBC - The condition includes the wording "all works associated with the approved alterations shall be removed in their entirety, and the building shall be restored to its former condition as existing immediately prior to the grant of this listed building consent" which is regarded as inappropriate for the existing condition of this building, which has been subject to partial stripping out of internal alterations carried out since 1995. Condition 3 is to be replaced with the following wording: "Upon the cessation of the temporary use hereby, or when the authorised alterations are no longer required for that use (whichever occurs sooner), only the works scheduled below associated with the approved alterations shall be removed within 3 months of such cessation. Temporary guarding to internal stair handrail Ground floor internal partition walls and doors WC - Sanitary ware, cubicles, fixtures, and fittings