Awaiting decision Northumberland National Park 26/00616/FUL Full Application

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Proposed removal of redundant outbuildings and replacement with a single storey annexed building for use ancillary to the main dwelling, upgrade of the existing septic tank with a new package treatment plant, provision of a ground rack and solar panel array.

As published by the council, reference 26/00616/FUL

Application record

Reference
26/00616/FUL
Type
Full Application
Status
Registered
Received
19 Feb 2026
Validated
24 Feb 2026
Ward
Wooler
Parish
Chatton
Decision by
Delegated Decision
Postcode
NE71 6EU

Site history

Applications at this address on the Northumberland National Park register

This site has had 2 applications since 2026.

  • 26/02800/DISCON Awaiting decision

    Clavering Wooler Northumberland NE71 6EU

    Discharge of condition 5 (Demolition and /or Construction Method Statement), 7b (Bat licence registration) and 8 (External Lighting) on approved planning application 26/00616/FUL

    Submitted 7 Aug 2026 Conditions

Timeline

Dates from the published record

  1. 19 Feb 2026

    Received by Northumberland National Park

  2. 24 Feb 2026

    Validated

    Checked as complete and ready for consideration.

  3. 10 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 21 April 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Northumberland National Park took a median of 34 days over the applications it decided in the last year.

Cases linked to this one on the register

1 later application on the register refers to this one:

  • 26/02800/DISCON Awaiting decision

    Clavering Wooler Northumberland NE71 6EU

    Discharge of condition 5 (Demolition and /or Construction Method Statement), 7b (Bat licence registration) and 8 (External Lighting) on approved planning application 26/00616/FUL

    Submitted 7 Aug 2026 Conditions

Documents

Plans, drawings, consultee responses and the officer's report

18 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Northumberland National Park for determination, against a statutory target of eight weeks. Over the last year Northumberland National Park decided full applications in a median of 55 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Clavering Wooler Northumberland NE71 6EU

    26/02800/DISCON Submitted 7 Aug 2026 0m away

    Decision due ~2 Oct

    Discharge of condition 5 (Demolition and /or Construction Method Statement), 7b (Bat licence registration) and 8 (External Lighting) on approved planning application 26/00616/FUL

    Awaiting decision Demolition 5 docs

In Northumberland National Park

  • 26/02392/FUL Granted

    Alexandra Park Alexandra Way Newbiggin-By-The-Sea Northumberland

    Erection of external metal storage unit for garden maintenance equipment complete with electrical power supply. Building to be erected on existing concrete hardstanding (24sq.m).

    7 Jul 2026 Full applications
  • 26/02304/FUL Withdrawn

    Street Record Panama Viaduct Carham Berwick Borough Footpath 011 Carham Northumberland

    Temporary access and vegetation clearance to enable works at Bridge Pier 3. The works involve temporarily diverting the watercourse using cofferdams and a pipe to dewater the work area, excavating riverbed and bank material, and installing geotextile and rip-rap erosion protection. On completion, the riverbed and banks will be reinstated using site-won material, topsoil, biodegradable geotextile, and grass seeding to restore the area and encourage vegetation growth.

    29 Jun 2026 Full applications
  • 26/03106/FUL Awaiting decision

    Land East Of 63 Front Street Prudhoe Northumberland

    Proposed installation of a Street Hub 3 telecom unit

    3 Sep 2026 Full applications
  • 26/03103/FUL Awaiting decision

    30 West Acres Alnwick Northumberland NE66 2QA

    Two storey side extension

    3 Sep 2026 Full applications
  • 26/03101/FUL Awaiting decision

    20 Dene Grove Seghill Northumberland NE23 7EP

    Change of use to Class C2 small care home

    3 Sep 2026 Full applications