Planning application
13 Dalton Close Hall Close Grange Cramlington Northumberland NE23 6DW
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Proposed single storey side and rear extension
As published by the council, reference 26/00033/FUL
Application record
- Reference
- 26/00033/FUL
- Type
- Full Application
- Status
- Registered
- Received
- 7 Jan 2026
- Validated
- 7 Jan 2026
- Ward
- Cramlington Village
- Parish
- Cramlington
- Decision by
- Delegated Decision
- Postcode
- NE23 6DW
Timeline
Dates from the published record
-
7 Jan 2026
Received by Northumberland National Park
-
10 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 4 March 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Northumberland National Park took a median of 34 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Agent on file, an architecture practice registered in Newcastle Upon Tyne
39 applications on PlanIndex · across 5 councils · 93% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
2 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
The process from here
This application is with Northumberland National Park for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Westfield Cramlington Northumberland NE23 6QG
87% historically approved · decision due ~22 May
Change of use of house/garage/annexe buildings from C3 [dwelling houses] to C2 [residential institutions] plus installation of emergency exit door to north elevation.
Awaiting decision Full applications 12 docsDomestic -
101, 103 And 105 Allensgreen Hall Close Green Cramlington Northumberland NE23 6SG
90% historically approved · decision due ~30 Oct
Strip each dwelling back to its structural steel frame. Construct new pitched roof. Rebuild and upgrade external envelope. Reconfigure internal accommodation to provide open-plan living accommodation at ground-floor level and three usable bedrooms and bathroom at first floor level for each dwelling.
Awaiting decision Other 8 docsDomestic -
101, 103 And 105 Allensgreen Hall Close Green Cramlington Northumberland NE23 6SG
Decision due ~30 Oct
Strip each dwelling back to its structural steel frame. Construct new pitched roof. Rebuild and upgrade external envelope. Reconfigure internal accommodation to provide open-plan living accommodation at ground-floor level and three usable bedrooms and bathroom at first floor level for each dwelling.
Awaiting decisionDomestic -
The Vicarage Cramlington Northumberland NE23 6QG
98% historically approved · decision due ~6 Apr
Tree in a Conservation Area: T1 Sycamore - Fell to ground level
Awaiting decision Trees 5 docs -
Car Park Dewley Hall Close Grange Cramlington NE23 6DT
Provision of 5no. affordable dwellings
Refused Full applications 162 docs -
Cramlington Hall Dudley Lane Cramlington Northumberland NE23 6PZ
Decision due ~24 Jul
Discharge of conditions 5 (porch/chimney stone), 7 (chimney repointing mortar mix), and 9 (fire surround) on approved application 25/03089/LBC
Decided ExtensionSmall domestic
Other full applications applications
In Northumberland National Park
-
26/02392/FUL Granted
Alexandra Park Alexandra Way Newbiggin-By-The-Sea Northumberland
Erection of external metal storage unit for garden maintenance equipment complete with electrical power supply. Building to be erected on existing concrete hardstanding (24sq.m).
-
26/02304/FUL Withdrawn
Street Record Panama Viaduct Carham Berwick Borough Footpath 011 Carham Northumberland
Temporary access and vegetation clearance to enable works at Bridge Pier 3. The works involve temporarily diverting the watercourse using cofferdams and a pipe to dewater the work area, excavating riverbed and bank material, and installing geotextile and rip-rap erosion protection. On completion, the riverbed and banks will be reinstated using site-won material, topsoil, biodegradable geotextile, and grass seeding to restore the area and encourage vegetation growth.
-
26/03106/FUL Awaiting decision
Land East Of 63 Front Street Prudhoe Northumberland
Proposed installation of a Street Hub 3 telecom unit
-
26/03103/FUL Awaiting decision
30 West Acres Alnwick Northumberland NE66 2QA
Two storey side extension
-
26/03101/FUL Awaiting decision
20 Dene Grove Seghill Northumberland NE23 7EP
Change of use to Class C2 small care home