Planning application
5 Mill Hill Lane Northallerton North Yorkshire DL6 1BA
Works: Extension
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Application for the construction of a One and a half Storey Side Extension to Eastern Elevation
As published by the council, reference ZB26/00434/FUL
Application record
- Reference
- ZB26/00434/FUL
- Type
- Full Application
- Status
- Decided (Granted)
- Decision
- Granted
- Received
- 6 Mar 2026
- Validated
- 6 Mar 2026
- Decided
- 22 Apr 2026
- Ward
- Northallerton South
- Parish
- Northallerton
- Decision by
- Delegated Decision
- Postcode
- DL6 1BA
Timeline
Dates from the published record
-
6 Mar 2026
Received by North Yorkshire
-
22 Apr 2026
Decision issued: Granted
-
6 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, an architecture practice
32 applications on PlanIndex · across 6 councils · 86% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
5 Mill Hill Lane Northallerton North Yorkshire DL6 1BA
Application for the construction of a One and a half Storey Side Extension to Eastern Elevation
Granted Full applications Extension 9 docs -
5 Mill Hill Lane Northallerton North Yorkshire DL6 1BA
Application for the construction of a One and a half Storey Side Extension to Eastern Elevation
Granted Full applications Extension 9 docs -
5 Mill Hill Lane Northallerton North Yorkshire DL6 1BA
Proposed Side Extension, Raising of Eaves levels to provide additional volume of space within in existing dormer roof [please note the existing ridge line does not increase], new porch and replacement of existing attached garage with new detached garage.
Decided Outline Extension Loft or dormerSmall domestic -
5 Mill Hill Lane Northallerton North Yorkshire DL6 1BA
Proposed Side Extension, Raising of Eaves levels to provide additional volume of space within in existing dormer roof [please note the existing ridge line does not increase], new porch and replacement of existing attached garage with new detached garage.
Decided Outline Extension Loft or dormerSmall domestic -
5 Mill Hill Lane Northallerton North Yorkshire DL6 1BA
Proposed Side Extension, Raising of Eaves levels to provide additional volume of space within in existing dormer roof [please note the existing ridge line does not increase], new porch and replacement of existing attached garage with new detached garage.
Decided Outline Extension Loft or dormerSmall domestic -
2 Oak Mount Court Romanby North Yorkshire DL6 1PA
87% historically approved · decision due ~14 Oct
Application for a Lawful Development Certificate for the proposed removal of 2no up and over electrically operated garage doors, frames and operating gear to be replaced by 1no double width garage door, frame and operating gear, in an opening formed by reducing the overall width of the 2no garage door openings.
Awaiting decision Lawful development 3 docs
Other full applications applications
In North Yorkshire
-
26/01023/FUL Granted
26 Rossett Green Lane Harrogate North Yorkshire HG2 9LH
Demolition of existing Garage. Erection of first floor side extension, part two-storey, part single-storey rear extension, two-storey front extension, loft conversion and new detached garage with studio over. Alterations to fenestration. Widening of existing highway crossing and erection entrance gates, gate posts and railings. Widening of existing driveway.
-
ZE26/00152/MFUL Granted
Land At 477211 470238 York Road Malton North Yorkshire
Erection of factory and energy centre with all associated works
-
ZD25/00633/FULL Granted
Greystones Market Place Middleham Leyburn North Yorkshire DL8 4NR
Householder application for rooftop solar PV and ground mounted air source heat pump installation
-
25/04211/FUL Refused
41 Gap Road Hunmanby Gap Filey North Yorkshire YO14 9QP
Erection of 1 no. dwelling following demolition of existing dwelling
-
ZE26/00730/MFUL Awaiting decision
Land West Of Outgang Lane Pickering North Yorkshire
Erection of 92 dwellings and associated infrastructure, landscaping and open space