Planning application
Part OS Field 6600 Sutton On The Forest North Yorkshire
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
This application seeks prior approval for a change of use of an existing agricultural building to a flexible commercial use under Class R of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended).
As published by the council, reference ZB25/01778/MPN
Application record
- Reference
- ZB25/01778/MPN
- Type
- Class R (M) GPDO Prior Notification
- Status
- Decided (Prior Approval Not Required)
- Decision
- Prior Approval Not Required
- Received
- 30 Sep 2025
- Validated
- 30 Sep 2025
- Decided
- 25 Nov 2025
- Ward
- Huby & Tollerton
- Parish
- Sutton-on-the-Forest
- Decision by
- Delegated Decision
Site history
Applications at this address on the North Yorkshire register
This site has had 4 applications since 2025: 2 approved, 0 refused.
-
ZB26/00303/FUL Awaiting decision
Part OS Field 6600 Sutton On The Forest North Yorkshire
Installation of a Ground Mounted Solar photovoltaic (PV) array and associated battery storage
-
ZB26/00264/FUL Awaiting decision
Part OS Field 6600 Sutton On The Forest North Yorkshire
Erection of a new building to accommodate three padel courts
-
ZB26/00134/SPN Granted
Part OS Field 6600 Sutton On The Forest North Yorkshire
Application to determine if prior approval is required for a proposed Roof mounted PV array located on existing agricultural buildings
Timeline
Dates from the published record
-
30 Sep 2025
Received by North Yorkshire
-
25 Nov 2025
Decision issued: Prior Approval Not Required
-
10 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in Scarborough
19 applications on PlanIndex · across 3 councils
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
21 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
North Yorkshire granted permission on 25 November 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About prior approval applications
Prior approval applies where permitted development rights already grant the principle of the work, leaving the council only the specific matters the rules name, commonly within 56 days. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Part OS Field 6600 Sutton On The Forest North Yorkshire
This application seeks prior approval for a change of use of an existing agricultural building to a flexible commercial use under Class R of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended).
Granted Prior approval 21 docs -
Part OS Field 6600 Sutton On The Forest North Yorkshire
This application seeks prior approval for a change of use of an existing agricultural building to a flexible commercial use under Class R of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended).
Granted Prior approval 21 docs -
Part OS Field 6600 Sutton On The Forest North Yorkshire
91% historically approved · decision due ~8 May
Erection of a new building to accommodate three padel courts
Awaiting decision Full applications 15 docs -
Part OS Field 6600 Sutton On The Forest North Yorkshire
91% historically approved · decision due ~8 May
Erection of a new building to accommodate three padel courts
Awaiting decision Full applications 15 docs -
Part OS Field 6600 Sutton On The Forest North Yorkshire
91% historically approved · decision due ~8 May
Erection of a new building to accommodate three padel courts
Awaiting decision Full applications 15 docs -
Fridlington Farms Limited The Estate Office Sutton On The Forest York North Yorkshire YO61 1EE
91% historically approved · decision due ~23 Jun
Erection of a lean to building to accommodate two paddle courts, construction of one outdoor paddle court and outdoor seating area.
Awaiting decision Full applications 12 docs
Other prior approval applications
In North Yorkshire
-
ZD26/00482/PDN Refused
Barn Closes Field Maison Dieu Richmond North Yorkshire
Notice of intention to operate a temporary pop-up campsite for a maximum of 30 days, covering the dates 1 -15 August and 18-31 August inclusive. Maximum pitches - 50 across both fields combined
-
26/05292/PND Awaiting decision
Land To The North Of Drax Power Station New Road Drax Selby North Yorkshire YO8 8TE
Prior notification for demolition of former storage buildings known as the Woodyard Buildings, which form part of the wider Drax Power Station site
-
ZD26/00495/PDN Awaiting decision
St Edwards Cottage Southside Scorton Richmond North Yorkshire DL10 6DN
Proposed single story extension to rear of existing dwelling projecting 3meters from face of existing rear wall but 4m from original dwellinghouse. Extension is to provide kitchen/dining family space. Proposed extension has a flat roof with parapet to minimise the height of roof structure and prevent issues with over shadowing.
-
ZB26/00485/MBN Refused
Shire Oaks Farm Forest Lane Alne York North Yorkshire YO61 1TT
Application to determine if prior approval is required for the proposed conversion of agricultural building into a dwelling
-
ZD26/00475/PDN Awaiting decision
Kingfisher Cottage Ellerton On Swale Richmond North Yorkshire DL10 6AP
Proposed single storey flat roofed sunroom extension to rear of property extending 5.06m from rear wall of original dwelling, height to eaves is 3.00m and maximum height of extension is 3.00m