Hunmanby Grange Cans Dale To The Grange Wold Newton Filey North Yorkshire YO25 3HS

Granted North Yorkshire 26/02453/PPV Prior Notif Solar Equip on non-domestic

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

The proposed development comprises the installation of a roof-mounted solar PV and battery storage system to provide on-site renewable energy generation. The solar PV system will consist of 448 panels rated at 595Wp each, providing a total installed capacity of 266.56kWp. The panels will be mounted on the existing buildings using a rail mounting system specifically designed for the roof type, fixed in accordance with manufacturer guidance and relevant British Standards. All associated electrical equipment, including inverters, cabling and protection devices, will be installed to meet current UK regulations and standards. The system is intended to reduce the site's carbon footprint and improve energy self-sufficiency through increased use of on-site renewable energy.

As published by the council, reference 26/02453/PPV

Application record

Reference
26/02453/PPV
Type
Prior Notif Solar Equip on non-domestic
Status
Decided
Decision
Prior approval not required
Received
13 May 2026
Validated
13 May 2026
Decided
24 Jun 2026
Ward
Hunmanby & Sherburn
Parish
Hunmanby (Scarborough)
Decision by
Chief Planner
Postcode
YO25 3HS

Timeline

Dates from the published record

  1. 13 May 2026

    Received by North Yorkshire

  2. 24 Jun 2026

    Decision issued: Prior approval not required

  3. 4 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, registered in Lincoln

3 applications on PlanIndex · across 3 councils

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About this record

Reading the register

This page mirrors an entry on the statutory planning register that North Yorkshire is required to keep. The published feed for this record does not state which type of application it is, which is common for older entries and for some council systems; the register entry on the council portal will say, alongside the case officer and any consultation dates.

Every planning application follows the same broad path: submission, validation, publicity, then a decision by officers or committee. Our guide to planning application types explains the common types and what each can approve.

Nearby applications

Within 500 metres

  • Hunmanby Grange Cans Dale To The Grange Wold Newton Filey North Yorkshire YO25 3HS

    26/02453/PPV Submitted 13 May 2026 0m away

    The proposed development comprises the installation of a roof-mounted solar PV and battery storage system to provide on-site renewable energy generation. The solar PV system will consist of 448 panels rated at 595Wp each, providing a total installed capacity of 266.56kWp. The panels will be mounted on the existing buildings using a rail mounting system specifically designed for the roof type, fixed in accordance with manufacturer guidance and relevant British Standards. All associated electrical equipment, including inverters, cabling and protection devices, will be installed to meet current UK regulations and standards. The system is intended to reduce the site's carbon footprint and improve energy self-sufficiency through increased use of on-site renewable energy.

    Granted 6 docs
  • Hunmanby Grange Cans Dale To The Grange Wold Newton Filey North Yorkshire YO25 3HS

    26/02453/PPV Submitted 13 May 2026 0m away

    The proposed development comprises the installation of a roof-mounted solar PV and battery storage system to provide on-site renewable energy generation. The solar PV system will consist of 448 panels rated at 595Wp each, providing a total installed capacity of 266.56kWp. The panels will be mounted on the existing buildings using a rail mounting system specifically designed for the roof type, fixed in accordance with manufacturer guidance and relevant British Standards. All associated electrical equipment, including inverters, cabling and protection devices, will be installed to meet current UK regulations and standards. The system is intended to reduce the site's carbon footprint and improve energy self-sufficiency through increased use of on-site renewable energy.

    Granted 6 docs