Skip to content
PlanIndex Get alerts
Menu

Planning application

8 Starkey Lane Farnhill North Yorkshire BD20 9AW

Granted North Yorkshire 26/02365/FUL Full permission

Works: Extension Domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Householder permission for a two storey rear extension.

As published by the council, reference 26/02365/FUL

Application record

Reference
26/02365/FUL
Type
Full permission
Status
Decided
Decision
Application Permitted
Received
1 May 2026
Validated
15 May 2026
Decided
23 Jul 2026
Ward
Aire Valley
Parish
Farnhill
Decision by
Chief Planner
Postcode
BD20 9AW

Timeline

Dates from the published record

  1. 1 May 2026

    Received by North Yorkshire

  2. 15 May 2026

    Validated

    Checked as complete and ready for consideration.

  3. 23 Jul 2026

    Decision issued: Application Permitted

  4. 4 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

9 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 8 Starkey Lane Farnhill North Yorkshire BD20 9AW

    26/02365/FUL Submitted 1 May 2026 0m away

    91% historically approved · decision due ~10 Jul

    Householder permission for a two storey rear extension.

    Awaiting decision Full applications Extension 6 docs
    Domestic
  • 8 Starkey Lane Farnhill North Yorkshire BD20 9AW

    26/02365/FUL Submitted 1 May 2026 0m away

    91% historically approved · decision due ~10 Jul

    Householder permission for a two storey rear extension.

    Awaiting decision Full applications Extension 6 docs
    Domestic
  • 5 The Crofts Farnhill North Yorkshire BD20 9AG

    26/04503/TPO Submitted 31 Jul 2026 164m away

    89% historically approved · decision due ~25 Sep

    Removal of branches on 2no. Sycamore Trees TPO CRA45-1-1958. Cutting back of suckers low down on the trunk as they are hanging very low across the garden.

    Awaiting decision Trees 8 docs
  • 5 The Crofts Farnhill North Yorkshire BD20 9AG

    26/04503/TPO Submitted 31 Jul 2026 164m away

    89% historically approved · decision due ~25 Sep

    Removal of branches on 2no. Sycamore Trees TPO CRA45-1-1958. Cutting back of suckers low down on the trunk as they are hanging very low across the garden.

    Awaiting decision Trees 8 docs
  • Flat, White Lion Hotel Priest Bank Road Kildwick North Yorkshire BD20 9BH

    26/01491/FUL Submitted 24 Mar 2026 182m away

    91% historically approved · decision due ~14 Aug

    Full application to replace outbuilding roof (retrospective)

    Awaiting decision Full applications 11 docs
  • Flat, White Lion Hotel Priest Bank Road Kildwick North Yorkshire BD20 9BH

    26/01491/FUL Submitted 24 Mar 2026 182m away

    91% historically approved · decision due ~14 Aug

    Full application to replace outbuilding roof (retrospective)

    Awaiting decision Full applications 11 docs

In North Yorkshire

  • 26/01023/FUL Granted

    26 Rossett Green Lane Harrogate North Yorkshire HG2 9LH

    Demolition of existing Garage. Erection of first floor side extension, part two-storey, part single-storey rear extension, two-storey front extension, loft conversion and new detached garage with studio over. Alterations to fenestration. Widening of existing highway crossing and erection entrance gates, gate posts and railings. Widening of existing driveway.

    27 Feb 2026 Full applications
  • ZE26/00152/MFUL Granted

    Land At 477211 470238 York Road Malton North Yorkshire

    Erection of factory and energy centre with all associated works

    23 Feb 2026 Full applications
  • ZD25/00633/FULL Granted

    Greystones Market Place Middleham Leyburn North Yorkshire DL8 4NR

    Householder application for rooftop solar PV and ground mounted air source heat pump installation

    11 Nov 2025 Full applications
  • 25/04211/FUL Refused

    41 Gap Road Hunmanby Gap Filey North Yorkshire YO14 9QP

    Erection of 1 no. dwelling following demolition of existing dwelling

    28 Nov 2025 Full applications
  • ZE26/00730/MFUL Awaiting decision

    Land West Of Outgang Lane Pickering North Yorkshire

    Erection of 92 dwellings and associated infrastructure, landscaping and open space

    25 Aug 2026 Full applications