Planning application
Land South East Of Wormald Green Station Lane Wormald Green North Yorkshire
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Installation of an underground cable to connect the approved solar farm (ref: HGTZC23/04361/EIAMAJ) to Wormald Green Substation.
As published by the council, reference 26/01384/FULMAJ
Application record
- Reference
- 26/01384/FULMAJ
- Type
- Full permission
- Status
- Awaiting decision
- Received
- 19 Mar 2026
- Validated
- 22 Apr 2026
- Ward
- Wathvale & Bishop Monkton
- Parish
- Bishop Monkton
Timeline
Dates from the published record
-
19 Mar 2026
Received by North Yorkshire
-
22 Apr 2026
Validated
Checked as complete and ready for consideration.
-
4 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 17 June 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
North Yorkshire took a median of 57 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
34 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
The process from here
This application is with North Yorkshire for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Land South East Of Wormald Green Station Lane Wormald Green North Yorkshire
Installation of an underground cable to connect the approved solar farm (ref: HGTZC23/04361/EIAMAJ) to Wormald Green Substation.
Granted Full applications 25 docs -
Land South East Of Wormald Green Station Lane Wormald Green North Yorkshire
Installation of an underground cable to connect the approved solar farm (ref: HGTZC23/04361/EIAMAJ) to Wormald Green Substation.
Granted Full applications 25 docs -
Land South East Of Wormald Green Station Lane Wormald Green North Yorkshire
91% historically approved · decision due ~17 Jun
Installation of an underground cable to connect the approved solar farm (ref: HGTZC23/04361/EIAMAJ) to Wormald Green Substation.
Awaiting decision Full applications 34 docs -
Land South East Of Wormald Green Station Lane Wormald Green North Yorkshire
Installation of an underground cable to connect the approved solar farm (ref: HGTZC23/04361/EIAMAJ) to Wormald Green Substation.
Granted Full applications 25 docs -
Land South East Of Wormald Green Station Lane Wormald Green North Yorkshire
91% historically approved · decision due ~17 Jun
Installation of an underground cable to connect the approved solar farm (ref: HGTZC23/04361/EIAMAJ) to Wormald Green Substation.
Awaiting decision Full applications 34 docs -
Solar Farm Battery Storage Facility Station Lane South Stainley Harrogate North Yorkshire
Non-material amendment to allow amendments to the wording of condition 2 to Section 73 permission 23/00916/DVCON which varied Condition 3 of planning permission 22/00777/FUL allowing revised site layout plans in respect of a Proposed Battery Energy Storage System and associated infrastructure including transformers, switch rooms, cabin, storage container, CCTV, boundary fence and access gates and formation of new access
Granted Amendments 5 docsSmall domestic
Other full applications applications
In North Yorkshire
-
26/01023/FUL Granted
26 Rossett Green Lane Harrogate North Yorkshire HG2 9LH
Demolition of existing Garage. Erection of first floor side extension, part two-storey, part single-storey rear extension, two-storey front extension, loft conversion and new detached garage with studio over. Alterations to fenestration. Widening of existing highway crossing and erection entrance gates, gate posts and railings. Widening of existing driveway.
-
ZE26/00152/MFUL Granted
Land At 477211 470238 York Road Malton North Yorkshire
Erection of factory and energy centre with all associated works
-
ZD25/00633/FULL Granted
Greystones Market Place Middleham Leyburn North Yorkshire DL8 4NR
Householder application for rooftop solar PV and ground mounted air source heat pump installation
-
25/04211/FUL Refused
41 Gap Road Hunmanby Gap Filey North Yorkshire YO14 9QP
Erection of 1 no. dwelling following demolition of existing dwelling
-
ZE26/00730/MFUL Awaiting decision
Land West Of Outgang Lane Pickering North Yorkshire
Erection of 92 dwellings and associated infrastructure, landscaping and open space