Remodelling of roof and facade of planning permission HGT20/02496/FUL and addition of two-storey element.

As published by the council, reference 25/04239/FUL

Timeline

Dates from the published record

  1. 2 Dec 2025

    Received by North Yorkshire

  2. 5 Jan 2026

    Validated

    Checked as complete and ready for consideration.

  3. 23 Feb 2026

    Decision issued: Application Permitted

  4. 27 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 25/04239/FUL Granted

    3 The Bungalows Scriftain Lane Kirk Deighton North Yorkshire LS22 4DT

    Remodelling of roof and facade of planning permission HGT20/02496/FUL and addition of two-storey element.

    2 Dec 2025 0m away Full applications
  • 25/04035/COU Awaiting decision

    5 Millfield Marton Cum Grafton North Yorkshire YO51 9PT

    Change of use of part of existing double garage to form a beauty treatment room. No external alterations are proposed. Internal works include installation of a stud wall to create separate space. Both garage doors to be retained for access to remaining garage area.

    14 Nov 2025 143m away Full applications
  • 25/04035/COU Awaiting decision

    5 Millfield Marton Cum Grafton North Yorkshire YO51 9PT

    Change of use of part of existing double garage to form a beauty treatment room. No external alterations are proposed. Internal works include installation of a stud wall to create separate space. Both garage doors to be retained for access to remaining garage area.

    14 Nov 2025 143m away Full applications
  • 25/04035/COU Awaiting decision

    5 Millfield Marton Cum Grafton North Yorkshire YO51 9PT

    Change of use of part of existing double garage to form a beauty treatment room. No external alterations are proposed. Internal works include installation of a stud wall to create separate space. Both garage doors to be retained for access to remaining garage area.

    14 Nov 2025 143m away Full applications
  • 25/03974/PNT56 Granted

    Street Record Deighton Road Kirk Deighton North Yorkshire

    Installation of a 20m street pole supporting 6 no. antennas, 2 no. 0.3m transmission dishes along with 3 no. equipment cabinets and ancillary development there to including 3 no. Remote Radio Units (RRUs).

    13 Nov 2025 143m away Telecoms
  • 26/02194/FUL Awaiting decision

    Football Ground Wetherby Road Kirk Deighton North Yorkshire LS22 4DS

    Material change of use from football clubhouse, changing rooms, playing field and carpark (use class F.2 local community) to dual use of place of worship (use class F.1 learning and non-residential institutions) with the addition of an air source heat pump and football changing rooms playing field and carpark.

    30 Apr 2026 153m away Full applications

In North Yorkshire

  • Oakwood Lodges Greengate Lane South Duffield North Yorkshire YO8 6EQ

    Erection of 5no. one-bed lodges and 1no. four-bed lodge.

    23 Dec 2025 Full applications
  • ZB26/00111/FUL Granted

    The Garth 11 Hilton Road Seamer Middlesbrough North Yorkshire TS9 5LT

    Demolition and removal of dwelling and erection of new dormer bungalow and garage (self build)

    20 Jan 2026 Full applications
  • 25/04002/FUL Granted

    Bonnie Marie 1 Filey Road Gristhorpe Filey North Yorkshire YO14 9PH

    Creation of holiday let. Erection of front and rear extensions. Dormer windows to the front and rear roofslope

    14 Nov 2025 Full applications
  • 26/00305/FUL Granted

    The Lodge Hill Foot Lane Pannal North Yorkshire HG3 1NX

    Demolition of existing dwelling and erection of 1 no. dwelling (self-build) with associated landscaping.

    19 Jan 2026 Full applications
  • ZB26/00115/FUL Granted

    Lane End Farm Alne Station York North Yorkshire YO61 1TS

    Conversion and extension of existing outbuildings to create single dwelling

    21 Jan 2026 Full applications