Planning application
Hunmanby Grange Cans Dale To The Grange Wold Newton Filey North Yorkshire YO25 3HS
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
The proposed development comprises the installation of a roof-mounted solar PV and battery storage system to provide on-site renewable energy generation. The solar PV system will consist of 448 panels rated at 595Wp each, providing a total installed capacity of 266.56kWp. The panels will be mounted on the existing buildings using a rail mounting system specifically designed for the roof type, fixed in accordance with manufacturer guidance and relevant British Standards. All associated electrical equipment, including inverters, cabling and protection devices, will be installed to meet current UK regulations and standards. The system is intended to reduce the site's carbon footprint and improve energy self-sufficiency through increased use of on-site renewable energy.
As published by the council, reference 26/02453/PPV
Application record
- Reference
- 26/02453/PPV
- Type
- Prior Notif Solar Equip on non-domestic
- Status
- Decided
- Decision
- Granted As published: Prior approval not required
- Received
- 13 May 2026
- Validated
- 13 May 2026
- Decided
- 24 Jun 2026
- Ward
- Hunmanby & Sherburn
- Parish
- Hunmanby (Scarborough)
- Decision by
- Chief Planner
- Postcode
- YO25 3HS
Timeline
Dates from the published record
-
13 May 2026
Received by North York Moors National Park
-
24 Jun 2026
Decision issued: Prior approval not required
-
2 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
NerG Ltd Agent, registered in Lincoln
Active · incorporated 2014 · Lincoln
4 applications on PlanIndex · across 4 councils
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
6 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
North York Moors National Park granted permission on 24 June 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on North York Moors National Park's portal will say. Our guide explains the common types.
Nearby applications
Within 0.3 miles
-
Hunmanby Grange Cans Dale To The Grange Wold Newton Filey North Yorkshire YO25 3HS
The proposed development comprises the installation of a roof-mounted solar PV and battery storage system to provide on-site renewable energy generation. The solar PV system will consist of 448 panels rated at 595Wp each, providing a total installed capacity of 266.56kWp. The panels will be mounted on the existing buildings using a rail mounting system specifically designed for the roof type, fixed in accordance with manufacturer guidance and relevant British Standards. All associated electrical equipment, including inverters, cabling and protection devices, will be installed to meet current UK regulations and standards. The system is intended to reduce the site's carbon footprint and improve energy self-sufficiency through increased use of on-site renewable energy.
Granted 6 docs -
Hunmanby Grange Cans Dale To The Grange Wold Newton Filey North Yorkshire YO25 3HS
The proposed development comprises the installation of a roof-mounted solar PV and battery storage system to provide on-site renewable energy generation. The solar PV system will consist of 448 panels rated at 595Wp each, providing a total installed capacity of 266.56kWp. The panels will be mounted on the existing buildings using a rail mounting system specifically designed for the roof type, fixed in accordance with manufacturer guidance and relevant British Standards. All associated electrical equipment, including inverters, cabling and protection devices, will be installed to meet current UK regulations and standards. The system is intended to reduce the site's carbon footprint and improve energy self-sufficiency through increased use of on-site renewable energy.
Granted 6 docs