Planning application
Swinsty Hall Swinsty Hall Timble North Yorkshire HG3 1ST
Works: Windows or glazing
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Refurbishment and alterations to fenestration of existing barn annexe.
As published by the council, reference 25/04004/FUL
Application record
- Reference
- 25/04004/FUL
- Type
- Full permission
- Status
- Decided
- Decision
- Application Permitted
- Received
- 14 Nov 2025
- Validated
- 12 Dec 2025
- Decided
- 25 Feb 2026
- Ward
- Washburn & Birstwith
- Parish
- Little Timble
- Decision by
- Chief Planner
- Postcode
- HG3 1ST
Timeline
Dates from the published record
-
14 Nov 2025
Received by North York Moors National Park
-
12 Dec 2025
Validated
Checked as complete and ready for consideration.
-
25 Feb 2026
Decision issued: Application Permitted
-
9 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, an architecture practice
490 applications on PlanIndex · across 6 councils · 88% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
27 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Swinsty Hall Swinsty Hall Timble North Yorkshire HG3 1ST
Refurbishment and alterations to fenestration of existing barn annexe.
Granted Full applications Windows or glazing 27 docs -
Swinsty Hall Swinsty Hall Timble North Yorkshire HG3 1ST
Listed building consent for reconfiguration and external alterations to barn annexe.
Granted Heritage and listed buildings 24 docs -
Swinsty Hall Swinsty Hall Timble North Yorkshire HG3 1ST
Listed building consent for reconfiguration and external alterations to barn annexe.
Granted Heritage and listed buildings 24 docs -
Swinsty Hall Swinsty Hall Timble North Yorkshire HG3 1ST
Refurbishment and alterations to fenestration of existing barn annexe.
Granted Full applications Windows or glazing 27 docs -
Swinsty Hall Swinsty Hall Timble North Yorkshire HG3 1ST
Listed building consent for reconfiguration and external alterations to barn annexe.
Granted Heritage and listed buildings 24 docs -
Swinsty Hall Swinsty Hall Timble North Yorkshire HG3 1ST
97% historically approved · decision due ~16 Sep
Approval of details under Condition 3 (Joinery Details) and Condition 6 (Repair Methodology) of planning permission 25/04004/FUL Refurbishment and alterations to fenestration of existing barn annexe.
Awaiting decision Conditions Windows or glazing 8 docs
Other full applications applications
In North York Moors National Park
-
26/01023/FUL Granted
26 Rossett Green Lane Harrogate North Yorkshire HG2 9LH
Demolition of existing Garage. Erection of first floor side extension, part two-storey, part single-storey rear extension, two-storey front extension, loft conversion and new detached garage with studio over. Alterations to fenestration. Widening of existing highway crossing and erection entrance gates, gate posts and railings. Widening of existing driveway.
-
ZE26/00152/MFUL Granted
Land At 477211 470238 York Road Malton North Yorkshire
Erection of factory and energy centre with all associated works
-
ZE26/00477/FUL Refused
Land At E470268 N485490 Wits End Kirkby Mills Industrial Estate Kirkbymoorside North Yorkshire
Erection of new industrial unit
-
ZD26/00422/FULL Granted
Ulshaw Grange Middleham Leyburn North Yorkshire DL8 4PU
Full planning permission for outdoor swimming pool and pool room
-
26/03448/FUL Granted
3 Ure Bank Terrace Ripon North Yorkshire HG4 1JG
Loft conversion including the installation of side and rear rooflights and a new window opening within the front gable elevation.