Planning application

Land At Limby Hall Lane Limby Hall Lane Swannington LE67 8QR

Awaiting decision North West Leicestershire 26/01077/FUL Full Application

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Engineering operations comprising the formation of hard surfaced access track and five hardstanding pitches

As published by the council, reference 26/01077/FUL

Application record

Reference
26/01077/FUL
Type
Full Application
Status
Validated
Received
19 Aug 2026
Validated
19 Aug 2026
Ward
Valley
Parish
Swannington
Postcode
LE67 8QR

Timeline

Dates from the published record

  1. 19 Aug 2026

    Received by North West Leicestershire

  2. 30 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 14 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    North West Leicestershire took a median of 65 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

David Granger Architectural Design Ltd Agent, an architecture practice registered in Ashby De La Zouch

Active · incorporated 2004 · Ashby De La Zouch

300 applications on PlanIndex · across 13 councils · 96% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

39 documents on file for this application

  • MINING REMEDIATION Consultation Response · 28 Aug 2026
  • AIRPORT SAFEGUARDING Consultation Response · 27 Aug 2026
  • APPLICATION FORM - WITHOUT PERSONAL DATA Application Form · 19 Aug 2026
  • PLANNING STATEMENT Report · 19 Aug 2026
  • TOPOGRAPHICAL PAGE 1 Drawing · 19 Aug 2026
  • THE LOCATION PLAN AND PROPOSED BLOCK PLAN Drawing · 19 Aug 2026
  • PROPOSED HARDSTANDING Drawing · 19 Aug 2026

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with North West Leicestershire for determination, against a statutory target of eight weeks. Over the last year North West Leicestershire decided full applications in a median of 96 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In North West Leicestershire

  • 26/00779/FUL Granted

    Greystones 34 Upper Packington Road Ashby De La Zouch Leicestershire LE65 1EF

    Alterations to 2no. existing dormers on front and side elevations and insertion of 1no. dormer on rear elevation

    Received 15 Jun, published by the council 22 Jul 2026 Full applications
  • 26/00832/FUL Granted

    81 Meadow Lane Coalville Leicestershire LE67 4DN

    Demolition of existing store and workshop and erection of two storey rear extension

    Received 25 Jun, published by the council 22 Jul 2026 Full applications
  • 26/01055/FUL Granted

    Shippenstone Mill Street Packington Ashby De La Zouch Leicestershire LE65 1WN

    Retention of an electrical car charging point located on an existing brick pillar to the frontage of the main dwellinghouse (Retrospective Application)

    Received 14 Aug, published by the council 24 Aug 2026 Full applications
  • 26/00625/FUL Granted

    2A School Lane Newton Burgoland Coalville Leicestershire LE67 2SL

    Conversion and extension of existing detached outbuilding to provide for residential annexe accommodation

    Received 8 May, published by the council 22 Jul 2026 Full applications
  • 26/00905/FUL Granted

    Windrush 3 Hall Gardens Hemington Derby Leicestershire DE74 2RU

    Replacement of existing glazed conservatory roof with tile roof

    Received 14 Jul, published by the council 13 Aug 2026 Full applications