Planning application
Land To The North Of The Barroon Castle Donington DE74 2PF
Works: New dwelling Domestic
Read from the description, not a valuation. How we read the register
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Technical details consent for the erection of a self-build dwelling with associated works following the grant of permission in principle (25/01155/PIP)
As published by the council, reference 26/00920/TDC
Application record
- Reference
- 26/00920/TDC
- Type
- Technical Details Consent - Minor
- Status
- Validated
- Received
- 17 Jul 2026
- Validated
- 17 Jul 2026
- Ward
- Daleacre Hill
- Parish
- Lockington/Hemington
- Postcode
- DE74 2PF
Timeline
Dates from the published record
-
17 Jul 2026
Received by North West Leicestershire
-
31 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 11 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
North West Leicestershire took a median of 65 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
David Granger Architectural Design Ltd Agent, an architecture practice registered in Ashby De La Zouch
Active · incorporated 2004 · Ashby De La Zouch
304 applications on PlanIndex · across 13 councils · 96% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
27 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with North West Leicestershire for determination, against a statutory target of eight weeks. Over the last year North West Leicestershire's median decision took 65 days. More in our guide to how long planning decisions take.
About this record
The published feed does not state which type of application this is; the register entry on North West Leicestershire's portal will say. Our guide explains the common types.
Nearby applications
Within 0.3 miles
-
47 Barroon Castle Donington Derby DE74 2PF
Erection of a first-floor side extension, extensions and conversion to the existing detached garage and boundary treatments
Granted Full applications Extension 19 docs -
69 Barroon Castle Donington Derby DE74 2PF
Removal of 1no. Walnut Tree (Protected by Tree Preservation Order 234)
Withdrawn Trees -
63 Barroon Castle Donington Derby DE74 2PF
100% historically approved · decision due ~30 Sep
The approval of details reserved by condition 4 (Piled Foundations and Suspended Floor Construction) and condition 6 (Levels) relating to planning permission ref: 25/01446/FUL
Awaiting decision Conditions 4 docs -
70 Barroon Castle Donington Derby DE74 2PF
Demolition of existing conservatory and construction of single storey extension to rear
Granted Full applications Extension Demolition 9 docsSmall domestic -
53 Barroon Castle Donington Derby DE74 2PF
Felling of 1no. Beech tree (Protected by Tree Preservation Order T234)
Granted Trees 5 docs -
73 Barroon Castle Donington Derby DE74 2PF
Erection of replacement outbuilding
Granted Full applications 6 docs