Planning application

Land Adjacent To Moorlands Murton Lane Murton Tyne And Wear

Awaiting decision North Tyneside 26/01001/OHL

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Proposed to install a new totem pole (shown as two red dots connected by a red line on the attached plan) to fit a 200kVA 11kV three phase transformer to be installed on the pole with 315A LV fuses fitted. Due to the location of pole 94, an existing pole is to be relocated (the existing pole to be removed is shown as a blue dot on the plan). LV pole 94 is to be replaced with a steel pole (shown as a red dot on the plan) located in the soft dig area clear of the planned junction

As published by the council, reference 26/01001/OHL

Application record

Reference
26/01001/OHL
Status
Unknown
Received
6 Jul 2026
Validated
6 Jul 2026
Ward
New York & Murton
Parish
North Shields
Decision by
Delegated Decision

Timeline

Dates from the published record

  1. 6 Jul 2026

    Received by North Tyneside

  2. 21 Jul 2026

    Added to PlanIndex

  3. 8 Aug 2026

    Status changed to Unknown

    Previously Awaiting decision.

  4. Decision

    Awaiting decision

    Decision expected by 31 August 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    North Tyneside took a median of 56 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

3 documents on file for this application

  • LANDSCAPE Consultee Comment · 05 Aug 2026
  • COVERING LETTER Correspondence · 07 Jul 2026
  • LOCATION PLAN OS Extract · 07 Jul 2026

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with North Tyneside for determination, against a statutory target of eight weeks. Over the last year North Tyneside's median decision took 56 days. More in our guide to how long planning decisions take.

About this record

The published feed does not state which type of application this is; the register entry on North Tyneside's portal will say. Our guide explains the common types.