Planning application
Land At Former Tyne Brand Building Tanners Bank North Shields Tyne And Wear
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Redevelopment of site to deliver 138 residential units, 203sqm of Class E flexible commercial floorspace within Use Class E. Creation of new vehicular and pedestrian access, under-croft car park and surface parking areas, engineering and structural works and landscaping (UPDATED DRAINAGE STRATEGY)
As published by the council, reference 25/01299/FULM
Application record
- Reference
- 25/01299/FULM
- Type
- Full Major application
- Status
- Awaiting decision
- Received
- 9 Oct 2025
- Validated
- 17 Oct 2025
- Ward
- North Shields
- Parish
- North Shields
- Decision by
- Committee Decision
Timeline
Dates from the published record
-
9 Oct 2025
Received by North Tyneside
-
17 Oct 2025
Validated
Checked as complete and ready for consideration.
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 16 January 2026, 13 weeks from validation under the statutory target. Extensions of time are common and are agreed case by case.
North Tyneside took a median of 56 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
NORR Consultants Limited Agent, registered in Newcastle Upon Tyne
Active · incorporated 2010 · Newcastle Upon Tyne
19 applications on PlanIndex · across 9 councils · 92% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordKickpoint Ltd Applicant, registered in Gateshead
Active · incorporated 2002 · Gateshead
2 applications on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
361 documents on file for this application
- NATURAL ENGLAND
- ECOLOGY
- DESIGN
- RESPONSE TO ECOLOGY COMMENTS
- RESPONSE TO DESIGN COMMENTS
- SUPPORTING INFORMATION
- VIABILITY APPRAISAL REPORT
- APPROPRIATE ASSESSMENT
- BLOCK 10 - PROPOSED GA PLAN -LEVEL 01
- DESIGN
- URBAN DESIGN
- ECOLOGY
- BLOCK 2 PROPOSED ELEVATIONS SHEET 2
- BLOCK 1 PROPOSED GA PLAN LEVEL 00
- BLOCK 2 PROPOSED GA PLAN LEVEL 00
- BLOCK 2 PROPOSED ELEVATIONS
- BLOCK 2 PROPOSED ELEVATIONS SHEET 2
- BLOCK 2 PROPOSED SECTIONS
- BLOCK 4 PROPOSED GA PLAN LEVEL 00
- BLOCK 4 PROPOSED ELEVATIONS SHEET 1
- BLOCK 10 PROPOSED ELEVATIONS SHEET 1
- BLOCK 11 PROPOSED ELEVATIONS SHEET 1
- BLOCK 11 PROPOSED ELEVATIONS SHEET 2
- BLOCK 11 PROPOSED SECTIONS SHEET 1
- URBAN DESIGN RESPONSE
- REFUSE STORAGE RESPONSE
- REFUSE STRATEGY
- BLOCK 5 PROPOSED GA PLAN LEVEL 00
- BLOCK 5 PROPOSED ELEVATIONS
- BLOCK 10 PROPOSED GA PLAN LEVEL 01
- BLOCK 10 PROPOSED ELEVATIONS SHEET 1
- DESIGN
- INDICATIVE PLANTING DETAILS SHEET 1
- INDICATIVE PLANTING DETAILS SHEET 2
- INDICATIVE PLANTING DETAILS SHEET 3
- LEVEL ACCESS ROUTES
- LANDSCAPE
- BLOCK 5 PROPOSED GA PLAN LEVEL 00
- BLOCK 5 PROPOSED GA PLAN LEVEL 01
- BLOCK 5 PROPOSED GA PLAN LEVEL 02
- BLOCK 1 PROPOSED GA ELEVATIONS LEVEL 01
- BLOCK 1 PROPOSED GA ELEVATIONS LEVEL 01 SHEET 2
- BLOCK 2 PROPOSED GA ELEVATIONS SHEET 1
- BLOCK 2 PROPOSED GA ELEVATIONS SHEET 2
- BLOCK 3 PROPOSED GA ELEVATIONS SHEET 1
- BLOCK 3 PROPOSED GA ELEVATIONS SHEET 2
- BLOCK 4 PROPOSED GA ELEVATIONS SHEET 1
- BLOCK 4 PROPOSED GA ELEVATIONS SHEET 2
- BLOCK 4 PROPOSED GA ELEVATIONS SHEET 3
- BLOCK 5 PROPOSED GA ELEVATIONS SHEET 1
- BLOCK 7 PROPOSED GA ELEVATIONS SHEET 1
- BLOCK 8 PROPOSED GA ELEVATIONS SHEET 1
- BLOCK 9 PROPOSED GA ELEVATIONS SHEET 1
- BLOCK 10 PROPOSED GA ELEVATIONS SHEET 1
- BLOCK 11 PROPOSED GA ELEVATIONS SHEET 1
- BLOCK 11 PROPOSED GA ELEVATIONS SHEET 2
- SITE PROPOSED GA ELEVATIONS SHEET 1
- SITE PROPOSED GA ELEVATIONS SHEET 2
- LANDSCAPE PROPOSED GENERAL ARRANGEMENT PLAN
- LOW LIGHTS TAVERN DETAIL AREA
- HARDWORKS GENERAL ARRANGEMENT PLAN
- SOFTWORKS GENERAL ARRANGEMENT PLAN
- LLFA
- BNG HIERARCHY REPORT
- ECIA AND BNG STATEMENT
- HRA AND SSSI IMPACT ASSESSMENT
- BNG METRIC
- ARCHAEOLOGY
- ARCHAEOLOGICAL EVALUATION
- BLOCK 3 PROPOSED GA PLAN LEVEL 00
- BLOCK 3 PROPOSED GA PLAN LEVEL 01
- BLOCK 3 PROPOSED GA PLAN LEVEL 02
- BLOCK 3 PROPOSED GA ROOF LEVEL
- BLOCK 3 PROPOSED ELEVATIONS SHEET 1
- BLOCK 3 PROPOSED ELEVATIONS SHEET 2
- BLOCK 3 PROPOSED SECTIONS
- BLOCK 5 PROPOSED PLAN LEVEL 00
- BLOCK 5 PROPOSED PLAN LEVEL 01
- BLOCK 5 PROPOSED PLAN LEVEL 02
- BLOCK 5 PROPOSED ROOF PLAN
- BLOCK 5 PROPOSED ELEVATIONS SHEET 1
- BLOCK 5 PROPOSED SECTIONS
- DRAINAGE STRATEGY
- LANDSCAPE GENERAL ARRANGEMENT PLAN
- LOWLIGHTS TAVERN DETAIL AREA
- HARDWORKS GENERAL ARRANGEMENT PLAN
- SOFTWORKS GENERAL ARRANGEMENT PLAN
- INDICATIVE PLANTING DETAILS SHEET 1
- INDICATIVE PLANTING DETAILS SHEET 2
- INDICATIVE PLANTING DETAILS SHEET 3
- PROPOSED SITE PLAN LEVEL 00
- PROPOSED SITE PLAN LEVEL 01
- PROPOSED SITE PLAN LEVEL 02
- PROPOSED SITE PLAN LEVEL 03
- PROPOSED SITE PLAN LEVEL 04
- PROPOSED SITE PLAN LEVEL 05
- PROPOSED SITE PLAN ROOF LEVEL
- PHASE 1 DESK STUDY
- ADDITIONAL INFORMATION
- LANDSCAPE
- HISTORIC ENGLAND
- POLICE
- LLFA
- LOCATION PLAN
- DRAINAGE STRATEGY REPORT
- DRAINAGE STRATEGY
- BLOCK 1 PROPOSED GA PLAN LEVEL 00
- BLOCK 1 PROPOSED GA PLAN LEVEL 01
- BLOCK 1 PROPOSED GA PLAN LEVEL 02
- BLOCK 1 PROPOSED GA PLAN LEVEL 03
- BLOCK 1 PROPOSED GA PLAN ROOF LEVEL
- BLOCK 1 PROPOSED ELEVATIONS SHEET 1
- BLOCK 1 PROPOSED ELEVATIONS SHEET 2
- DAYLIGHT AND SUNLIGHT REPORT
- DAYLIGHT AND SUNLIGHT REPORT APPENDICES
- DESIGN AND ACCESS STATEMENT PART 1
- DESIGN AND ACCESS STATEMENT PART 2
- DESIGN AND ACCESS STATEMENT PART 3
- LANDSCAPE GENERAL ARRANGEMENT PLAN
- HARDWORKS GENERAL ARRANGEMENT PLAN
- SOFTWORKS GENERAL ARRANGEMENT PLAN
- SITE PROPOSED GA PLAN LEVEL 00
- SITE PROPOSED GA PLAN LEVEL 01
- SITE PROPOSED GA PLAN LEVEL 02
- SITE PROPOSED GA PLAN LEVEL 03
- SITE PROPOSED GA PLAN LEVEL 04
- SITE PROPOSED GA PLAN LEVEL 05
- SITE PROPOSED GA PLAN ROOF
- SWEPT PATH ANNANLYSIS
- VISUAL IMAGING REPORT
- PHOTO MONTAGES
- PHOTO MONTAGES
- PHOTO MONTAGES
- OBJECTION
- DAYLIGHT AND SUNLIGHT REPORT
- DAYLIGHT AND SUNLIGHT REPORT APPENDICES
- DRAWING ISSUE SHEET
- BLOCK 1 PROPOSED SECTIONS SHEET 1
- BLOCK 2 PROPOSED SECTIONS
- BLOCK 3 PROPOSED SECTIONS
- BLOCK 4 PROPOSED SECTIONS
- BLOCK 5 PROPOSED SECTIONS
- BLOCK 7 PROPOSED SECTIONS
- BLOCK 8 PROPOSED SECTIONS
- BLOCK 9 PROPOSED ROOF PLAN
- BLOCK 9 PROPOSED SECTIONS
- BLOCK 10 PROPOSED SECTIONS
- BLOCK 11 PROPOSED SECTIONS
- BLOCK 4 PROPOSED GA PLAN LEVEL 00
- BLOCK 4 PROPOSED GA PLAN LEVEL 01
- BLOCK 4 PROPOSED GA PLAN LEVEL 02
- BLOCK 4 PROPOSED GA PLAN LEVEL 03
- BLOCK 4 PROPOSED GA PLAN LEVEL 04
- BLOCK 4 PROPOSED GA PLAN ROOF
- BLOCK 4 PROPOSED ELEVATIONS SHEET 1
- BLOCK 4 PROPOSED ELEVATIONS SHEET 2
- BLOCK 4 PROPOSED ELEVATIONS SHEET 3
- BLOCK 5 PROPOSED GA PLAN LEVEL 00
- BLOCK 5 PROPOSED GA PLAN LEVEL 01
- BLOCK 5 PROPOSED GA PLAN LEVEL 02
- BLOCK 5 PROPOSED GA PLAN ROOF
- BLOCK 5 PROPOSED ELEVATIONS SHEET 1
- BLOCK 7 PROPOSED GA PLAN LEVEL 00
- BLOCK 7 PROPOSED GA PLAN LEVEL 01
- BLOCK 7 PROPOSED GA PLAN LEVEL 02
- BLOCK 7 PROPOSED GA PLAN ROOF
- BLOCK 7 PROPOSED ELEVATIONS SHEET 1
- BLOCK 8 PROPOSED GA PLAN LEVEL 00
- BLOCK 8 PROPOSED GA PLAN LEVEL 01
- BLOCK 8 PROPOSED GA PLAN LEVEL 02
- BLOCK 8 PROPOSED GA PLAN LEVEL 03
- BLOCK 8 PROPOSED GA PLAN ROOF
- BLOCK 8 PROPOSED ELEVATIONS SHEET 1
- BLOCK 8 PROPOSED ELEVATIONS SHEET 2
- BLOCK 9 PROPOSED GA PLAN LEVEL 00
- BLOCK 9 PROPOSED GA PLAN LEVEL 01
- BLOCK 9 PROPOSED GA PLAN LEVEL 02
- BLOCK 9 PROPOSED GA PLAN LEVEL 03
- BLOCK 9 PROPOSED GA PLAN ROOF
- BLOCK 9 PROPOSED ELEVATIONS SHEET 1
- BLOCK 10 PROPOSED GA PLAN LEVEL 00
- BLOCK 10 PROPOSED GA PLAN LEVEL 01
- BLOCK 10 PROPOSED GA PLAN LEVEL 02
- BLOCK 10 PROPOSED GA PLAN LEVEL 03
- BLOCK 10 PROPOSED GA PLAN ROOF
- BLOCK 10 PROPOSED ELEVATIONS SHEET 1
- BLOCK 10 PROPOSED ELEVATIONS SHEET 2
- BLOCK 11 PROPOSED GA PLAN LEVEL 00
- BLOCK 11 PROPOSED GA PLAN LEVEL 01
- BLOCK 11 PROPOSED GA PLAN LEVEL 02
- BLOCK 11 PROPOSED GA PLAN LEVEL 03
- BLOCK 11 PROPOSED GA PLAN ROOF
- BLOCK 11 PROPOSED ELEVATIONS SHEET 1
- BLOCK 11 PROPOSED ELEVATIONS SHEET 2
- PROPOSED SITE PLAN LEVEL 00
- PROPOSED SITE PLAN LEVEL 01
- PROPOSED SITE PLAN LEVEL 02
- PROPOSED SITE PLAN LEVEL 03
- PROPOSED SITE PLAN LEVEL 04
- PROPOSED SITE PLAN LEVEL 05
- PROPOSED SITE PLAN ROOF
- PROPOSED SITE ELEVATIONS SHEET 1
- PROPOSED SITE ELEVATIONS SHEET 2
- PROPOSED SUBSTATION ELEVATIONS
- PROPOSED SITE SECTIONS
- BUILDING 2 PROPOSED GA PLAN LEVEL 00
- BUILDING 2 PROPOSED GA PLAN LEVEL 01
- BUILDING 2 PROPOSED GA PLAN LEVEL 02
- BUILDING 2 PROPOSED GA PLAN LEVEL 03
- BUILDING 2 PROPOSED GA PLAN ROOF
- BUILDING 2 PROPOSED ELEVATIONS SHEET 1
- BUILDING 2 PROPOSED ELEVATIONS SHEET 2
- BUILDING 3 PROPOSED GA PLAN LEVEL 00
- BUILDING 3 PROPOSED GA PLAN LEVEL 01
- BUILDING 3 PROPOSED GA PLAN LEVEL 02
- BUILDING 3 PROPOSED ROOF PLAN
- BUILDING 3 PROPOSED ELEVATIONS SHEET 1
- BUILDING 3 PROPOSED ELEVATIONS SHEET 2
- DESIGN AND ACCESS STATEMENT
- SUMMARY OF AMENDMENTS
- NATURAL ENGLAND
- COMMENT
- ECOLOGY
- DESIGN
- NORTHUMBRIA POLICE
- HISTORIC ENGLAND
- HERITAGE STATEMENT
- NORTHUMBERLAND & NEWCASTLE SOCIETY
- SUPPORT
- ARCHAEOLOGY
- LANDSCAPE
- REPRESENTATION
- NORTHUMBRIAN WATER
- LLFA
- COAL AUTHORITY
- PROPOSED SITE SECTIONS
- SITE - EXISTING PLAN
- APPLICATIONFORMREDACTED
- BLOCK 1 - PROPOSED GA ELEVATIONS - SHEET 2
- BLOCK 1 - PROPOSED GA SECTIONS - SHEET 1
- BLOCK 1 - PROPOSED GA PLAN - LEVEL 00
- BLOCK 1 - PROPOSED GA PLAN - LEVEL 01
- BLOCK 1 - PROPOSED GA PLAN - LEVEL 02
- BLOCK 1 - PROPOSED GA PLAN - LEVEL 03
- BLOCK 1 - PROPOSED GA PLAN - ROOF
- BLOCK 1 - PROPOSED GA ELEVATIONS - SHEET 1
- BLOCK 2 - PROPOSED GA PLAN - LEVEL 00
- BLOCK 2 - PROPOSED GA PLAN - LEVEL 01
- BLOCK 2 - PROPOSED GA PLAN - LEVEL 02
- BLOCK 2 - PROPOSED GA PLAN - LEVEL 03
- BLOCK 2 - PROPOSED GA PLAN - ROOF
- BLOCK 2 - PROPOSED GA ELEVATIONS - SHEET 1
- BLOCK 2 - PROPOSED GA ELEVATIONS - SHEET 2
- BLOCK 2 - PROPOSED GA SECTIONS
- BLOCK 3 - PROPOSED GA SECTIONS - SHEET 1
- BLOCK 3 - PROPOSED GA PLAN - LEVEL 00
- BLOCK 3 - PROPOSED GA PLAN - LEVEL 01
- BLOCK 3 - PROPOSED GA PLAN - LEVEL 02
- BLOCK 3 - PROPOSED GA PLAN - ROOF
- BLOCK 3 - PROPOSED GA ELEVATIONS - SHEET 1
- BLOCK 3 - PROPOSED GA ELEVATIONS - SHEET 2
- BLOCK 4 - PROPOSED GA SECTIONS - SHEET 1
- BLOCK 4 - PROPOSED GA PLAN - LEVEL 00
- BLOCK 4 - PROPOSED GA PLAN - LEVEL 01
- BLOCK 4 - PROPOSED GA PLAN - LEVEL 02
- BLOCK 4 - PROPOSED GA PLAN - LEVEL 03
- BLOCK 4 - PROPOSED GA PLAN - LEVEL 04
- BLOCK 4 - PROPOSED GA PLAN - ROOF
- BLOCK 4 - PROPOSED GA ELEVATIONS - SHEET 1
- BLOCK 4 - PROPOSED GA ELEVATIONS - SHEET 2
- BLOCK 4 - PROPOSED GA ELEVATIONS - SHEET 3
- BLOCK 5 - PROPOSED GA ELEVATIONS - SHEET 1
- BLOCK 5 - PROPOSED GA SECTIONS - SHEET 1
- BLOCK 5 - PROPOSED GA PLAN - LEVEL 00
- BLOCK 5 - PROPOSED GA PLAN - LEVEL 01
- BLOCK 5 - PROPOSED GA PLAN - LEVEL 02
- BLOCK 5 - PROPOSED GA PLAN - ROOF
- BLOCK 6 - PROPOSED GA PLANS
- BLOCK 6 - GA ELEVATIONS - SHEET 1
- BLOCK 6 - GA SECTIONS - SHEET 1
- BLOCK 7 - PROPOSED GA ELEVATIONS - SHEET 1
- BLOCK 7 - PROPOSED GA SECTIONS - SHEET 1
- BLOCK 7 - PROPOSED GA PLAN - LEVEL 00
- BLOCK 7 - PROPOSED GA PLAN - LEVEL 01
- BLOCK 7 - PROPOSED GA PLAN - LEVEL 02
- BLOCK 7 - PROPOSED GA PLAN - ROOF
- BLOCK 8 - PROPOSED GA SECTIONS - SHEET 1
- BLOCK 8 - PROPOSED GA PLAN - LEVEL 00
- BLOCK 8 - PROPOSED GA PLAN - LEVEL 01
- BLOCK 8 - PROPOSED GA PLAN - LEVEL 02
- BLOCK 8 - PROPOSED GA PLAN - LEVEL 03
- BLOCK 8 - PROPOSED GA PLAN - ROOF
- BLOCK 8 - PROPOSED GA ELEVATIONS - SHEET 1
- BLOCK 8 - PROPOSED GA ELEVATIONS - SHEET 2
- BLOCK 9 - PROPOSED GA ELEVATIONS - SHEET 1
- BLOCK 9 - PROPOSED GA SECTIONS - SHEET 1
- BLOCK 9 - PROPOSED GA PLAN - LEVEL 00
- BLOCK 9 - PROPOSED GA PLAN - LEVEL 01
- BLOCK 9 - PROPOSED GA PLAN - LEVEL 02
- BLOCK 9 - PROPOSED GA PLAN - LEVEL 03
- BLOCK 9 - PROPOSED GA PLAN - ROOF
- BLOCK 10 - GA SECTIONS - SHEET 1
- BLOCK 10 - PROPOSED GA PLAN - LEVEL 00
- BLOCK 10 - PROPOSED GA PLAN - LEVEL 01
- BLOCK 10 - PROPOSED GA PLAN - LEVEL 02
- BLOCK 10 - PROPOSED GA PLAN - LEVEL 03
- BLOCK 10 - PROPOSED GA PLAN - ROOF
- BLOCK 10 - GA ELEVATIONS - SHEET 1
- BLOCK 11 - PROPOSED GA PLAN - LEVEL 02
- BLOCK 11 - PROPOSED GA PLAN - LEVEL 03
- BLOCK 11 - PROPOSED GA PLAN - ROOF
- BLOCK 11 - PROPOSED GA ELEVATIONS - SHEET 1
- BLOCK 11 - PROPOSED GA ELEVATIONS - SHEET 2
- BLOCK 11 - PROPOSED GA SECTIONS - SHEET 1
- BLOCK 11 - PROPOSED GA PLAN - LEVEL 00
- BLOCK 11 - PROPOSED GA PLAN - LEVEL 01
- SITE - PROPOSED SITE SECTIONS
- SITE - PROPOSED GA PLAN - LEVEL 00
- SITE - PROPOSED GA PLAN - LEVEL 01
- SITE - PROPOSED GA PLAN - ROOF
- SITE LOCATION PLAN
- SITE - PROPOSED GA ELEVATIONS - SHEET 1
- SITE - PROPOSED GA ELEVATIONS - SHEET 2
- SUSTAINABLE TRAVEL PLAN
- TRANSPORT ASSESSMENT
- VOLUME 2 - APPENDICES_1
- VOLUME 2 - APPENDICES_2
- VOLUME 2 - APPENDICES_3
- VOLUME 2 - APPENDICES_4
- LANDSCAPE GENERAL ARRANGEMENT PLAN
- LOW LIGHTS TAVERN DETAIL AREA_
- HARDWORKS GENERAL ARRANGEMENT PLAN
- SOFT WORKS GENERAL ARRANGEMENT PLAN
- INDICATIVE PLANTING DETAILS_SHEET 1 OF 2_
- INDICATIVE PLANTING DETAILS_SHEET 2 OF 2_
- PLANNING STATEMENT
- AFFORDABLE HOUSING STATEMENT
- VIABILITY STATEMENT
- COAL MINING RISK ASSESSMENT REPORT
- FLOOR RISK ASSESSMENT
- DRAINAGE STRATEGY REPORT
- DRAINAGE STRATEGY
- STATUTORY BNG METRIC
- GROUND GAS ASSESSMENT
- PHOTO SHEET A
- PHOTO SHEET B
- PHOTO SHEET C
- LVA SEPT 25 V1
- ENERGY AND SUSTAINABILITY REPORT
- PRELIMINARY SOURCES (DESK) STUDY REPORT
- ARCHAEOLOGICAL DESK BASED ASSESSMENT
- HERITAGE STATEMENT
- DESIGN AND ACCESS STATEMENT
- DESIGN AND ACCESS STATEMENT - APPENDIX A
- NOISE IMPACT ASSESSMENT
- AIR QUALITY ASSESSMENT
- COAL MINING RISK ASSESSMENT
- COAL MINING RISK ASSESSMENT
- COAL MINING RISK ASSESSMENT
- SITE PHASE 2 SITE INVESTIGATION REPORT
- ECIA AND BNG STATEMENT
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with North Tyneside for determination, against a statutory target of thirteen weeks. Over the last year North Tyneside decided full applications in a median of 64 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Buildings Within The Former Tyne Brand Site Tanners Bank North Shields Tyne And Wear
Demolition of unsafe buildings within the site of former Tyne Brand in conjunction with a Court Order. Buildings 1,1a & 2. Alterations to the chimney stacks of Low Lights Tavern.
Granted Full applications Demolition 20 docsMajor scheme -
Buildings Within The Former Tyne Brand Site Tanners Bank North Shields Tyne And Wear
Demolition of unsafe buildings within the site of former Tyne Brand in conjunction with a Court Order. Buildings 1,1a & 2. Alterations to the chimney stacks of Low Lights Tavern.
Granted Heritage and listed buildings Demolition 15 docs -
Low Lights Tavern Brewhouse Bank North Shields Tyne And Wear NE30 1LL
94% historically approved · decision due ~6 May
Construction of a new chimney required as part of the wider Tyne Brand redevelopment (25/01299/FUL). Connection of the existing kitchen flue and log burner flue into a new vertical chimney to be constructed within the footprint of a new building proposed adjacent to The Low Lights Tavern
Awaiting decision Heritage and listed buildings 7 docs -
Former Caley Fisheries Processing Unit Tanners Bank North Shields Tyne And Wear NE30 1JH
Demolition of toolshed
Granted Full applications Demolition 12 docsMajor scheme -
Land At Former Coleman N E Ltd Site Walker Place North Shields Tyne And Wear
Discharge of conditions 3, 13, 14, 15, 16, 17 and 27 of planning approval 21/01891/FUL
Granted Conditions 25 docs -
The Irvin Buildings Union Quay North Shields Tyne And Wear
Installation of new aluminium windows
Refused Full applications Windows or glazing 8 docsMajor scheme
Other full applications
In North Tyneside
-
26/01299/FUL Awaiting decision
58 Locomotion Way North Shields Tyne And Wear NE29 6XF
Change of use from C3 (residential) to C2 (childrens care home) (retrospective)
-
26/01276/FUL Awaiting decision
Unit 4 Elm Road West Chirton Industrial Estate North North Shields Tyne And Wear NE29 8SE
Proposed extension to existing single storey unit to provide three additional bays, extending the building in line with the existing structure
-
26/01010/FUL Decided
Killingworth Young Peoples Club Garth Twenty One Killingworth Newcastle Upon Tyne NE12 6SE
Proposed single storey extension ancillary to existing building (DAYTIME BAT WALKOVER SURVEY submitted 24.08.26)
-
26/01265/FUL Awaiting decision
Churchill Pavilion At Churchill Playing Fields Hartley Avenue Whitley Bay Tyne And Wear NE26 3NS
Installation of concrete steps in the embankment to provide access between the pavillion and the cricket pitch
-
26/01260/FUL Awaiting decision
Employment Services Camden House Commercial Centre Howard Street North Shields Tyne And Wear NE30 1ND
Refurbishment works to an existing commercial building, including replacement of existing timber windows with white uPVC double-glazed windows within existing openings