Planning application
Banwell Bypass Land To North And East Of Banwell Including Mitigation Highway Land In Sandford, Winscombe And Churchill
Relates to 22/P/1768/R3EIA
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Request for the partial discharge of details reserved by conditions 27(a) (Means of restraint for cyclists and horse riders adjacent to embankments) and 27(c) (Control feature at the terminus of Eastermead Lane) from the Banwell Bypass and Highway Improvement Scheme application 22/P/1768/R3EIA.
As published by the council, reference 25/P/1574/AOC
Application record
- Reference
- 25/P/1574/AOC
- Type
- Approval of Condition
- Status
- Registered
- Received
- 1 Aug 2025
- Validated
- 1 Aug 2025
- Ward
- Banwell And Winscombe
- Parish
- Winscombe And Sandford
Site history
Applications at this address on the North Somerset register
This site has had 4 applications since 2022: 2 approved, 0 refused.
-
25/P/2521/AOC Granted
Banwell Bypass Land To North And East Of Banwell Including Mitigation Highway Land In Sandford, Winscombe And Churchill
Request to re discharge condition numbers 7(b), 7(f) and 29 (Phase 2b Riverside Bridge and Phase 2d Landscape Planting) on application 22/P/1768/R3EIA
-
25/P/2300/AOC Awaiting decision
Banwell Bypass Land To North And East Of Banwell Including Mitigation Highway Land In Sandford, Winscombe And Churchill
Request to discharge condition numbers 4 (Construction Management Plan), 5 (CEMP), 6 (LEMP), 7A (Hard Landscaping), 7C (Street Furniture and Equipment), 7D (Bicycle Storage and hubs), 7G (Street Lighting), 7H (Bus Stop Infrastructure), 7J (Boundary Fences and Treatments),7K (Surface Water drainage), 7L (Measures to prevent unauthorised access along Shared use paths), 7M (Signage Strategy), 8 (Speed monitoring plan (NSC scope) 9 (Surface Water drainage) 19 (Road Safety Audit) 27E (Speed reduction measures at Sidcot road, Hillier's Land and Dinghurst Road) 27F (Pedestrian Facilities at Nye Road junction) 27G (Bus Bays on A368/Greenhill Road by Sandford Primary School) 27H (PRoW AX14/21 and A368/Greenhill Road Cyclist crossing point), 27I (Crossing point PRoW AX14/36 junction with Church Lane), 27J (Crossing point/ narrowing for upgraded PRoW AX14/36 junction with Ladymead Lane), 27K (Bus stop improvements at Hilliers Lane/Dinghurst Road (A368), 27L (Bus stop buildouts east of the Railway Inn), 28A (Vehicle tracking), 28C (Vehicle tracking) and 30 (Road lighting design) on application 22/P/1768/R3EIA
-
22/P/1768/R3EIA Granted
Banwell Bypass Land To North And East Of Banwell Including Mitigation Highway Land In Sandford, Winscombe And Churchill
Construction of a 3.3km single carriageway road from the A371 Summer Lane to A368 Towerhead Road, including a 3m shared use path to Sandford, one bridge, ten culverts, associated infrastructure, and landscaping. Construction of a 0.63km (including junction link to Banwell Bypass) single carriageway Southern Link Road, including associated infrastructure and landscaping. Mitigation and enhancement measures, which consist of environmental mitigation and enhancement measures in connection with the Banwell Bypass and the Southern Link including flood compensation areas, planting and habitat creation, attenuation basins, replacement playing fields at Banwell Football Club, associated infrastructure and landscaping. Placemaking improvements within Banwell, comprising mitigation and enhancement measures to the public realm. Demolition of a wall at 25 Castle Hill. Active travel routes including works to footpaths, cycleways, and bridleways. Improvements to the wider local road network in Sandford, Churchill, Winscombe and Locking and creation of shared use paths between Sandford and Churchill and Langford and Churchill
Timeline
Dates from the published record
-
1 Aug 2025
Received by North Somerset
-
26 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 26 September 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
North Somerset took a median of 56 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
-
22/P/1768/R3EIA Granted
Banwell Bypass Land To North And East Of Banwell Including Mitigation Highway Land In Sandford, Winscombe And Churchill
Construction of a 3.3km single carriageway road from the A371 Summer Lane to A368 Towerhead Road, including a 3m shared use path to Sandford, one bridge, ten culverts, associated infrastructure, and landscaping. Construction of a 0.63km (including junction link to Banwell Bypass) single carriageway Southern Link Road, including associated infrastructure and landscaping. Mitigation and enhancement measures, which consist of environmental mitigation and enhancement measures in connection with the Banwell Bypass and the Southern Link including flood compensation areas, planting and habitat creation, attenuation basins, replacement playing fields at Banwell Football Club, associated infrastructure and landscaping. Placemaking improvements within Banwell, comprising mitigation and enhancement measures to the public realm. Demolition of a wall at 25 Castle Hill. Active travel routes including works to footpaths, cycleways, and bridleways. Improvements to the wider local road network in Sandford, Churchill, Winscombe and Locking and creation of shared use paths between Sandford and Churchill and Langford and Churchill
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in London
178 applications on PlanIndex · across 41 councils · 98% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
12 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with North Somerset for determination, against a statutory target of eight weeks. Over the last year North Somerset decided condition discharge and variation applications in a median of 52 days. More in our guide to how long planning decisions take.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Other condition discharge and variation applications
In North Somerset
-
26/P/1755/AOC Awaiting decision
Weston-super-Mare Railway Station Station Road Weston-super-Mare BS23 1XY
Request to discharge condition 4 (Walling and Roofing Samples) on application 24/P/1307/LBC.
-
26/P/1744/AOC Awaiting decision
Carpenters Tavern Wells Road Dundry Bristol BS41 8NE
Request to Discharge Condition 5 (Kitchen Extraction) on application 25/P/1400/FUL
-
26/P/1713/AOC Awaiting decision
Box Bush Cottage North End Road Yatton BS49 4AT
Request to discharge conditions 25 (Travel Plan) and 30, (Fire Hydrant Locations) on application 21/P/1727/FUL.
-
26/P/1703/AOC Awaiting decision
18 Rodmoor Road Portishead BS20 7JE
Request to discharge conditions 3 (Privacy Screen) and 4 (Hedge) on application 23/P/1033/FUH.
-
26/P/1071/AOC Granted
Woodmans Cottage West Hay Road Wrington Bristol BS40 5NW
Request to discharge conditions 3 (Arboricultural), 6 (LEMP) and 10 (SUDS) on application 25/P/2487/FUL