Planning application
Manor Caravan Park North Walsham Road Happisburgh Norwich Norfolk NR12 0AN
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Change of use of land for expansion of existing caravan park including siting 46 additional static caravans, repositioning of touring caravan / tenting area and associated works.
As published by the council, reference PF/26/1351
Application record
- Reference
- PF/26/1351
- Type
- Full Planning Permission
- Status
- Pending Consideration
- Received
- 24 Jun 2026
- Validated
- 2 Jul 2026
- Ward
- Happisburgh
- Parish
- Happisburgh
- Decision by
- Delegated Decision
- Postcode
- NR12 0AN
Timeline
Dates from the published record
-
24 Jun 2026
Received by North Norfolk
-
2 Jul 2026
Validated
Checked as complete and ready for consideration.
-
24 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 27 August 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
North Norfolk took a median of 59 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Pegasus Group Ltd Agent
1,238 applications on PlanIndex · across 171 councils · 91% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
45 documents on file for this application
- Visual appraisal
- Supports - first floor flat 44 elbe street
- Arboricultural officer
- Objection email
- Economic development response
- Landscape response
- Supports-fair maiden shellfish
- Supports - keepers lodge woodland holiday park cromer road
- Supports - whitehaven 104a mundesley road
- Lead local flood authority
- Highways response
- Public rights of way response
- Environmental health response
- The happisburgh parish clerk
- Environmental health response
- Supports - 15 damgate back lane
- Supports - wayside stables the street
- Supports - duke house the street
- Notice to highways form
- Notice email to highways
- Ownership cert b
- Application form
- Tree survey & constraints plan
- Caravan standard elevations (manor caravan park)
- Site location plan
- Site layout
- Nutrient neutrality assessment and mitigation strategy (nnams)
- Flood risk assessment / drainage strategy
- Flood risk assessment / drainage strategy
- Flood risk assessment / drainage strategy
- Nutrient neutrality budget calculator
- Transport statement
- Topographical survey overview
- Ai declaration
- Contamination screening form
- Net zero statement
- Covering letter
- Landscape masterplan
- Bng metric
- Preliminary ecological appraisal
- Biodiversity net gain assessment report
- Planning statement
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with North Norfolk for determination, against a statutory target of eight weeks. Over the last year North Norfolk decided full applications in a median of 149 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Plots 8 & 9 Land South Of North Walsham Road Happisburgh
Variation of condition 1 (approved plans) of reserved matters approval PM/16/0428 to allow provision of sun lounges to rear of plots 8 & 9 and introduction of french doors with fenestration alterations to plot 8
Granted Amendments Windows or glazing 18 docs -
Sites Off North Walsham Road Happisburgh
95% historically approved · decision due ~30 May
Erection of nine replacement dwellings and reinstatement of former residential land to provide amenity land, without complying with condition 10 (off-site highway improvement works) of outline planning permission PO/12/0423 to reduce the extent of works to overcome section 278 issues
Awaiting decision Amendments 7 docs -
Outside White Tail Lodge North Walsham Road Happisburgh Norfolk
Notification of intention to erect 2 x 7.3m wooden poles for installation of fixed-line broadband apparatus - Ref ZSX626EA
Decided -
Prospect House Church Street Happisburgh Norwich Norfolk NR12 0PN
Front Low Brick/Flint Wall Boundary. 1. Lapsed Holly Hedge stems x8. 2-4 meters. Fell to ground to allow existing Yew trees to flourish. Front garden. 2. Pine trees x2. 10 meters. Remove larger low deadwood only. Right hand side Boundary. 3. Holly tree. 4 meters. Lapsed. Grown under Holm Oak into neighbouring garden. Poor form. Fell to ground level. Rear Boundary. 4. Wild Cherry. 5 meters. Lapsed. Grown into neighbours and over flint/brick wall. Damage probable. Fell to ground level. Orchard. 5, 6 and 7. Apple x3, 3 meters. Poor form. Formative prune 3 to 2.5 meters. 8. Greengage. 3 meters. Poor form. Formative prune 3 to 2.5 meters. Deadwood. Fungus found on stem. (Phelinus).
Granted Trees 2 docs -
The Old Tythe Cottage North Walsham Road Happisburgh Norwich Norfolk NR12 0QS
T1 - Pine - To remove the 3 lowest limbs on the north side of the tree back to the stem to rebalance the existing tree. The height of the tree is 14m.
Granted Trees 4 docs -
Old Tythe Cottage North Walsham Road Happisburgh Norwich NR12 0QS
Remove Conifer due to damaged caused to grounds and close proximity to property (full explanation on application form)
Decided Trees 5 docs
Other full applications
In North Norfolk
-
PF/24/0778 Withdrawn
Kingfisher Hotel 12 High Street Stalham Norwich Norfolk NR12 9AN
Change of use of vacant hotel (Class C1) to 8 self-contained flats (Class C3), external alterations
-
PF/26/1847 Awaiting decision
Briarwood Lodge Sheringwood Beeston Regis Sheringham Norfolk NR26 8TS
Change of use of detached residential annexe to a wellbeing studio for counselling and massage therapy (Class E)
-
PF/25/0902 Granted
Forest Park Northrepps Road Northrepps Norfolk
Installation of sections of new footpath, along with upgrade of surfacing of existing areas used as permissive footpaths to create a single new connected walkway with rest stop areas and interpretation boards (part retrospective)
-
PF/26/0200 Granted
Land West Of 9 The Green Felbrigg Norfolk
Installation of a below-ground electricity supply to amenity land, together with associated engineering works including the formation of an earth bund and minor alterations to the site access (part retrospective).
-
PF/26/1749 Awaiting decision
Well Cottage Back Lane West Beckham Holt Norfolk NR25 6PH
Erection of two single storey dwellings