Planning application
Units 3 And 4 Orchard Road Royston Hertfordshire SG8 5HA
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Erection of non-permanent modular ancillary storage building.
As published by the council, reference 26/02385/FP
Application record
- Reference
- 26/02385/FP
- Category
- Full applications
- Status
- Registered
- Received
- 22 Sep 2026
- Validated
- 22 Sep 2026
- Postcode
- SG8 5HA
Timeline
Dates from the published record
-
22 Sep 2026
Received by North Hertfordshire
-
8 Oct 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 17 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
North Hertfordshire took a median of 48 days over the applications it decided in the last year.
What happens while it is decided
This application is with North Hertfordshire for determination, against a statutory target of eight weeks. Over the last year North Hertfordshire decided full applications in a median of 67 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Land At The South End Of Anglian Business Park Orchard Road Royston Hertfordshire
Temporary change of use of vacant industrial land for 5 years for use as an open storage yard (Use class B8) to include construction of vehicular access, layout of hard surfaced area, construction of security fencing and all ancillary works.
Granted Full applications 20 docs -
9 Orchard Way Royston Hertfordshire SG8 5EY
Part single storey, part two storey rear extension following demolition of existing rear outbuilding (as amended by plan ROY/CB/21/02 Rev PD2/A received 7th September 2021)
Granted Householder Extension Demolition 5 docsSmall domestic -
9 Orchard Way Royston Hertfordshire SG8 5EY
Part single storey, part two storey rear extension following demolition of existing rear outbuilding
Refused Lawful development Extension Demolition 4 docsSmall domestic -
Land At The South End Of Anglian Business Park Orchard Road Royston Hertfordshire SG8 5TW
Details reserved by Condition 6 (Planting Plan and Schedule) of Section 73 application reference 25/03143/S73 granted on 12.02.2026.
Decided Conditions -
Gamelands 10A North Close Royston Hertfordshire SG8 5EZ
Installation of heat pump (description amended 23.09.2024).
Granted Householder 8 docsDomestic -
Land In Front Of 22 Orchard Way Royston Hertfordshire SG8 5EX
Installation of 9m pole.
Granted 4 docs
Other full applications
In North Hertfordshire
-
26/00298/FP Decided
Hobbs Close Garage London Road St Ippolyts Hitchin Hertfordshire SG4 7NJ
Erection of one detached 4-bed dwelling following demolition of existing garage building as revision of previously approved planning permission 21/00298/FP granted 26.03.2021.
-
26/01022/FP Awaiting decision
Service Station Bedford Road Hitchin Hertfordshire SG5 2UG
Installation of parcel lockers following removal of existing locker and installation of paved pathway.
-
26/02400/FP Awaiting decision
Greenbanks London Road St Ippolyts Hitchin Hertfordshire SG4 7NJ
Erection of four dwellings including cycle storage, parking, hard and soft landscaping, and alterations to access layout following demolition of existing dwelling and other buildings.
-
26/02392/FP Awaiting decision
Land South Of 14 High Street Graveley Hertfordshire SG4 7LB
Erection of one detached self-build dwelling including parking, cycle store, bin store, Air Source Heat Pump, alterations to ground levels and soft and hard landscaping.
-
26/01937/FP Decided
Hitchin Town Hall Brand Street Hitchin Hertfordshire SG5 1HX
Decarbonisation works including provision of secondary glazing to existing windows, the provision of insulation to the roof void above the main hall, replacement of mechanical plant including the removal of gas boilers and the installation of Photovoltaic (PV) panels and Air Source Heat Pump (ASHP)